Small Bodies Node Ludmilla Kolokolova Carol Neese, Mike A’Hearn, Anne Raugh MC Face-to-Face Meeting Westwood, California 26,27 August 2014.

Slides:



Advertisements
Similar presentations
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Advertisements

Placing Movies in the PDS Archive Engineering Node Pasadena, California Nov 30, 2006
PDS4 vs. Level 1-3 Requirements Mitch Gordon PDSMC, UCLA August 27, 2014.
CIRS Data Archiving Status Presentation to the Cassini CIRS Team Meudon, France - April 2004 Conor A Nixon (University of Maryland) Mike Flasar (NASA GSFC)
PPI Node Report Raymond J. Walker Steven P. Joy Todd A. King PDS Management Council March 25, 2010.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
PDS Radio Science Dick Simpson Stanford University Overview Activities MC Support PDS-Internal Support (PDS4) Mission Support Node and User Support Local.
PDS Radio Science Dick Simpson Stanford University Stanford Status PDS4 Status at Stanford o Testing o Mission Support o Migration Proposal o Tools o Issues.
InSight Archive Status Ed Guinness and Susie Slavney PDS Geosciences Node PDS Management Council Berkeley, California November 18-19, 2014.
2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool.
3/27/12SBN report for PDS Management Councilmfa 1 The Small Bodies Node PDS Management Council March 27-28, 2012 Mike A’Hearn, Don Davis, Ludmilla Kolokolova,
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
PDSMC November 29-30, PDS Imaging Node PDS4 Migration Lisa Gaddis (USGS) Sue LaVoie (JPL) November 30, 2012 PDS Management Council Meeting UCLA.
PDS 2010 Project Update Dan Crichton MC Face-to-Face Washington DC March 25-26, 2010.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Web Content and Supporting Tools.
Geosciences Node Ed Guinness MC Face-to-Face Meeting Washington, DC March 27-28, 2012.
Rings Node Mitch Gordon Mark Showalter MC Face-to-Face Meeting Westwood, California 26,27 August 2014.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
Rings Node Migration Plan Mark & Mitch PDSMC, UCLA November 28-29, 2012.
PDS4 Tool Development Strategy PDS Management Council Meeting November 18, 2014 Dan Crichton.
PDS4 and Build 5a Update Dan Crichton, Emily Law November
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
Atmospheres Node Report Reta Beebe Nancy Chanover Lyle Huber Lynn Neakrase Jim Murphy Irma Trejo Matias Roybal Shannon Rees.
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
Data Standards and Build 3b Plans Steve Hughes MC Face-to-Face UCLA, Los Angeles, CA November 28-29, 2012.
NAIF Node C. Acton/B. Semenov MC Face-to-Face Meeting Westwood, California 26,27 August 2014.
NSSDCA Status Dave Williams PDS Management Council Berkeley, CA 19 November 2014.
PDS M/C August 2012 PPI Node Report PDS Management Council August 28-29, 2012 R. J. Walker S. P. Joy T.A. King J. Mafi.
Validation Tool (VTool) PDS Management Council Meeting Washington, D.C. November 2006
PDS M/C November 2012 PPI Data Migration Planning PPI PDS4 Data Migration Planning PDS Management Council November 28, 2012 T. King.
Operations Report PDS Management Council Meeting Flagstaff, Arizona August 2006
Data Standards Development August 29, Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support.
PDS/NSSDC Deliveries Dave Williams PDS Management Council Columbia, MD 3 April 2013.
PPI Node R.J. Walker, T.A. King, S.P. Joy, J.N. Mafi MC Face-to-Face Meeting Westwood, California 26 August 2014.
PDS Geosciences Node Page 1 Archive Status MRO and Phoenix Ed Guinness PDS Management Council August 13, 2007 Ed Guinness.
PDS Geosciences Node Page 1 Archiving LCROSS Ground Observation Data in the Planetary Data System Edward Guinness and Susan Slavney PDS Geosciences Node.
Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman.
Development Report Engineering Node August 2006
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
First Day PDS MC FACE-TO-FACE AGENDA MEET-ME April, 2013 PASS CODE Columbia Room, Doubletreehttp://pdsmgmt.gsfc.nasa.gov/meetings/2013/mc_apr2.html.
SBN Experience with PDS4 Workshops for the Community Anne Raugh PDS MC 26 August 2014.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
PDS4 Mission Needs Assessment Reta Beebe Dan Crichton.
Software Development and Deployment PDS Management Council Face-to-Face Berkeley, California November 18-19, 2014 Sean Hardman.
Dawn Archiving Status Carol Neese Eric Palmer Small Bodies Node PDS MC Face-to-Face Feb. 4-5, 2015.
PDS4 Demonstration Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
Small Bodies Node Report Michael F. A’Hearn, Donald R. Davis, Ludmilla Kolokolova, & Carol Neese 28/8/12PDS Management Councilmfa 1.
MAVEN Archive Overview J. Mafi PDSMC Face-to-Face Berkeley, California 18 November 2014.
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
Planetary Data System (PDS) Tom Morgan November 24, 2014.
Coordinate Systems Mike A’Hearn & Don Davis. Origin of Problem Coordinate system issues for Dawn –Will NOT rehash these issues! SBN Advisory Council urged.
13 Aug '07PDS MC New Horizons: Jupiter Flyby data Ludmilla Kolokolova.
PDS M/C November 2012 PPI MAVEN Report PDS4 Mission Report: MAVEN PDS Management Council November 28, 2012 J. Mafi.
Imaging Node Lisa Gaddis/Sue LaVoie PDSMC Face-to-Face Meeting Westwood, CA - UCLA 26, 27 August 2014.
Tools Report Engineering Node March 2007
Movies Engineering Node Standards August 13, 2007.
PDS4 Deployment Planning (Discussion) PDS MC F2F Columbia, Maryland Dan Crichton August 28,
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
PDS4 Impact on Roses From response from PDS Nodes 4/2/13 PDS MC Meeting, Columbia MD, Apr 2-3, Node Small Bodies (Dust)*US Providers 1010.
NASA PLANETARY DATA SYSTEM ARCHIVING IPDA Steering Committee Reta Beebe, Dan Crichton Paris, France July
April 2, 2009PDS Management Council - PPI Node1 Planetary Plasma Interactions Node PDS Management Council Presentation April 2, 2009 Raymond Walker Steven.
SBN-UMD short report. . Identify Missions and Instruments where archive products are behind schedule; particularly, those where the identified issues.
1 MAPPS Software Review Board MAPPS SRB – part II ESAC, Madrid, Spain 3 rd June 2016 ESA-ESTEC - “MAPPS Software Review Board” – MAPPS SRB - Part II, ESAC,
Tools Report Engineering Node August 2007
RSOC Overview at SWT #26, 11/12 June 2009
Rosetta Status Mike A’Hearn.
Helping Active Missions Convert to PDS4
Simulation Project Structure and tasks
ESA and Mars Express archive activities
Presentation transcript:

