Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.

Slides:



Advertisements
Similar presentations
FPGA Configuration. Introduction What is configuration? – Process for loading data into the FPGA Configuration Data Source Configuration Data Source FPGA.
Advertisements

24 April 2007G. Rakness (UCLA) 1 Power cuts at Green Barracks/SX5 False fire alarms from the central fire alarm system (incendie central) cut power to.
22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
Martin von der Mey, EMU at CMU, October ALCT and TMB Status Martin von der Mey University of California Los Angeles ALCT production statusALCT production.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
Using the Trigger Test Stand at CDF for Benchmarking CPU (and eventually GPU) Performance Wesley Ketchum (University of Chicago)
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
University of Management & Technology 1 Operating Systems & Utility Programs.
ATLAS SCT/Pixel TIM FDR/PRR 28 July 2004 Firmware - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane, Martin Postranecky TIM Firmware.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
MCTS Guide to Microsoft Windows Vista Chapter 4 Managing Disks.
Gregory PawloskiAugust 22, 2002 MPC Testing Progress.
Status of the CSC Track-Finder Darin Acosta University of Florida.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
RPC Trigger Software. Michał Pietrusiński Hardware setup VME Bit3 Controller Link Board 1Link Board 2Link Board 3Link Board 4 Trigger Board Pattern Unit.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Samuel Silverstein Stockholm University CMM++ firmware development Backplane formats (update) CMM++ firmware.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
Optical TMB Mezzanine Production Readiness Review J. Gilmore N. Amin, V. Khotilovich, V. Krutelyov, A. Safonov, A. Schneider, I. Suarez (Texas A&M University)
UCLA Group Meeting March 20, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari March 20, 2014.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Software for tests: AMB and LAMB configuration - Available tools FTK Workshop – Pisa 13/03/2013 Daniel Magalotti University of Modena and Reggio Emilia.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Chapter 5: Using System Software
Update on CSC Endcap Muon Port Card
CSC Synchronization Procedure and Plans
VME Bus error A possible error condition for TMB whose firmware has been “misloaded” is to cause Bus Error on VME crate controller (VCC) at power up… Under.
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
University of California, Los Angeles Endcap Muon Purdue
“Golden” Local Run: Trigger rate = 28Hz
New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister,
University of California Los Angeles
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
CSC Trigger Primitives Test Beam Studies
University of California Los Angeles
TMB and RAT Status Report
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
Configuring the Peripheral Crates
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
CSC Electronics Problem Report CSCE I&C
Presentation transcript:

Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand at CERN. Setting up computer, crate controller today. David Saltzberg is coming to CERN on Sunday with the remaining equipment. Just need to plug in some things, move rails around on the rear of the crate (to accommodate RAT board)---Should be done by Monday if things go okay.

Andrew Peck 2 CSC OTMB Firmware Meeting February 21, 2014 UCLA TMB Test Software Discussed with Karoly and Jinghua about the best approach to adapting the UCLA TMB test software Both were very much in favor of extracting and porting selected components of the software into the emuLib system. Shouldn’t be a problem.. Hoping to do a very simple port, leaving the UCLA code mostly as-is.. Write a wrapper around needed emulib functions and minimize having to rewrite code. Right now removing Microsoft Visual C++ components of the software and rewriting with standard C++ libraries. Starting to work out a basic framework for porting the code.. Identifying what needs to be translated, finding emuLib equivalents. Starting with muon injection code. Can work on other tools if they’re wanted

Andrew Peck 3 CSC OTMB Firmware Meeting February 21, 2014 Muonic timing Working with Indara, Jason on investigating the problems with ALCT muonic timing. Issues are more fundamental than just muonic timing.. ALCT-tx windows aren’t being found, muonic timing capabilities have been cannibalized to compensate for this. Likely conflated issues of software + firmware. Two cases.. maybe related: 1.1D-Tx and 1D-Rx window are both found, but the 2D scan fails to find any good spots for certain TOFs. This is a feature of more recent software versions, possibly related to pipeline depth scan. Right now comparing two versions (working + nonworking) of code to track down what change introduced this. Indara reports that in these cases, a good working window can found based on the 1D scans, despite the 2D scan failing.. 2.No 1D-Tx window is found for certain TOFs. Firmware? Firmware+software interaction? Will keep testing..

Andrew Peck 4 CSC OTMB Firmware Meeting February 21, 2014 Extra slides for Jason/Yuriy …

Andrew Peck 5 CSC OTMB Firmware Meeting February 21, 2014 vme_tst_v7 Main Menu 1: TMB Slot [%2.2i] adr=%6.6X\n",islot,base_adr); 2: Read ID Register 3: Read Boot Register 4: Peek/Poke Address 5: Read Trigger/Error/Discard counters 6: Read/Write 3D3444 Delays with State Machine 7: Hard Reset TMB 8: Hard Reset ALCT 9: Read DMB Raw Hits RAM 10: Walking 1 Tests 11: Read ADC+Status Register 12: Read FPGA and User PROM IDcodes+RAT 13: Read Hardware Serial Numbers 14: Crate Scan 15: Read Loopback Backplane JTAG Chain 16: Trigger Tests 17: MPC Tests 18: TMB Automatic full test: Loop-back backplane 19: RAT Tests 20: TTC Command/FMM Status 21: Sequencer State/Seq Debug/Buffer Queue/L1A Queue 22: MPC Accept 23: ALCT+CFEB Loopback Tests 24: Boot Register Test 25: RAT Automatic full test: Requires TMB+backplane 26: Scope snapshot of current system 27: Trim Vcore or Vtt 28: TMB Unjam, try to clear a jammed TMB 29: Program Xilinx PROMs 30: JTAG PROM file utilities 31: VME PROM file utilities 32: Check U76 JTAG Bus-Hold circuit 33: VME register dump/compare 34: Load VME registers from dump file 35: Playback event dump to display header and raw hits 36: Playback event dump into TMB, compare result 37: Read/Write Phaser Delays 38: Fire VME sysreset 39: VME bus contention test 40: GTX Optical Receiver Status

Andrew Peck 6 CSC OTMB Firmware Meeting February 21, 2014 Submenu 16: Trigger Tests TMB Trigger Test Menu: 1: Inject ALCT 2: Inject CLCT 3: Inject ALCT+CLCT 4: Inject ALCT+CLCT + readout 5: Fire ext_trig + L1A to ALCT + readout ALCT RAM 6: Fire CLCT ext trig linked with ALCT ext trig 7: Fire CLCT pattern injector, check CLCT0 8: External trigger ALCT+CLCT 9: External trigger ALCT 10: External trigger CLCT 11: ext Trig ALCT+CLCT with GTL pulser 12: ext Trig ALCT+CLCT with GTL pulser check CRC 13: Check bxn reset and increment 14: Fire L1A-only event. check readout 15: Fire VME trigger + readout