SECCHI Status Russell A. Howard & The SECCHI Team 22-26 March 2010 STEREO SWG – Trinity College, Dublin.

Slides:



Advertisements
Similar presentations
Instrument Checkout / Performance Verification for XRT & Control of XRT Observation R. Kano for the XRT Team.
Advertisements

SECCHI Flight Software Dennis Wang SECCHI Consortium Meeting July RAL CPU Utilization Memory Usage VxWorks H/W.
SECCI/COR2 Status Report SECCHI CONSORTIUM MEETING D. Socker, S. Plunkett, A. Vourlidas.
CStCyr—SECCHI Paris-Mar #1 STEREO SECCHI COR1 Status O. C. St. Cyr for J.M. Davila and COR1 science team Heliophysics Science Division – Code 670.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
STEREO Space Weather Beacon: December 2003 D.A. Biesecker NOAA/SEC.
SECCHI_CDR_HW_Overview.1 Discussion of Synoptic Program and Use of SSR2 SECCHI Consortium SECCHI Consortium meeting 7 March 2007 Univ. Paris XI.
IMPACT Report SSMO Receiving Review– January 23, 2007.
Flight Software Image Compression and Status Dennis Wang Interferometrics/NRL SECCHI Flight Software Lead Paris Mar 5-9, 2007.
Wrap Up Russ Howard 8 March Wrap-Up Meeting Summary Data Policy Press Releases 3D Press Conference Book Offer Senior Review Next Consortium Meeting.
SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation SECCHI Synoptic and Special Observing Programs Simon Plunkett SECCHI Operations Lead.
2007 March 61 The SECCHI Campaign Jean-Pierre Wuelser SECCHI Consortium Meeting Orsay.
5 th SECCHI Tam Meeting.1 COR2 Status Angelos Vourlidas.
CStCyr—SECCHI Paris-Mar #1 STEREO SECCHI COR1 Science O. C. St. Cyr Heliophysics Science Division – Code 670 NASA-Goddard Space Flight Center
CIRSGSFC 1 COMPOSITE INFRARED SPECTROMETER Marcia SeguraPaul Romani Shane AlbrightVirgil Kunde Ray Ferrer CIRS FLIGHT SOFTWARE.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Science Center SWG – May 2005 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Science Center William Thompson NASA Goddard SFC Code Greenbelt, MD
Chandra X-Ray Observatory CXC ACIS Ops team December 2, ACIS Ops Future Response to BEP Watchdog Reboots ACIS Ops Team.
STEREO Science Working Group Meeting No October Meredith, New Hampshire.
7/12/20011 Observing Sequences in View of the SECCHI Science Goals From the EUVI Perspective J-P. Wülser.
: Chapter 12: Image Compression 1 Montri Karnjanadecha ac.th/~montri Image Processing.
STEREO Space Weather Group update Dave Webb ISR, Boston College and Air Force Research Laboratory STEREO SWG October 2009 Meredith, NH.
“Joint planning” session Preliminary instrument operation & science plans of SOT/XRT/EIS for several months after the launch. Instrument checkout and Performance.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG 3-5 February 2009 Pasadena, California.
08__050610_SCIP/SEB_PSR_Delivery.1 SECCHI Data Processing, Analysis and Access Jeff Newmark Naval Research Laboratory
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
1 “STEREO PLASTIC STATUS REPORT” A.B. Galvin Lorna Ellis (Data) Mark Popecki (Operations) Team (Science) STEREO SWG Meredith NH October 27, 2009.
SECCHI Status Report 2014 Angelos Vourlidas SECCHI Project Scientist.
Heliospheric Imager – Scientific Operations  HI Operations Document – R. Harrison  HI Image Simulation – C. Davis & R. Harrison  HI Operations Scenarios.
SECCHI Status Russell A. Howard 27 MAR 2007 STEREO SWG.
