Date: 25 Sep 12 Presented by: Steve Watts Team Leader Aviation and Missile Research, Development and Engineering Center Presented to: MRL Government /

Slides:



Advertisements
Similar presentations
U Development of Reliability Program Standard GEIA-STD-0009 SE Summit March 2009 Approved for Public Release; Distribution is unlimited.
Advertisements

Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
QuEST Forum 2006 Requirements Handbook 4.0 Overview.
1 ANSI/EIA A STANDARD Earned Value Management Systems Proposed Changes Discussion January 31, 2007 NDIA Program Management Systems Committee.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
ESC/EN Engineering Process Compliance Procedures August 2002.
Attention to Detail in Competitive Procurements Prepared By: Steve Kramer and Chris Whyte Procurement All Hands July 2, 2013.
Best Procurement Practices and Helpful Information August 2011.
SUAS Laboratory – Python Effort
2014 Work Planning Local Program Leadership Team.
The BIM Project Execution Planning Procedure
UNCLASSIFIED / FOR ADVISOR USE ONLY Lance Armbruster Contractor (p.1) The Working Group – An Overview Mr. Lance Armbruster, G7 Mentor.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
1 Lecture 3.9: RFP, SOW and CDRL (SEF Ch 19) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Proposed Updates to Deskbook Gary Stanley 22 July 14.
Is Providing More Technology for C4ISR & Security a Good Idea? Bob Chamberlain President Monterey Technologies, Inc. (831)
Date: 25 Sep 12 Presented by: Steve Watts Team Leader Aviation and Missile Research, Development and Engineering Center Presented to: MRL Government /
EE400D DOCUMENTATION INSTRUCTIONAL SERIES MEETING MINUTES.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
Update MRL Matrix to address STE/SIE Validation Steve Watts AMRDEC Sep 15.
Contract Training Class I
The Role of NCAS Assessments NASA Supply Chain Conference Goddard Space Flight Center November 14, 2007.
Earned Value Management Presented By: Steve Krivokopich May , 2006.
Working Group 2 Report Out Don Szczur Ryan Thompson.
AT&L / Logistics & Material Readiness Office of Deputy Assistant Secretary (Supply Chain Integration) Government Furnished Materiel Requisitions GFP Working.
GEtServices Purchasing Units & Materials Training For Suppliers Request.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Group Three Outbrief Team Members Michael BakerEglin 328 ARSG Tony BumbaloughAFRL/RXMT Scott FrostANSER Michael GanowskyBoeing- Mark GordonNCAT Jim LorenzeRockwell.
1 Overview of SAE’s AS6500 “Manufacturing Management Program” David Karr Technical Advisor for Mfg/QA AFLCMC/EZSM
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of:1 Mrs. Marty Evans SE Forum October 15, 2004 Institutionalizing.
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting April 24, 2007 Prepared by; NDIA IBR Working Group April 15, 2007.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Production EVM Working Group Outbrief August 2010 PMSC.
DoD Procurement Conference and Training Symposium May 13, 2010 Peer Reviews Dick Ginman Deputy Director, DPAP.
Team #1 Gary Stanley.
Finalizing Award Recommendations
Tom Lastoskie Chair Jack Galuardi Vice Chair
Lessons Learned MRL Date: 23 Oct 12 MRL Working Group Steve Watts
Team T² (#2) Tom Lastoskie Lead.
Industrial Assessment Center Database
Overview of SAE’s AS6500 “Manufacturing Management Program”
AM Contracting Guide Proposal
MRL Assessment Thread A Evaluation
DRAFT Implementation Guide
How to properly use the primary MRL Body Of Knowledge References
Society of Reliability Engineers
Relationship between MRLs and AS6500
Presentation on PM2 Peculiararities
GARY STANLEY September 2012 Workshop
Agenda 24 July – 1000 Around the room All 1000 – 1015 Review April meeting action items Jim/Gary 1015 – 1030 DMC 2018 Jim 1030 – 1045 OSD BoK.
2017 MRL Working Group Activities Morgan/Stanley
2018 MRL Working Group Activities Scott Pearl MRL WG
Tom Lastoskie Chair Jack Galuardi Vice Chair
Team T3 (#3) Tom Lastoskie Lead.
Team One Jack Galuardi – SMC/APT Corp Kurt Hogue – PEO-GCS-AMPV
Group 2 Hannah Riffe BAE Systems Paul Sorrells MDA Dave Karr USAF
NERC Reliability Standards Development Plan
Users Guide & Matrix Update Committee
POCs for MRLS.
NERC Reliability Standards Development Plan
Omnibus IV Contracting Strategy Michael D’Alessandro
Mark Robinson FINANCE DIVISION SUPPORT
[Team Name] (e.g. ESH) Team Lead.
Mark Robinson FINANCE DIVISION SUPPORT
Presentation transcript:

Date: 25 Sep 12 Presented by: Steve Watts Team Leader Aviation and Missile Research, Development and Engineering Center Presented to: MRL Government / Industry Workshop UNCLASSIFIED Distribution authorized to DoD and DoD contractors only; Critical Technology; August Other requests for this document shall be referred to the U.S. Army RDECOM, ATTN: RDMR-SEP. MRL Deskbook Section 6 Contract Language MRL Deskbook Section 6 Contract Language

UNCLASSIFIED 2 Yourfilename.ppt Task Review Section 6 “Applying MRLs in Contract Language” MRL Deskbook, version V2.01, dated Jul 11 Determine if templates for Section L, Section M, SOO, and SOW are adequate Provide any recommended changes Task assigned to Air Force, Navy, and Army members that implement these requirements in contracts (“the magnificent three”) –Army – Steve Watts –Air Force – Dave Karr –Navy – Brent Gordon

UNCLASSIFIED 3 Yourfilename.ppt Summary of Recommended Changes Target vs. Required MRL –Change "required" to "target" MRLs (several places) General clean-up for clarity and readability –Where the Deskbook provides a sample paragraph - make it italic and 1 paragraph Section 6.3 –change wording to SOO "and/or SOW" (some services don't use SOOs). Section L –3 lines that use auto spacing (make consistent with rest of document) –Delete reference to specific Deskbook version (reference website only) –Delete reference to MMP (too overwhelming for RFP) - address general approach Section M –Eliminate the example (add statement to follow rating procedure in SSEB Plan) –Additional wording in sample paragraph. SOW Section –Add checklist of typical items to address –Still provide sample paragraph (with a few adjustments)

UNCLASSIFIED 4 Yourfilename.ppt SOW Checklist Checklist of the typical requirements to be addressed in the SOW Contractor shall support assessments of Manufacturing Readiness Assessment conducted using MRL Deskbook as a guide ( Identify timing of assessment or assessments Identify target MRL Government led review of prime, Prime led review of suppliers (using MRL Deskbook as a guide) Selection of suppliers using MRL Deskbook Section 4.3 as a guide Manufacturing Maturation Plan (MMP) for all criteria not at target MRL Contractor provide status at all Program Reviews Ensure appropriate language is in place to adequately support the efforts identified in the threads

UNCLASSIFIED 5 Yourfilename.ppt Word Document (with Track Changes) Attached is the Section 6 Word Document with “Track Changes” This attachment has been updated to incorporate comments provided at the 22 May 12 and 24 Jul 12 MRL Working Group meetings