Copyright 2005 ITC, LLC The Interstate Traveler Company Presentation to: US Department of Energy - Hydrogen and Fuel Cell Division
Copyright 2005 ITC, LLC What is the Interstate Traveler? Transportation System Solar Grid Municipal Conduit Hydrogen Production & Distribution Energy Storage & Distribution Wireless Internet Access Millions of Tons of Stainless Steel
Copyright 2005 ITC, LLC The Hydrogen Superhighway ITC Rail & Conduit Cluster
Copyright 2005 ITC, LLC 3 Primary Travelers ITC Transports
Copyright 2005 ITC, LLC Unlimited Variations
Copyright 2005 ITC, LLC ITC International Traveler
Copyright 2005 ITC, LLC Rapid Installation
Copyright 2005 ITC, LLC Scalable Geometry
Copyright 2005 ITC, LLC Woodward Traveler
Copyright 2005 ITC, LLC Interstate Highway Integration
Copyright 2005 ITC, LLC Hydrogen Power Conversion ITC Utility Substation
Copyright 2005 ITC, LLC ITC Energy Cycle
Copyright 2005 ITC, LLC Pure Water
Copyright 2005 ITC, LLC Computer Simulations
Copyright 2005 ITC, LLC Computer Simulations ITC Rail Cross Section
Copyright 2005 ITC, LLC Computer Simulations Finite Element Analysis
Copyright 2005 ITC, LLC ITC Suspension System
Copyright 2005 ITC, LLC ITC G-Force Compensator
Copyright 2005 ITC, LLC The Suspension System
Copyright 2005 ITC, LLC ITC Field / Coil Arrangement ITC Slotted Linear Motor Cross Section
Copyright 2005 ITC, LLC ITC Field / Coil Arrangement
Copyright 2005 ITC, LLC ITC Field / Coil Arrangement
Copyright 2005 ITC, LLC ITC Field / Coil Arrangement
Copyright 2005 ITC, LLC ITC Linear Motor Tech
Copyright 2005 ITC, LLC ITC Linear Motor Tech
Copyright 2005 ITC, LLC The Interstate Traveler…
Copyright 2005 ITC, LLC The Ten Deliverables … there are still many others beyond these ten 1.Rapid Transit= $ /minute 2.Hydrogen= $ /kilogram 3.Electricity= $ /kilowatt 4.Energy Storage= $ /kilowatt 5.Fiberoptics= $ /bandwidth 6.Fuel pipelines= $ /gallon or cubic foot 7.Liquid waste= $ /barrel 8.Advertising= $ /sign 9.Brand New Water= $ /liter 10.Internet / Telecom= $ /minute
Copyright 2005 ITC, LLC Supplemental Use of ITC Rail 1.National Security 1.Internet Backbone Backup 2.Real-time Sensor Network 3.Public, Private, Commercial and Military Networks 2.Evacuation of Cities & Coastlines 1.Fast network reconfiguration 2.On demand Transport Deployment 3.Humanitarian & Military Systems 1.Hydrogen / Electricity Production 2.Communications 3.Logistical delivery 4.Tsunami Relief / War Reconstruction
Copyright 2005 ITC, LLC Key Metrics Cost: $10 Million / Mile (2 miles parallel) 4800 tons of steel / mile 85,000 square feet of PV / mile 850,000 watts / mile Standard Installation includes: 3 Transports / 1 mile 2 Traveler Stations / 5 miles 1 ITC Utility Substation / 5 Miles
Copyright 2005 ITC, LLC Eisenhower Interstate Traveler Eisenhower Interstate system 54,000 + miles Basic ‘Round Number’ System Estimates: 162,000 -Transports 22,000 -Traveler Stations 18,000 -Utility Substations 45,900,000,000 -watt/hour capacity (45.9 Billion Watts) 156,656,700,000 -BTU/hour (3.413 BTU/ watt-hour) 1,620,000 -gallons of water per hour 9,720,000 -passenger capacity $540,000,000,000 -cost to build at $10 Million / mile $242,000,000,000 -Annual Public Revenue 9,720,000 -Passenger Capacity 750,000,000 -Tons of Stainless Steel
Copyright 2005 ITC, LLC Public Private Partnership 50% Revenue Sharing for Local Needs 50% Divided into four levels of government based on Statewide performance figures. From Total Revenue: 12.5 % Paid to the Federal Treasury 12.5 % Paid to the State Treasuries 12.5 % Divided among all the Counties per State 12.5 % Divided among all the Local Governments such as Cities, Townships, Villages, Ports and Tribal Lands
Copyright 2005 ITC, LLC Eisenhower Traveler Output 50% Revenue Sharing $242 Billion / year paid to Government Split four ways: $60.5 Billion to the Federal Treasury $60.5 Billion divided among the States $60.5 Billion divided among the Counties $60.5 Billion divided among the local governments.
Copyright 2005 ITC, LLC Next Steps 1.Finalize Proposed Public/Private Partnership 2.Establish ROW and First Installation Site 3.Acquire direct investment of Private Funds 4.Begin integration and build process
Copyright 2005 ITC, LLC Respectfully Submitted Respectfully Submitted by: The Interstate Traveler Company, LLC 9594 Main Street Whitmore Lake, Mi Ph Fx To: United States Department of Energy Hydrogen and Fuel Cell Division 1000 Independence Ave. SW Washington DC
Copyright 2005 ITC, LLC ITC presentation to US DOE Research and Documentation CD 6/1/05