195 Å image – behind 195 Å image – Sun- Earth line – SOHO/ EIT image 195 Å image – Sun- Earth line – SOHO/ EIT image 195 Å image – ahead SECCHI Extreme.
Heliospheric Imager – Scientific Operations  HI Operations Document – R. Harrison (presented by Dave Neudegg – SciOps for Cluster, Mars Express, Double.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
2007 March 261 SECCHI-EUVI Status and First Observations Jean-Pierre Wuelser Lockheed Martin Solar and Astrophysics Lab And The SECCHI Team.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
2007 March 51 EUVI Early Observations Jean-Pierre Wuelser James Lemen Markus Aschwanden Nariaki Nitta.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
SECCHI Status Russell A. Howard & The SECCHI Team 3 Feb 2009 STEREO SWG - Pasadena.
William Thompson L-3 Communications NASA Goddard Space Flight Center STERE The STEREO Science Center.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
STEREO - Solar Terrestrial Relations Observatory Mission SECCHI Calibration Activities Simon Plunkett SECCHI Operations Scientist Naval Research Laboratory.
ISUAL Data Formats & Science Data Processing S. Geller.
Telemetry Constraints during Early Operations The STEREO telemetry rate is restricted during the phasing orbits due to S/C RF interference with each other,
Michael L. Kaiser STEREO Project Scientist NASA/Goddard Space Flight Center STEREO May 2, 2008 STEREO at 1.25 years.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California.
SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
SWG040322SECCHI_STATUS.1 SECCHI Status R.A. Howard Presentation to STEREO SWG 22 March 2004 Boulder, Colorado.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG October 2009 Meredith, NH.
5 th SECCHI Consortium Meeting Orsay, France March 5-8, 2007 SECCHI Planning and Scheduling Ed Esfandiari NRL/Interferometrics, Inc.
IMPACT Conjunction and Sidelobe Operations Janet Luhmann, Dave Curtis, Peter Schroeder, Dick Mewaldt and the IMPACT Team July 2, 2014.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
Space Weather William Thompson NASA Goddard Space Flight Center For Dave Webb Boston College & Air Force Research Laboratory STEREO SWG 3-5 February 2009.
STEREO SWG COR1 CURRENT STATUS AND FUTURE PLANS Joseph Davila 1, O. C. St. Cyr 1 William Thompson 2 1 NASA Goddard Space Flight Center, 2 Adnet Systems,
Three-Dimensional Structure of Coronal Mass Ejections From LASCO Polarization Measurements K. P. Dere, D. Wang and R. Howard ApJL, 620; L119-L
STEREO Science Center SWG – November 2005 William Thompson NASA Goddard SFC Code Greenbelt, MD
06/28/10UVIS TEAM MEETING OPERATIONS UPDATE UVIS TEAM MEETING OPERATIONS UPDATE 1.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
SECCHI Status Russell A. Howard 13 Nov 2007 STEREO SWG.
STEREO IMPACT HET/SIT Software Requirements and Design Review, 22 August 2002 DVR Flight Software Design STEREO/HET Data Formatting/PH Sampling Donald.
COR1 Status William Thompson SECCHI Team Meeting, Dublin, Ireland, March 2010.
Summary of the science planned per mission phase
COR1 Current Status and Future Plans
Launch and On-orbit Checkout
STEREO Michael L. Kaiser STEREO Project Scientist
The STEREO Space Weather Broadcast
MDP / DHU - DR Usage vs downlinks -
Space Weather and HI Richard A. Harrison, RAL
Presentation transcript:

