SC - 08Jul'11LHCCryo - TechStop July 2011 LHC Tech Stop July 2011 LuMaMeJeVe 12 23 34 45 56 67 78 81 Empty QRL_C 1.8K Ref. CP7 Deg Pump ? Deg Pump Refill.

Slides:



Advertisements
Similar presentations
Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Advertisements

Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
4th July Two physics fill during the day Smooth data taking LHC plans changed: 90m run postponed to tomorrow (24h) OT FE still excluded, to be looked at.
HCS Series Screw Compressor Packages. 2 HCS Series.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Marine Engine Systems Merchant Marine Training Centre.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
SC - 04Feb'13Cryo Heaters Review Cryogenic Heaters Review Operation use and wishes S. Claudet - A. Suraci LHC Cryogenic Operation.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CRYOGENICS AND POWERING
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)
HC review - 12 May 2005Luigi SERIO - AT/ACR/OP1 SECTOR COOL DOWN AND CRYOGENIC COMMISSIONING L. Serio.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
How can we reduce the “no beam„ time? Walter Venturini Delsolaro D. Arnoult, S. Claudet, G. Cumer, K. Dahlerup Petersen, R. Denz, F. Duval, V. Montabonnet,
Introduction to LHC cryogenic system (layout, architecture) Preparation before cool-down (Purge, flushing) Transient operations to reach nominal operating.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
TECHNICAL TRAINING INVERTER-Y
IBL cooling thermal chock incident 15 October The IBL cooling team.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
FUEL TANKS, LINES, FILTERS, and PUMPS CBCAUTOMOTIVERKCBCAUTOMOTIVERK.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
LHC Cryogenics HWC day 19 March 2009 Serge Claudet TE-CRG-OA (LHC Cryo OP)
NA62 RICH Gas System V2.0 S. Haider PH/DT/DI LHC-Gas-Project.
LHC Cryogenics for sector 45 and Perspectives S. Claudet, for LHC cryogenics HWC Review, 28 Fev’08.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
TE-CRG Activities D. Delikaris, TE-CRG.
1.8 K cycle and specificities CC: - 3D wheels - Bearings (300K) HX: - Very Low Pressure “Mixed” Compression P ratio ≈ 80 HX Stainless Steel Plate Axial-centrifugal.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Engine Brake VEB + VEB + is the name of the Volvo engine braking system and is a further development of the VEB engine brake. Engine brake VEB + consists.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
FLUID POWER CONTROL ME604C. FLUID POWER MODULE:02 ~ HYDRAULIC SYSTEM COMPONENTS.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
First Law of Thermodynamics applied to Flow processes
Cryogenics storage and distribution
CONSOLIDATION day in view of HL-LHC Cryogenic aspects
Sequence Valves.
Minimum Hardware Commissioning – Disclaimer
CRYOGENICS – strategy, unavailability root causes and limitations
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Preparation of the activities for the LHC Long Shutdown 2
Keeping LHC cold during LS periods Preliminary proposal
Hollow e- lens, Cryogenic aspects
Activities of the ME section during LS2 ( )
Cooling systems for HL-LHC (WP17.3)
EN-CV interventions during EYETS for PS and PSB
K. Foraz on behalf of OSS members
Cryo stop of P8 on 1st of November
How does a cryogenic system cope with e-cloud induced heat load
Summary of week 25 R. Assmann, J. Wenninger with the support of many !
Cryogenic cavern in Asian site
Power cut 18kV cable for EMD404/E9 is heating
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
P8 cryogenic PLC problems on
Guidelines defined early Dec 2012
Summary post TCC#54_02Aug’18
Cryogenic management of the LHC Run 2 dynamic heat loads
HL-LHC New MS optimisation WP9, Preliminary cost estimates
Presentation transcript:

SC - 08Jul'11LHCCryo - TechStop July 2011 LHC Tech Stop July 2011 LuMaMeJeVe Empty QRL_C 1.8K Ref. CP7 Deg Pump ? Deg Pump Refill QRL 15mbar ? Test ? repump <50mbar Powering Quench RF Deg Pump 70mbar15mbar 1.8K70mbar15mbar SAM DFB SAM DFB SAM DFB SAM DFB Action plan for major stops (+multi instrum & other works)

SC - 08Jul'11LHCCryo - TechStop July 2011 And reality … Major finding: the screw compressor (P8, oil filters clogging mid June) was found damaged, with bearings showing exceptional stress Similar case than P4_Xmas: - Series problem ? - Too much axial force ? Confirmed by observations on oil circuit => Decision to treat similar compressors a.s.a.p Inlet (4bar) Outlet (20bar) Specific oil injection (22bar) to balance axial forces, Need to send more oil than pass through to screws ! About 35’000 hrs, bearings calculated for 70’000 hrs

SC - 08Jul'11LHCCryo - TechStop July 2011 Compressor station of LHC K Bldg: 15 x 45 X 9 Pinput : 4.5 MW Cool: 500 m3/h Noise: 105 dBA Pipe & fittings redone with larger diameters P8(1) done this Tech Stop, 2nd to factory, P4(1) & P18(2) done in shadow of P8 recovery, P6 to be done latest at Next Tech Stop

SC - 08Jul'11LHCCryo - TechStop July 2011 QUI Leaky HX (Jan’11) TuA (Spring11) P8 configuration, week-end CCs 6CV215 valve (P2) Tests for relocation Validated for P2 (TS) ! Sector 78 Sector 81 Extra flow Until compressor repaired! Some minimum flexibility recovered during Tech Stop Limitations

SC - 08Jul'11LHCCryo - TechStop July 2011 LHC Tech Stop July 2011 LuMaMeJeVe Empty QRL_C 1.8K Ref. CP7 Deg Pump ? Deg Pump Refill QRL 15mbar ? Test ? repump <50mbar Powering Quench RF Deg Pump 70mbar15mbar 1.8K70mbar15mbar DFB SAM DFB SAM DFB SAM DFB Tentative d’illustration des activités Cryo LHC 1.8K UPS 70 mbar15mbar Rev2: P5_UPS effect + refinement 12/34 Rev3: QRL_12 test stopped earlier + P4/P18 QSCB oil pipes SAM New 70 mbar Re-pump CP 15 mbar

SC - 08Jul'11LHCCryo - TechStop July 2011 Status & Forecasts Overall situation under control, checking singularities here and there P8: Should be back Friday evening (22h t.b.c) Special: ALL triplets + D4Q5_R4 emptied, warmed-up 25K, pumped VAC