AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.

Slides:



Advertisements
Similar presentations
Executive Session Director’s CD-1 Follow-Up Review of the APUL Project November 2-3, 2009 Dean A. Hoffer.
Advertisements

Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
AGS RSVP Weekly Meeting P. Pile 27 Jan 2005 AGS RSVP Weekly Meeting 27 Jan 2005 Useful Links: RSVP Project : C-AD.
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
Electronic Engineering Department Final Year Projects September 2008.
QAA Summative Review Staff Briefing Leeds College of Art 8 September 2010.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
AGS RSVP Weekly Meeting P. Pile 18 November 2004 AGS RSVP Weekly Meeting, 18 Nov 2004 Useful Links: RSVP Project : C-AD AGS Project:
Management subcommittee closeout Jay Marx (chair, LBNL), Joel Butler (Fermilab), Stan Wojcicki (Stanford) Thanks to all for cooperation and openness!!
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
July 9, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
AGS RSVP Weekly Meeting P. Pile 14 Apr 2005 AGS RSVP Weekly Meeting 14 Apr 2005 Useful Links: RSVP Project : C-AD.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Mu2e Cost and Schedule Ron Ray Mu2e Project manager Fermilab PAC Meeting November 3-4, 2008.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
Doc.: IEEE /169r0 Submission December 1999 Ian Gifford, M/A-COM & Tom Siep, TISlide 1 IEEE P Working Group for Wireless Personal Area Networks.
TOF Project Construction Project Plan
1 Commonwealth Project Management Division Bob Haugh Project Management Division November 15, 2010 Revision of.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
AGS RSVP Weekly Meeting P. Pile 17 Mar 2005 AGS RSVP Weekly Meeting 17 Mar 2005 Useful Links: RSVP Project : C-AD.
1 RSVP Project Director’s Review with Laboratory Oversight Group Attendance Jan 2005 WBS 1.4.5, AGS Project Office (and WBS Beam Development)
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
PROMCODE Technical Committee Convener Call 14 February
BNL/AGS RSVP Upgrades Project WBS 1.4 – Breakout Session Rare Symmetry Violating Processes Preliminary Baseline Review Brookhaven National Laboratory 6-8.
AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.
TOF Preliminary Design and Safety Review Project Management Controls R. L. Brown.
Texas Nodal Market Implementation Metric Sub Group Readiness Advisor January 30, 2006.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan.
Bluetooth™-IEEE Working Group and IEEE P Working Group for WPANs Liaison Meeting Ian Gifford P Vice Chairman December 8, 1999.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
AGS RSVP Weekly Meeting P. Pile 30 December 2004 AGS RSVP Weekly Meeting 30 Dec 2004 Useful Links: RSVP Project :
1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004.
1 RSVP Cost and Schedule Review 9 December 2004 AGS Upgrades Philip Pile WBS 1.4 Project Manager.
AGS RSVP Weekly Meeting P. Pile 24 Mar 2005 AGS RSVP Weekly Meeting 24 Mar 2005 Useful Links: RSVP Project : C-AD.
AGS RSVP Weekly Meeting P. Pile 16 December 2004 AGS RSVP Weekly Meeting 16 Dec 2004 Useful Links: RSVP Project :
Lab-Wide Earned Value Management System Project Oversight Committee Meeting December 11, 2008 Dean. Hoffer / Elaine McCluskey.
AGS RSVP Weekly Meeting P. Pile 10 Feb 2005 AGS RSVP Weekly Meeting 10 Feb 2005 Useful Links: RSVP Project : C-AD.
V. O’Dell, L0 Workshop 25-Sep Run 2b Layer 0 Workshop u Layer 0 proposal from project Management perspective s History/News s Schedule.
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
AGS RSVP Weekly Meeting P. Pile 10 Mar 2005 AGS RSVP Weekly Meeting 10 Mar 2005 Useful Links: RSVP Project : C-AD.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Project Management W. J. Foyt
Status of the Planning Working Group’s (PWG) Efforts
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Francesco Forti University and INFN, Pisa
Project Genome Mapping
Sub-1 GHz Study Group Closing Report Sept 2018
HL7/College/University Internship Program
November 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w November 2018 Closing Report]
GOMACTech-04 Technical Program Committee Timeline
<month year> doc.: IEEE ptc November 2012
IEEE IMT-Advanced Review Process
SC SC SC WS SC S HIS Background document Seminar document
IEEE IMT-Advanced Review Process
Drafting Group: Final Meeting Drafting Group: 1st Meeting
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Presentation transcript:

AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD AGS Project: Office Agenda –Review updates (pile) –ESH and QA effort and costs (lessard) –Presentation of Data Sheets and status of cost scrubbing and resource loaded schedules; in addition to what has been done, SHOW ROAD MAP TO COMPLETION! - (Pile, Brown, Pendzick, Phillips and Pearson) –Beam development plan, Case 2 – 3 years of beam development beginning in third year, 15 weeks per year concurrent with RHIC operations (Ahrens)

AGS RSVP Weekly Meeting P. Pile 6 Jan Jan 05 LOG Review The LOG Committee Members Thomas Kirk, Chair BNL Victoria Greene, Vanderbilt Univ. Edward O'Brien, BNL Ronald Ray, Fermilab Kenneth Ragan, McGill Alexander Zlobin, Fermilab

AGS RSVP Weekly Meeting P. Pile 6 Jan Jan 05 LOG Review (T. Kirk comments) The purpose of this review is to get directly to the content of the three sub- projects, KOPIO, MECO and AGS, and to find out how fully and accurately the projects have estimated costs and contingencies for the items in the project. The scope of the sub-projects is also to be examined in the context of its completeness and freedom from possible gaps and double counting in the estimate detail. We will not be hearing about the HEP rationale for the experiment, or why the particular detector approaches were chosen. This will be assumed as given for the purposes of this review. I do note, however, that observations about the technologies chosen for the experiments and their appropriateness are part of our review.

AGS RSVP Weekly Meeting P. Pile 6 Jan Jan 05 LOG Review (T. Kirk comments) In the month long-period immediately following this review, the Project Office has planned a series of lower-level reviews to 'drill down' to the lowest levels of the cost estimates with the view of validating as much of the cost and schedule baselines as can be achieved. In these lower-level reviews, the technical approaches and technologies chosen for the project elements will also be critically examined by the LOG.

AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 Charge to the RSVP Laboratory Oversight Group - DRAFT RSVP Project Director’s Review January 18-20, 2005

AGS RSVP Weekly Meeting P. Pile 6 Jan 2005

AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 Additional guidance for WBS 1.4 RSVP Project Office Account Number: USE IT!

AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 Additional guidance for WBS 1.4 Updated data sheets should be posted on our web site at \\c-adfile3\RSVP_files \\c-adfile3\RSVP_files Data Sheets are to be made available to the Project Office by 14 Jan (Friday) Dry run for WBS 1.4 will be Friday, 14 Jan, 1:30-3:00 in LCR – present your introduction and data sheets

AGS RSVP Weekly Meeting P. Pile 6 Jan 2005

AGS RSVP Weekly Meeting P. Pile 6 Jan 2005

AGS RSVP Weekly Meeting P. Pile 6 Jan 2005

AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 MilestoneDateStatus, Comments Discussion of Baseline Expectations, Timeline with Experiments September 13Held MECO Magnet ReviewSun-Tue, Oct 10-12Held AGS ReviewThu-Fri, Nov 4-5Held Internal discussion of resource-loaded schedules (RLS) for all projects Thu, Dec 9Held Simulations & Backgrounds ReviewTue-Thu, Jan 11-13Set, reviewers assembled, held at NYU Initial review of RLS for all projectsTue-Thu, Jan 18-20Reviewed by LOG Reviews of other sub-projectsWeeks of Jan 24 – Feb 21Series of LOG-based reviews of RSVP sub-systems Draft versions of PMP, PEP, Conceptual Design Report completed Mon, Feb 14 Operations ReviewWeek of Mar 7 Project startup pre-reviewWeek of Mar 15Comprehensive preparatory review of full project, proposal Project startup reviewWeek of Apr 18Final project startup review, iteration of above. NSF review. Finalize documentation for May submission to NSF Week of Apr 25 Product submitted to NSF/NSBMon, May 2 next significant events

AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 Next Meeting 14 Jan FRIDAY Agenda –Dry Run for Jan 05 LOG Review