SECCHI Status Russell A. Howard & The SECCHI Team March 2010 STEREO SWG – Trinity College, Dublin

Instrument Status Mechanisms –A mechanism calibration is done every few months to check timing in performing standard operations. –All mechanisms are nominal. CCDs –Calibrations are done periodically (every few months). –No deviations from nominal performance SECCHI Electronics Box –Watchdog Resets: “Random” resets of the 750 CPU of unknown origin. –To date we have had 15 on A and 13 on B. Flight SW –Current revision is on both A and B, loaded /4. –We continue to adjust the threshold tables for the on-board CME event detect to avoid false alarms. The very deep minimum had not only few CMEs, but also fainter than normal CMEs. –Started using “Active Sun” exposure tables

Instrument Status EUVI Filters –The number of small pinholes in the front filters continue to increase, but the effect is minimized by secondary filter COR-1A Anomaly –There was an increase in the COR-1A stray light in the southeast, that disappears in pB. The cause is unknown, but is probably a dust particle on the objective lens Summary: –All 10 telescopes continue to work extremely well.

Watchdog Resets A total of 15 resets on SECCHI-A (most recent on November 15, 2009), and 13 resets on SECCHI-B (most recent on February 20, 2010). An unrelated ‘warm reset’ (ops mode to ops mode) occurred on SECCHI-B on January 5, Occurred during ICER compression of a COR1 image, but cause is unknown.

Operations Observations are going very smoothly. We are scheduling about 7500 images/day. Images are generally on the web site within 3 days. The redistribution of telemetry to the HI-2 beacon images have made them much more useful The CME detection algorithm continues to be tweaked to eliminate false detections. The latest threshold tables will be uploaded this week. The purpose of the on-board algorithm is to inhibit any further writes to the recirculating SSR2 memory on a detection. Calibration refinements on all telescopes continue. The distribution of telemetry between the SECCHI telescopes will carry us through the next year.

Current SSR1 Synoptic Program (‘30-hour’ blocks) Telescope# Images and Size (pixels) Exposure (seconds) Cadence (minutes) Total Images/DayCompression Scheme Total MB/Day EUVI1 2k x 2k (171) 1 2k x 2k (195) 1 2k x 2k (284) 1 2k x 2k (304) ICER4 ICER5 ICER4 ICER6 ICER5 ICER4 COR x 512 (pB) ICER7 COR23 2k x 2k (pB) 1 2k x 2k (B) ICER3 HI11 1k x 1k Rice HI21 1k x 1k Rice Total EUVI SSR2 observations are interleaved with SSR1 observations to increase the image cadence in all wavelengths by at least a factor of 2 from that obtained with SSR1 alone.

SECCHI Publications 2009 –31 Journal Papers –30 Talks

ON-GOING SCIENCE TOPICS Modeling and stereographic interpretation of CMEs and other structures Imaging and Interpretation of CIRs Outflows Comet observations and analyses Initiation of CMEs F-corona Binary Star Photometry Relation to Other Observations (in-situ, Radio, SMEI, etc Calibrations Automatic determination and characterization of CMEs More ??

SECCHI Image Statistics Status as of February 28, 2010 Cor1ACor1BCor2ACor2BEuviAEuviBHi1AHi1BHi2AHi2B N Images (not incl. SPWX) Size (Raw GB) Size (FITS GB) Total Images: 4,494,620 FITS volume: 25.2 TB Telemetry volume: 1381 GB For specific information about SECCHI telemetry statistics, use IDL> sccgetinfo in SolarSoft

SECCHI SSR1 Telemetry Volume

SECCHI SSR2 Telemetry Volume

SECCHI-A Beacon Telemetry Volume

Data Volume During Extended Mission Date AheadDate BehindTelemetry Rate (kbps) Pass Duration (hours) SECCHI Data Volume (MB/Day) * Jan Oct 2008Sep Aug 2009Sep Apr 2010Dec Sep Apr 2011Nov Sep Aug ** * From STEREO Science Operations Plan (SOP), Version 2 (November 2009). ** Estimate based on past experience.

Future Science Objectives Origin of SEPs CME initiation CME propagation Campaign observations –Opportunities for future SECCHI campaigns? Cross-calibration of CORs when spacecraft are separated by 180  (Super Bowl Sunday 2011) –Other unique calibration opportunities? SSR1 observations continue to provide the background synoptic program, with reduced image cadence and/or spatial resolution compared to nominal mission. Increased reliance on SSR2 (event buffer) observations to meet science objectives.

