Set Up-Pick Up Coordination Asset Recovery Cluster Black Belt Brent Wigington Western Mountain West.

Slides:



Advertisements
Similar presentations
Beyond the Help Desk Getting ahead of the game Mihaela Damian Dan Sexton 11 th July 2013 CSCS > School of Clinical Medicine > University of Cambridge.
Advertisements

Quick Recap. Quick Recap The Project Plan Plan Your Work, then Work Your Plan.
1 KING FAHAD UNIVERSITY OF PETROLEUM & MINERALS College Of Environmental Design Construction Engineering & Management Department CEM 515- Quality managenet.
What is Supply Chain Management (SCM). SCM Combination of Art and Science Purpose: to improve the method a company finds raw components it needs to deliver.
1 Chapter 3 Project Organization, Selection, and Definition.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Need A RIDE? Presented by Melvin Thomas Manager Transportation IHCP Annual 2010 APP0045 (09/10)
Six Sigma. What is Six Sigma??  A statistical concept that represents amount of variation in a process relative to a specification  % defect.
Vs Xora Professional Services - INTERNAL. Definition of Xora Professional Services o Types of Services Provided How to Request Xora Professional.
SIX SIGMA OVERVIEW. Six Sigma “ Six Sigma ” refers to tools, processes and cultures made famous by Motorola and General Electric in the 1980s and are.
Managed Print Services. MyOffice PrinterServices HardwareSoftwareTonerPartsLabor Consultative Services Level 1 & 2 Help Desk Triage Increase efficiencies.
Chapter 3 Lean Sigma Projects. What is the relationship of Six Sigma to Lean Sigma? LEAN Targets process efficiency through waste reductions SIX SIGMA.
HP Separation – Tech Data EDI FAQs 1. Tech Data EDI Changes What changes will Tech Data make to their EDI feed? There will be no changes to EDI mapping,
NDIA Systems Engineering Supportability & Interoperability Conference October 2003 Using Six Sigma to Improve Systems Engineering Rick Hefner, Ph.D.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Project Charter Document Control Directory Structure Shared Network Drive 0703-O O-001.xls Data Contacts 0703-S S-001.xls 0703-O-002.
Items Required for Process Hand-off
0 Six Sigma Project Guidance. 1 Roles and Responsibilities of the Finance Support Team Define Savings/Benefits Provide Financial Support – Project Selection.
Project Selection Process Copyright OpenSourceSixSigma.com 1 OSSS LSS Black Belt v9.0 - Control Phase Project Selection Training Materials.
Copyright © Six Sigma Academy International, LLC All Rights Reserved FASCore Follow-Up Discussion April 20, 2006.
Define Phase Jimmie Carr OPERMGT 380 Boise State University.
REDUCTION OF OUTBOUND FREIGHT COSTS - EQUIPMENT Black Belt - Nicole Brannon Champion - Tony Martino MBB - Art Girard FA - Diane Brightwell.
Six Sigma EPM – Version 2 MPUG Demonstration 5/4/2004 Phoenix, Arizona Wayne MacDonald Senior Principal
PRIMO Limited & 6 Sigma By HKU SPACE 6 Sigma Consultant Firm 30-May-2006.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Planning Ahead for Optimal Contact Center Deployment Jim Jenkins
Price Support (Vendor Rebates) Outside Vendor Window Black Belt: Debbi Youmans-McCreary Division: INA - eIKON BU – Ops/Vendor Credits/Southeast.
Project Selection Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
Assets Returned From Lease Project: Bill Cody Black Belt September 25, 2003.
Inconsistent Administration of Sales Commissions Status Report August 28, 2003 Norcross, GA.
IT Asset Reassignment / Moves David Levine Information Technology IKON Network Center.
Project Update Effective Product Launch Vendor Integration Inga Broerman Black Belt Marketing - Corporate.
Contract Setup Accuracy Project Black Belt: Rob Vaughn Week 2 Presentation Define and Measure Phase.
Project Charter Revenue/Sales Implications of Trials Black Belt Jack Thackrah NE Region BS – Malvern PA.
Canon Strategic Marketing Plan - Supply Credits
Working Capital - > 90 Day Delinquency Project – Heath Peacock Finance Tempe, AZ - CCC.
Total Call Process Effectiveness Black Belt – Alan Libbert Function: Operations/Service.
Meter Reads-Method Project Number Black Belt Rob Zinsky Northeast region.
Project Selection & Scoping Overview Deb Dixon. 2 Objectives Explain why effective project selection is so critical Project Selection Approach Characteristics.
Product Promotions Effectiveness Chris Tantakis Canada.
1 Price Support (Vendor Rebates) Registration Cindy Reese Black Belt Finance – Western Region.
Sales Forms Package Art Zieky INA-Sales Operations Macon, Malvern.
David Pasquarello Ikon Office Solutions
Project Chartering & Approval Process
Assets Returned From Lease Project: Bill Cody Operations Columbus OH.
Six Sigma Black (& Blue) Belt: Jeanette Wall. Unapplied Cash-Calculation Error Jeanette Wall Operations Location- Company-wide CANCELLED!
Contract Termination/ Save the Customer Accountability Black Belt-G.K. McCown Service Division BU – Dallas, TX.
National Accounts/Meeting Customer Expectations - Customer Training Marty Brecht - Black Belt INAP.
Service Productivity- Parts Project # Black Belt – Rich Capasso Northeast Region.
Finance Support.
Effective Product Launch Vendor Integration Inga Broerman Black Belt Marketing - Corporate.
Price Support (Vendor Rebates) Outside Vendor Window Black Belt: Debbi Youmans-McCreary Division: INA - eIKON BU – Ops/Vendor Credits/Southeast.
Assets Returned From Lease Project: Bill Cody Black Belt Week 3 Report Out.
Deal Approval Process Project # &
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Northeast BU – Forecasting/Service/ Revenue/Base/Type of Machine.
Contract Setup Project Black Belt: Rob Vaughn Week 3 Presentation Houston, TX.
Unapplied Cash – Canon & Ricoh Credits, Discrepancy in System Project # Black Belt - Jonathan Williams Division- Service/ Order Entry/Vendor.
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Credit/Rebill – Field Service Incorrect Billing. The Problem We are generating invoices for service calls on machines that have contracts, are IKON fixed.
Collections Accountability Leases that Terminate Following Automatic Renewal Tom Merry September 24th, 2003.
Change Development Rework Leonard Sealy Corporate Supply Chain – Rochester, NY.
Meter Reads- Web Meter Effectiveness Project Number Black Belt Cathy Delvalle Atlanta CCC.
Define Phase Wrap Up and Action Items. Define Phase Overview—The Goal The goal of the Define Phase is to: Identify a process to improve and develop a.
Password Escrow Service
Define Phase Wrap Up and Action Items
Quality Management Six Sigma
Vendor Management and Software Asset Management
المحور الأول : تعريف التأجير التمويلي وسنده القانوني
Presentation transcript:

