Technical Report On Mini Turnplates By Will Klentzman & Tony Parris.

Slides:



Advertisements
Similar presentations
MO-735 Overlock Dealer Training CLICK.
Advertisements

1 P720 PRINTER CLEANING PROCEDURES. 2 Printer Cleaning Instructions u For the P720 to Operate Properly It Is Important to Keep the Printer Clean and Free.
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
Changing the Oil in a 2006 Mitsubishi Eclipse. Introduction Changing the oil in your 2006 Mitsubishi Eclipse is easier than you may think. With a few.
Optical Manufacturing Solutions 1 Probe Assembly.
Peppermill Demo Bayou Woodturners Demonstrator Jim Shackelford November 2009.
Cutting Coulter Drive Wheel Lime Hopper Ripping Tyne & Fertilizer Application Tube Seed Hopper Fertilizer Hopper Draw Bar Seed Tube The Werner Zero Tillage.
Flange-lok Installation Instructions Quick Installation Guide rev. DB.
MyLock 644D Service Seminar.
How to Tram a Mill Head ME 410 Kaizen Project Summer 2005.
Blackwood Fire Company Stihl Chainsaw Maintenance.
Memory Craft Feed Dog Drop Step Motor Adjustments.
Cold-Plus™ Refrigerant Enhancer
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Launching the Laser into an Optical Fibre n To launch a laser into an optical fibre, proceed as follows.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
Canola Harvesting BY Derek Thoms. What can be used to harvest canola This is a grain head which is used to harvest small grain products like canola. This.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Joint fit up and alignment
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Installation. Indoor Unit Installation Typical Installation.
Sandvik Construction Module 6 How to sell Sandvik cone crushers
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Pedestal Grinder Objectives 1)Identify the major parts of a pedestal grinder with 80% accuracy. 2)Identify appropriate use of a pedestal grinder and its.
Installation. Indoor Unit Installation Typical Installation.
Introduction to a pit installation
Steady Rests, Follower Rests, and Mandrels
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Ken Periman Problem solving, Sub frame bolt issue
The BaBar Upgrade Load transfer of the Barrel and Endcap Calorimeters Richard F Boyce 21 October 2003.
A-Frame Operation The A-Frame will provide support for odd shaped loads, loads where you are unable to get directly below the load, and for stabilizing.
Vicon subsoiler - Terra PL Product Information 2013.
Nathanael O’Hara. IDEAS I Researched Games Tables I liked these designs in part I decided to mesh the designs into something I liked and also could work.
Off the TruckIntroduction Removing Pigs from the Stall Into the Pens Weaning Pigs Moving Safely Down the Hall Safe Pig Handling: Weaning Pigs National.
Job Performance Requirement 7-3 Donning SCBA  Seat- Mounted Apparatus.
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
Sugar Manufacturing Process:
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
PILLOWCASE EMBROIDERY MACHINE. FOLD PILLOWCASE IN HALF & PIN Put a pin through the top layer only F old in half to find center of band/cuff.
UNIT-II TURNING MACHINES
STEP 1: ASSEMBLE ANGLE PLATES
Ambition was to reduce setup time to a very low level
BASIC GAS METAL ARC WELDING
Automotive Heating And Air Conditioning
The Indexing or Dividing Head
FIGURE 5.1 Hydraulic brake lines transfer the brake effort to each brake assembly attached to all four wheels.
UNIT-II TURNING MACHINES
Phases of partial denture treatment
Developmental change and stability of personality
Integrated Front Bullbar Lifting Points
STEP 1: ASSEMBLE ANGLE PLATES
Vitamin C Titration Group Presentation
Ken Periman Problem solving, Sub frame bolt issue
T400 Motor Replacement.
USE OF MILL TESTS FOR MILLING OPTIMIZATION
Restoring a Gunky Perkins Brailler To Health
Attaching the Micromanipulator to the Laser
Chapter 13: Systems Analysis and Design
Microscopes Always use 2 hands to carry; one on the arm and one on the base Plug in; turn light on.
A PATH BREAKING TECHNOLOGY
Cryomodule Assembly Plan
Water Powered Mills History Project January 11, 2009.
Observation on Trials at TAFE Doddaballapur
F Aero Diffusion Technical Specifications ArtyScent®
Four seasons T T P 2012.
Developmental change and stability of personality
PERKINS BRAILLER.
Replace Timing Belt 300 Hours.
Presentation transcript:

Technical Report On Mini Turnplates By Will Klentzman & Tony Parris

History Iberia Sugar installed Mini Turnplates in the late ‘80’s when four roller mills and Donnelly Chutes were installed. The configuration of the mini turnbeam and turnplate caused the feed roller to be placed much higher than the top roller. This caused concern about proper drainage, due to the fact that the juice must flow over the feed roller to drain.

A decision was made to remove the mini turnplate and turnbeams in the early 90’s. The rollers were dropped so that the feed roller and front roller were in mesh.

After many years of mediocre extraction and the implementation of more aggressive welding on the feed roller which caused the roller to fuzz up. It was suggested that the mini turn plate be looked at again. In 2003 the old turn beams were looked at, but the idea of lifting the feed roller was discouraging. It was decided to change this idea and use a scraper plate instead of the old turnplate and turnbeam.

The New Arrangement The new arrangement used a 3” x 3” square bar to support a 1 1/4” scraper plate. The plate was grooved and had a slight angle so that it followed the contour of the top roller. Two arms were attached to tighten the scraper and an eccentric bearing arrangement was made to allow for some adjustment.

This was done only on the last mill. The main observations were that the feed roller remained clean throughout the grinding. The drainage was through the feed and front roller. And the cush-cush was substantially less. Even more impressive was that the bagasse moisture went from 56% to 53% and the extraction increased. Imbibition could be increased until the prior mill began to choke.

2004 Season In 2004 all of the mills were fitted with a mini scraper. The results were better because the imbibition was increased. With the increased imbibition our only limitations were the evaporators. This allowed for the better than average extraction, pol and bagasse moisture at Iberia last year.