LBT Q3 2007 Engineering Review ESW Engineering Software.

Slides:



Advertisements
Similar presentations
System Administrator Roles in Supporting Site Customizations Lynn Ritger Software Integrations Coordinator, FASTER Asset Solutions.
Advertisements

Knowledge Pathways in IT
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
Technology Solutions, LLC MU April Thompson – Project Manager Neera Desai – Operations Advisor Charles Lively – Technical Advisor.
Institute of Technology, Sligo Dept of Computing Networking Management Semester 4 Chapter 8.
Duties of a system administrator. A system administrator's responsibilities typically include:
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
CSC 386 – Computer Security Scott Heggen. Agenda Security Management.
Information Systems Development. Outline  Information System  Systems Development Project  Systems Development Life Cycle.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
LBT Q Engineering Review MCSC Mount Control System.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
NETWORK ADMINISTRATOR. EXAMPLES OF SOME COMPUTING RELATED CAREERS Multimedia Artist / Graphics Artist Information System Manager Computer Scientist Network.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Software Review GCS – Guiding and Active Optics.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Engineering Review SAB Static Balancing.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
Career & Technical Education ICE Testing Procedures & Available Resources Dr. Lupe Ferran Diaz, Executive Director.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
What does a Civil Engineer do?
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
Design, development, support and management of hardware, software, multimedia and systems integration services. Example Careers Computer System Engineer.
LBT Q Engineering Review Primary Mirror Cells.
RHH IMAGING PROJECT 2016 PRESENTATION Anita Williams IMG 305.
Presenter: Igna Visser Date: Wednesday, 18 March 2015
Computer Jobs Data Entry Operators Computer Librarians
The Linux Command Line Chapter 14
Brother Printer Technical Support Number
UNC Banding Decision Bands Bret Naber CHECO – Salary Banding
Quality Computer Training
Quality Computer Training
Quality Computer Training
Quality Computer Training
Quality Computer Training
Quality Computer Training
Quality Computer Training
Quality Computer Training
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Quality Computer Training
Quality Computer Training
Quality Computer Training
Quality Computer Training
Presentation transcript:

LBT Q Engineering Review ESW Engineering Software

26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) ANSYS license remanaged ANSYS license remanaged Cost is less Cost is less Access to all ANSYS technologies Access to all ANSYS technologies Autodesk 2008 still available, installation to be discussed at a future time Autodesk 2008 still available, installation to be discussed at a future time UA site license for Matlab UA site license for Matlab

26-Oct-2007LBT Q Engineering Review Open Issues Technical Technical None None Schedule Schedule Installation of Autodesk 2008 meeting Installation of Autodesk 2008 meeting Financial Financial Cost will increase next year for ANSYS Cost will increase next year for ANSYS Resource Resource None None

26-Oct-2007LBT Q Engineering Review Progress (Q3/2007) Vault clean up ongoing Vault clean up ongoing Troubleshooting any software issues Troubleshooting any software issues Preparing any computer in need of Engineering software installation(s), to be on network, etc. Preparing any computer in need of Engineering software installation(s), to be on network, etc. Assist System Administrators with Engineering group software Assist System Administrators with Engineering group software

26-Oct-2007LBT Q Engineering Review Planning (Q4/2007) Schedule a meeting regarding upgrade to Autodesk 2008 and procedural changes for future software upgrades/installations/etc. Schedule a meeting regarding upgrade to Autodesk 2008 and procedural changes for future software upgrades/installations/etc. Continue to monitor purchasing/licensing/use of Engineering software Continue to monitor purchasing/licensing/use of Engineering software Complete install update/upgrade of MathCAD to necessary computers Complete install update/upgrade of MathCAD to necessary computers Continue to assist System Administrators with Engineering group software Continue to assist System Administrators with Engineering group software Determine UA’s Matlab site license financial impact on current licenses in use by group Determine UA’s Matlab site license financial impact on current licenses in use by group