Options for Reduced Telemetry in Extended Mission (1 of 3) EUVI: –Increase compression for majority of images in highest-cadence wavelength; –Reduce image cadence to 10 minutes in highest-cadence wavelength; –Reduce image cadence to 2 hours in other wavelengths (  2.7 combined telemetry reduction). COR1: –Bin images to 512  512 pixels, and increase compression (  3 telemetry reduction); –Sum images onboard and send down a single 512  512 total B image, instead of three polarized images (  3 telemetry reduction); –Reduce image cadence. COR2: –Bin images to 1024  1024 pixels, and increase compression (  3 telemetry reduction); –Change all polarization sequences to total B images (currently interleave pB and B) (  2.25 telemetry reduction); –Reduce image cadence. HI: –Reduce cadence of high resolution calibration images from once per day to once per week; –Change HI-1 image cadence from 40 minutes to 60 minutes; –Use subfield masks to send down only a portion of each image; –Change HI-2 image cadence from 2 hours to 3 hours; –Bin images to 512  512 pixels (impact on star removal?). Green: implemented Orange: partially implemented

Options for Reduced Telemetry in Extended Mission (2 of 3) Reduce real-time telemetry rate (used for housekeeping) to increase playback volume. –Real-time telemetry is also recorded on SSR, so it counts twice; –Average daily telemetry rate is reduced by ~17% of any reduction in real-time rate; –Reduce real-time rate from 3.6 kbps to 2.2 kbps with no impact on real-time data (additional 1.4 kbps is not used routinely); –Further reduction to 1.2 kbps could be achieved by reducing sampling rate of selected ApIDs; –Emergency mode with 16 kbps real time rate for anomaly resolution. Stop writing space weather data to SSR, and send only in real-time during contacts. –Pipeline processing of Level-0 telemetry means that these data are not available in time to be useful for forecasting; –Science data are available at the same time as space weather data from SSR; –Saves ~10% of daily 96 kbps rate.

Options for Reduced Telemetry in Extended Mission (3 of 3) Change sizes of SSR1 and SSR2 partitions to reduce emphasis on synoptic observations in favor of better coverage of selected events. Request that APL generate two new playback DFD tables: one to downlink only SSR1 and the other to emphasize downlink of SSR2 at the expense of SSR1. –SSR1-only would be the default DFD. SSR2 data would only be downlinked when a suitable event is detected, or during scheduled campaign periods. –When an event is detected and SSR2 is frozen, SWx images will be examined as soon as possible to determine if it is worthwhile to downlink SSR2 data. –If the answer to the above is yes, SECCHI POC will request MOC to change DFD to downlink SSR2 data at the next available opportunity. SECCHI POC will also upload schedules to manage decreased SSR1 data volume while SSR2 is downlinked. –If the answer to the above is no, SECCHI POC will send a command to re-enable writing to SSR2 at the next available opportunity (probably during the pass on the next day). –MOC will reset DFD to default SSR1-only when SSR2 has been completely emptied. –Other options (from 3/23/09 telecon with SSC and APL) are to use extra bits in the status message to trigger an autonomy rule to change DFD, or to switch DFD to play back SSR2 when SSR1 is empty.

Straw Man SSR1 Synoptic Program for Reduced Telemetry in Extended Mission Telescope# Images and Size (pixels) Exposure (seconds) Cadence (minutes) Total Images/DayCompression Scheme Total MB/Day EUVI1 2k x 2k (171) 1 2k x 2k (195) 1 2k x 2k (284) 1 2k x 2k (304) ICER5 ICER6 ICER5 ICER6 ICER5 COR x 512 (pB) x 512 (B) ICER7 COR23 2k x 2k (pB) 1 2k x 2k (B) ICER3 HI11 1k x 1k Rice HI21 1k x 1k Rice Total Increased EUVI compression at most wavelengths, and reduced cadence of 304 images. Interleaved COR1 pB and B images. Reduced COR2 pB image cadence to 6 hours. Meets SOP allocation at 240 kbps and 160 kbps, but does not meet allocation at 120 kbps.