Www.btwholesale.com. CPS LOCAL EXCHANGE CALLS BT WHOLESALE UPDATE 2 SEPTEMBER 2004 TIM HOWSON PRODUCT DEVELOPMENT MANAGER The information in this presentation.

Slides:



Advertisements
Similar presentations
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
Advertisements

Wholesale Line Rental Consumer Issues Task Group 5 August 2002.
1 EBC Evolution Refresher 27 th May 2005 BT Wholesale 1, City Place, Gatwick.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
HOW CREDIT CARDS WORK What you need to know about credit cards- including what credit cards companies can and can’t do, and what information they have.
Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
STANDARD CONTRACT FORUM MONDAY 13 TH DECEMBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
This update is a BT perspective of Working Group status including input from the Co-Chair call of 7 th September Nigel Scott 13 th Sept 05 Consult21 -
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE INDEPENDENT.
I&P: Contracts Clinic 24/02/06 1 Minutes Table Derivation & Application of Overflow The focus of the presentation is on principles: How it works how we.
Standard Contract Forum 04 December Customer Suite, BT Centre, London.
Honors Level Course Implementation Webinar Honors Rubric and Portfolio Review Process October 7, 2013.
Standard Contract Forum 31 January Customer Suite, BT Centre, London.
Operation of vDLE concept Revised C&W proposal. Background C&W continue to believe that in the “virtualised” situation CPs should pay connection & rental.
Issue 3.2 (1 st June 2012)Author: Zack Thompson1 NCC Carrier Price List (CPL) Guidance Slides CONVEYANCE TELEPHONY These slides are provided as a ‘rough.
STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
Narrowband & IP Strategy Steve Wickenden & Dave Hughes 12 November 1999.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
PPC Industry Forum, 7 June Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Standard Contract Forum 22 July Customer Suite, BT Centre, London.
Interconnect Policy & Contract
Interconnect Product Forum 21 st October STANDARD CONTRACT FORUM SESSION 21 October 2009 Keith Mitchinson.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
Northern Lincolnshire Healthy Lives Healthy Futures Programme NEL CCG Partnership Board Update September 2014.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Standard Contract Forum 2 September 2004 Charles Walker 2 September 04.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Legal and Business Services Legal and Business Services Standard Contract Forum 29th January 2004 John Ewbank.
Business unit (if required) business unit (if required) SDH Serving Nodes Determination at the Point of Handover.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
Consult 21 Update - Agenda Consult21 Steering Board Remit Membership Detail Recent and Future Meetings Programme Plans Nigel.
IFRS 5 Non-current assets held for sale and discontinued operations
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
1 EBC Conference Introduction and Welcome.
PPC Industry Meeting 24 th February Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
Standard Contract Forum 24 May am Customer Suite, BT Centre, London.
12 September Billing Meeting Summary. Objectives Review of EBC concepts Establish how EBC will be calculated for the following BT terminating BT Originating.
European Developments Transmission Workgroup 3 rd May 2012.
South East Wales Regional Partnership Board Welfare Reform Update Nick Jones, Service Director (Operational Finance), RCTCBC 3 rd April 2014.
Power of Choice (PoC) Program Overview
Market Trials Update NATF March 2,
Guidance on the new Pathway IT System for Candidates
Basic View Main Menus Sub Menus 9-Aug-01 8-Aug-01 7-Aug-01 6-Aug-01
Event Name Here 12/02/2007 Government Gateway Transition and Transformation Brief for Software Developers Jan 2017 Project Name: HMRC v1.8.
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Cornerstone Phase 4 Update for Stakeholders October 19, 2011
Guidance on the new Pathway IT System for Mentors
Updates to the Pathway to Chartership Online System
Guidance on the new Pathway IT System for Mentors
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Updates to the Pathway to Chartership Online System
Arkansas Works Overview
SOCIAL DIALOGUE TIMELINE
Wireless Local Number Portability Timeline - Phase 2
Guidance on the new Pathway IT System for Mentors
Exit Capacity Substitution and Revision
EU/GB Charging Project – Delivery Timescales
Report to 176th WP.29 session from the 34th IWG on DETA meeting
Cornerstone Phase 4 Update for Stakeholders October 19, 2011
Revised Tender Timescale for DN Interruption Arrangements
Gas Customer Forum DN Interruption Update - Introduction
XRN Nov 19 Release - Status Update
CATECHISM CALENDAR 2017 TERM 1 – 21 JAN – 11 MAR
XRN Nov 19 Release - Status Update
STAP Sample Environment Engineering
Wireless Local Number Portability Timeline - Phase 2
Presentation transcript:

CPS LOCAL EXCHANGE CALLS BT WHOLESALE UPDATE 2 SEPTEMBER 2004 TIM HOWSON PRODUCT DEVELOPMENT MANAGER The information in this presentation does not form part of a contract

AGENDA BACKGROUND PROJECT TIMELINE FULL SOLUTION INTERIM SOLUTION

BACKGROUND CPS design recognised from inception as inefficient for same exchange calls (tromboning). Ofcom Statement published 30 th July 2004: BT now asked to keep these calls “on-net” and bill CPSO accordingly. Dependent on CPSO build-out to DLE New Product Variant – “CPS Local Exchange Calls” New Industry Working Group established – Same/Adjacent DLE IWG

BACKGROUND Call routing used by BT Retail Call routing used by fully interconnected CPSO BT DLE CPSO Switc h Own local exchange calls BT DLE CPSO Switc h BT DLE Adjacent connected local exchange calls

PROJECT TIMELINE 2005 Contract & DMA Dates tbc AXE 10 Activation 18 Mar – 31 Mar* System X Main Activation 1 Apr – 30 April* System X Residual Activation 2 May – 31 Oct* EBC Cycle 1 Apr EBC Cycle 1 Jul EBC Cycle 1 Oct EBC Cycle 1 Jan 100% 25% 50% 75% 0% 35% lines 92% lines 100% lines * These are planned dates

FULL SOLUTION Two Main phases plus one “Mop-Up” Phase BT will be discussing new contract with SAD IWG late October CPSO’s will need to “opt-in” to full solution on per DLE, per CPS Code basis. Revised DMA process and timescales to be offered for this “on-boarding” CDRs to be made available for fraud prevention and billing purposes, c.f. Wholesale Calls & Wholesale Access

INTERIM SOLUTION BT has identified those CPS calls over DLE interconnects that would qualify for the new product variant. BT will be issuing credit notes against same/adjacent connected DLE calls meeting above criteria – against the cost disadvantage as seen by Ofcom. Credit notes will be issued monthly from September, backdated to 1 July Interim Solution will continue until CPSO takes full solution on particular DLE under roll-out plan. BT has published an amendment to the Carrier Price List and issued a briefing to explain this in more detail.