Data Center Update November 5, 2010. Background Studies by Staggs and Fisher Consulting Engineers and Emerson Network Power confirm serious power and.

Slides:



Advertisements
Similar presentations
Challenges in optimizing data center utilization
Advertisements

A CASE STUDY in actual energy conservation
SAN DIEGO SUPERCOMPUTER CENTER at the UNIVERSITY OF CALIFORNIA, SAN DIEGO Green Datacenter Initiatives at SDSC Matt Campbell SDSC Data Center Services.
RiT PatchView Solution
Matt Warner Future Facilities Proactive Airflow Management in Data Centre Operation - using CFD simulation to improve resilience, energy efficiency and.
Large Data Centers Small & Medium Data Centers Computer Rooms & Closets Network-Critical Physical Infrastructure Presented by Ian P. de la Rosa Enterprise.
Cooling Product Positioning
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
PG&E and Altera Data Center Energy Efficiency Project.
Data Centre World Expo 2009 Designing, building and operating high density data centres Kevin Sell Head of Technical Facilities, Telstra International.
Measuring and Validating Attempts to Green Columbia’s Data Center October 14, 2010 Rich Hall Peter M Crosta Alan Crosswell Columbia University Information.
02/24/09 Green Data Center project Alan Crosswell.
Green Data Center?  Reduces Data Center energy costs  Virtual Technology Implementation  Utilization improvement.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
Data Center and Network Planning and Services Mark Redican IET CCFIT Update Feb 13, 2012.
Federal Data Center Consolidation Initiative Karen Petraska August 17, 2011.
Build it yourself Custom configurations High IT expertise “Cooking recipe” Probably higher success Can be ‘sold’ to customers Tied to HW vendor Very.
1 May 12, 2010 Federal Data Center Consolidation Initiative.
High Density Cooling Air conditioning for high density applications
Best Practices in HVAC Design/Retrofit
Server Virtualization: Navy Network Operations Centers
Applying Precision Air Conditioning Systems
SUPERINTENDENT’S RECOMMENDATIONS Capacity Utilization Arlington Public Schools December 3, 2009.
Optimising Data Centre Power Planning and Managing Change in Data Centres - 28th November Cirencester.
University of Michigan, CSG, May 2006 UM/MITC Data Center.
Best Practices for Updating Your IT Infrastructure to Support New Equipment.
New Data Center Update Brian Shannon & Anne Silvester.
Smart Grid: Opportunities in the Data Center January 22, 2010 Charles O’Donnell, Vice President, Engineering Liebert AC Power Emerson Network Power.
New Data Center at BNL– Status Update HEPIX – CERN May 6, 2008 Tony Chan - BNL.
Progress Energy Corporate Data Center Rob Robertson February 17, 2010 of North Carolina.
11 School Board Monitoring Report: Capacity Update Arlington Public Schools April 29, 2010.
ITCD Project List as of 8/27/ # PROJECT NAME PROJECT OVERVIEW Alignment to ITCD Strategic Goal(s) Expected Project Completion Projects Not Started.
SUPERINTENDENT’S RECOMMENDATIONS Capacity Utilization Arlington Public Schools December 17, 2009.
Dealing with Hotspots in Datacenters Caused by High-Density Computing Peter Hannaford Director of Business Development EMEA.
Jon Walton Director of Technology Bay Area Technology Forum November 5, 2009 Technology Consolidation: Fact or Fiction.
BNL Tier 1 Service Planning & Monitoring Bruce G. Gibbard GDB 5-6 August 2006.
Schneider Electric: Total Cooling Solutions for Data Centers
Smarter Greener Learning The PSBA co-location facility Stephen Frith PSBA Commercial Manager.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
ABBYS AQUATICS By: Abby Jacoby. ABBYS AQUATICS Store Somerset, WI What we sell Events Scoop your own fish Stingray Petting Zoo.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
PIC port d’informació científica First operational experience from a compact, highly energy efficient data center module V. Acín, R. Cruz, M. Delfino,
CD-doc-650 Fermilab Computing Division Physical Infrastructure Requirements for Computers FY04 – 07 (1/4/05)
1 ITM 1.2 How IT Decisions Impact Data Center Facilities: The Importance of Collaboration Lars Strong P.E. Upsite Technologies, Inc.
Analysis and Forming of Energy Efficiency and Green IT Metrics Framework for Sonera Helsinki Data Center HDC Matti Pärssinen Thesis supervisor: Prof. Jukka.
Monitoreo y Administración de Infraestructura Fisica (DCIM). StruxureWare for Data Centers 2.0 Arturo Maqueo Business Development Data Centers LAM.
InfraStruXure Systems Alex Tavakalov
SUPERINTENDENT’S RECOMMENDATIONS – Community Forum Capacity Utilization Arlington Public Schools December 9, 2009.
West Cambridge Data Centre Ian Tasker Information Services.
The Genome Sequencing Center's Data Center Plans Gary Stiehr
CD-doc-650 Fermilab Computing Division Physical Infrastructure Requirements for Computers FY04 – 07 (1/4/05)
Expansion Plans for the Brookhaven Computer Center HEPIX – St. Louis November 7, 2007 Tony Chan - BNL.
Example of a LAN Last Update Copyright 2009 Kenneth M. Chipps Ph.D.
How to Build a LAN Last Update Copyright 2007 Kenneth M. Chipps PhD 1.
MENTAL HEALTH CLINIC Siting Process and Analysis.
Dell EMC Modular Data Centers
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
DC Market Trends and the key focus areas within
The Data Center Challenge
MGHPCC as a Platform for MOC
Integrating a Data Center into an Engineering Laboratory Building
Using Heat to Increase Cooling George Hannah BEng (Hons) CEng MIMechE
HIGH-PERFORMANCE COMPUTING SYSTEM FOR HIGH ENERGY PHYSICS
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 Data Center Cooling Market.
Trane Standby Generators
Read Building Relocation Plan
Planning a Network Upgrade
Not All Colocation is Created Equal
Program Proposal to ITGC
Presentation transcript:

Data Center Update November 5, 2010

Background Studies by Staggs and Fisher Consulting Engineers and Emerson Network Power confirm serious power and cooling limitations in the Miller IT Data Center Of 240kW available on the building transformer, approximately 114kW is available for additional IT systems Need short, medium, and long-term options $308,000 provided to address issues $850,000 NSF facilities upgrade and network grant pending

Consultant recommendations Short-term MITC Improvements –Address Physical Issues (blanking panels, organize cables, seal perimeter of room) –Organize and relocate racks –Add cold aisle containment –Reset temperature and humidity settings Add Cooling Capacity –In-row cooling for HPC and systems

MITC Data Center Plans Create New Rack Standard –Integrated power monitoring –Top of rack network switching –In-row cooling –Overhead cable access Implement high density area for new systems Add HPC Phase II Consolidate enterprise systems Consolidate LAN systems

Medium-Term Options Complete virtualization of eligible servers –Dramatically reduce number of servers –Reduce power consumption Utilize MedCenter3 data center –MOU still under negotiation –UofL occupying 1500 square feet –Nucleus has agreed to let us start moving in eqmt Issuing RFP for Co-location Services –Option to lease rack space for a few years 5

New Data Center Need to find a long-term option Looking for up to 5000 square feet of data center space Evaluating locations such as HSC, ShelbyHurst, UofL Research Park, and others Meeting with JRA Architects and Staggs and Fisher Engineers Investigating options for pre-fab data center

Questions?