Set Up-Pick Up Coordination Asset Recovery Cluster Black Belt Brent Wigington Western Mountain West

2 Background – Current Process n NASSD & SOW are information gatherers, not schedulers n Delivery Schedule does not include necessary information to schedule n Customer dissatisfaction due to space requirements n Inability to disposition the return device and resale quickly n Manage emergency set up vs. proactive set ups

3 Project Definition n Problem Statement: 75% of the ‘Connected’ new device being delivered cannot be set up while the Delivery People are there. This causes the ‘connected’ old device to be left and picked up later, thus causing an unnecessary trip. n Project Definition: Coordination of Professional Services/Service Techs with Warehouse/Delivery to eliminate 500+ unnecessary follow-up trips n Project Benefits: 500 unnecessary trips per month x $61 per trip $30,500 potential monthly savings $366,000 potential yearly savings

4 Project Definition, Cont’d n Financial Benefits: Reduce delay time to invoice n Project Metric “Y”: Y = # of unnecessary follow-up trips to pick up used devices n Defect Definition: An unnecessary, follow-up trip (to pick up a ‘connected,’ used device that could not be picked up at the time of delivery because ‘connected,’ new device could not be set up to print.) n Leveragability: Project can be leveraged with other BB projects Reduce rework and uncertainty in Professional Service’s coordination process.

5 Project Team n Champion – Mike Jenkins n Process Owner – Dual Ownership n Financial Analyst – Jason Henson n Black Belt – Brent Wigington n Master Black Belt – Dan Douglas n Team Members: IT Support – Rob Judy Traffic– Heath Harris Configuration – George Specialist – Alan Brooks Professional Services -- Open

6 Cost of Delivery n Sample Data - Breakdown of $61.00 per delivery costs from Central, La Mirada, and West Borough

7 30,000’ Process Map n Sale to Connect Process

8 Conflict Resolution

9 Project DMAIC Checklist/Status