Small Bodies Node Ludmilla Kolokolova Carol Neese, Mike A’Hearn, Anne Raugh MC Face-to-Face Meeting Westwood, California 26,27 August 2014

Mission/Restoration Highlights. PDS4 missions OSIRIS-Rex Status, Archive Development, etc.: SBN currently supporting product and label design and development in preparation for product design reviews. Upcoming releases: N/A Peer reviews: OCAMS, OVIRS, OTES, and OLA raw and calibrated data product design reviews planned for later in LADEE-LDEX Status, Archive Development, etc.: First hundred days of science mission have been through peer review, certified, and posted with minor liens. They are currently in liens resolution. Upcoming releases: Remaining data from extended mission planned to be reviewed and released in Nov Peer reviews: First hundred days of data were reviewed and certified with minor liens on June 30, 2014 Issues, Concerns : None 2

Mission/Restoration Highlights. PDS3 missions Dawn Status, Archive Development, etc.: - Mars and Cruise data still in liens resolution except GRaND L1a, which is archived. - Vesta L1a and L1b data all archived except GRaND L1b. - Vesta Gravity L-0 and GRaND higher level products reviewed and currently in liens resolution - FC, VIR, and Gravity Vesta higher level products not submitted yet Upcoming releases: Depends on progress of liens resolution. Gravity L-0 is looking like it may be done soon. Peer reviews: GRaND Vesta L1b delivery for peer review expected soon. Issues, Concerns : Progress is slow but continuing for some products, imperceptible for others. New Horizons Status, Archive Development, etc.: Pluto-Cruise I data were reviewed in January; SWAP data were released; other in lien-resolution; REX data from the start of the mission were reviewed on August 19. Upcoming releases : Pluto-Cruise I by the end of the year Peer reviews: Pluto-Cruise II will be reviewed in October 3

Non-mission activity Staffing issues including FTE required to support working groups and tiger Teams o Anne Raugh: varies from 15% to 95% of her time o Ed Shaya : 10 hours per month o Tony Farnham: 1 day per month Software What we use for PDS4 - Oxygen or Eclipse to edit - EN tools for validation and dictionary generation - AMES tool for O-Rex label and local dictionary design What we have developed at our node - READPDS for PDS4 (beta version) - a couple of local scripts to deal with trying to use EN tools in a production environment. What we (and the user community) need - training materials - simple visualization tool that works on all products and is easily installable on “all” platforms (like NASAVIEW) - open source editor as good as Oxygen - good user documentation for EN tools and service software - modification and packaging of EN tools to be used in a production environment at the nodes. Migration. We have migrated about 14 datasets to the current ( ) PDS4 standards (test migration, not a permanent one). Most of these require: - the geometry dictionary which is not released and still in active development, - modifications currently in the development queue for the next release, - resolution of conflicts with definitions and requirements in the current release of the imaging dictionary. 4