Lukasz Krzempek TE-VSC-DLM 28th WP8 Bi-weekly meeting Tuesday, 24 November 2015 Vacuum layout (Experimental side)

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
Update on Q1 TAS REGION (18 to 22m), layouts. D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
23 rd WP8 Bi-weekly meeting Lukasz Krzempek (TE-VSC-DLM) TAS-Q1 – vacuum equipment design.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Kapton module ass. Spacers for pins 3.6 m m 1.25 mm.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
TAS-Q1 Status & what if exercise Etude [HL-LHC] TAS-Q1.
CMS TAXS REGION D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting
ELLIPTICAL HEAD PROTECTING COVER 01_INSTRUCTION DISCONNECTING THE ELLIPTICAL HEAD.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Lukasz Krzempek TE-VSC-DLM 29th WP8 Bi-weekly meeting Tuesday, 15th November 2015 Vacuum layout (Experimental side)
A liner in the Corrector package A Cu liner has been inserted in the gap between the CBT and the coil aperture of all the corrector package elements (see.
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
SPL RF coupler: integration aspects
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
L. Gentini, A. Bertarelli, F. Carra
LBNF CAD models, Drawings and Component list
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
NA62 LAV Anti1 REMOVAL & TESTS
RTML Vacuum System RDR Summary FermiLab October 24, 2007
INSTALLATION SEQUENCE
Preliminary Y-chamber specifications – First draft
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
Far Detector Activities Late 2017 – Early 2018
Design of Distribution Feedbox at LHC P7
Design of Q1 TAS Vacuum Sector
Challenges for FCC-ee MDI mechanical design
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Integration and IR Hall
Assembly instructions for M-K all bolt together hoppercone kit.
Magnetic gap calculation
Beam Finder Wire Assembly Undulator System
IHEP Cryomodule Status
X-Rays made by P. Lepeule (TE/VSC) and J-M Dalin (EN/MME)
BGC Collaboration Meeting –
Enclosure openings with wires
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Presentation transcript:

Lukasz Krzempek TE-VSC-DLM 28th WP8 Bi-weekly meeting Tuesday, 24 November 2015 Vacuum layout (Experimental side)

Lukasz Krzempek TE-VSC-DLM Current vacuum layout TAS Gate valve assembly TAS side VAX-BPM assembly Gate valve assembly Chamber side

Lukasz Krzempek TE-VSC-DLM VAX-BPM assembly 740[mm]-frame length 1275[mm]-from bellow to bellow (installation length of bellows) 2078[mm]-from TAS wall to bellow’s quick flange

Lukasz Krzempek TE-VSC-DLM Gate valve assembly - TAS sideGate valve assembly - IR side

Lukasz Krzempek TE-VSC-DLM General view - ATLAS experiment Different position of Angle valves for ATLAS and CMS

Lukasz Krzempek TE-VSC-DLM Horizontal position of angle valves determined by given envelope – ATLAS experiment Front view Top view

Lukasz Krzempek TE-VSC-DLM Side view of vacuum layout – ATLAS experiment Gate valve from IR side intended to install on chamber support On-going studies on another solution aiming to avoid bellows and its compressing mechanisms -> valves directly attached to TAS and exp. vacuum chambers Envelope length available for ATLAS vacuum layout – 1789[mm]

Vacuum layout from ATLAS experiment fitted in envelope available for CMS detector Lukasz Krzempek TE-VSC-DLM Horizontal position for angle valves not possible in CMS layout

Lukasz Krzempek TE-VSC-DLM General view and modifications of vacuum layout - CMS experiment ! Vertical position of angle valves for CMS experiment Next slide

Assumed 6[mm] gap between head of angle valve and VAX-BPM support to ease maintenance Lukasz Krzempek TE-VSC-DLM Modification of vacuum layout - CMS experiment New vertical position for angle valves demands 25[mm] extension of tube equipped with bellow and actuator

Lukasz Krzempek TE-VSC-DLM Vertical position of angle valves determined by given envelope – CMS experiment Front view Top view

Lukasz Krzempek TE-VSC-DLM Side view of vacuum layout – CMS experiment Up to date design shows handling issues - transport Envelope length available for CMS vacuum layout – 2048[mm]

Lukasz Krzempek TE-VSC-DLM d models: ST – CMS ST ATLAS