Dawn Archiving Status Carol Neese Eric Palmer Small Bodies Node PDS MC Face-to-Face Feb. 4-5, 2015.

Slides:



Advertisements
Similar presentations
Geologic Mapping Methods for a Mission-Driven Mapping Scenario: The Dawn at Vesta Example R. A. Yingst, S.C. Mest, D.A. Williams, W.B. Garry, D.C. Berman,
Advertisements

Placing Movies in the PDS Archive Engineering Node Pasadena, California Nov 30, 2006
CIRS Data Archiving Status Presentation to the Cassini CIRS Team Meudon, France - April 2004 Conor A Nixon (University of Maryland) Mike Flasar (NASA GSFC)
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
PPI Node Report Raymond J. Walker Steven P. Joy Todd A. King PDS Management Council March 25, 2010.
March 2010 PDS Imaging Node 1 NASA PDS Imaging Node: NASA PDS Imaging Node: Digital Data Archives and Distribution Archiving and distributing data and.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Obtaining MISR Data and Information Jeff Walter Atmospheric Science Data Center April 17, 2009.
InSight Archive Status Ed Guinness and Susie Slavney PDS Geosciences Node PDS Management Council Berkeley, California November 18-19, 2014.
2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool.
3/27/12SBN report for PDS Management Councilmfa 1 The Small Bodies Node PDS Management Council March 27-28, 2012 Mike A’Hearn, Don Davis, Ludmilla Kolokolova,
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
U.S. Department of the Interior U.S. Geological Survey Diving into the Data Pool with DAAC2Disk Kelly Lemig ERT, Inc., contractor to the U.S. Geological.
PDSMC November 29-30, PDS Imaging Node PDS4 Migration Lisa Gaddis (USGS) Sue LaVoie (JPL) November 30, 2012 PDS Management Council Meeting UCLA.
Geosciences Node Ed Guinness MC Face-to-Face Meeting Washington, DC March 27-28, 2012.
Rings Node Mitch Gordon Mark Showalter MC Face-to-Face Meeting Westwood, California 26,27 August 2014.
Welcome to the Party! Why are we here? Celebrate the beginning of Dawn's year-long exploration of new worlds! Share in the excitement as we see something.
Thomas C. Stein PDS Geosciences Node Washington University in St. Louis 1MS Supporting Active Surface Missions and Adding Value.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 1 Monthly Status Report Report due 1/25/01 Schedule statused.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PDS4 Tool Development Strategy PDS Management Council Meeting November 18, 2014 Dan Crichton.
A collaborative partnership between the State of Kansas Department of Revenue – Property Valuation Division (KDOR/PVD), the Kansas GIS Policy Board’s Data.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
Atmospheres Node Report Reta Beebe Nancy Chanover Lyle Huber Lynn Neakrase Jim Murphy Irma Trejo Matias Roybal Shannon Rees.
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
Data Standards and Build 3b Plans Steve Hughes MC Face-to-Face UCLA, Los Angeles, CA November 28-29, 2012.
This dataset contains calibrated, to 4.8-micron spectral images of comet 103/P Hartley 2 acquired by the High Resolution Infrared Spectrometer (HRII)
NSSDCA Status Dave Williams PDS Management Council Berkeley, CA 19 November 2014.
ASPERA-3 May 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 5_25/ Page 1 Monthly Status Report Report due 5/25/01 Schedule statused as.
PDS M/C August 2012 PPI Node Report PDS Management Council August 28-29, 2012 R. J. Walker S. P. Joy T.A. King J. Mafi.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
Obtaining MISR Data and Information Nancy Ritchey Atmospheric Science Data Center March 20, 2006.
PDS M/C November 2012 PPI Data Migration Planning PPI PDS4 Data Migration Planning PDS Management Council November 28, 2012 T. King.
Operations Report PDS Management Council Meeting Flagstaff, Arizona August 2006
Data Standards Development August 29, Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support.
PPI Node R.J. Walker, T.A. King, S.P. Joy, J.N. Mafi MC Face-to-Face Meeting Westwood, California 26 August 2014.
PDS Geosciences Node Page 1 Archive Status MRO and Phoenix Ed Guinness PDS Management Council August 13, 2007 Ed Guinness.
PDS Geosciences Node Page 1 Archiving LCROSS Ground Observation Data in the Planetary Data System Edward Guinness and Susan Slavney PDS Geosciences Node.
Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman.
Development Report Engineering Node August 2006
Dawn Interaction of Energy and Matter: Dawn Mission Instrumentation Framing Cameras 1.
PDS4 Mission Needs Assessment Reta Beebe Dan Crichton.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – December 2012.
Software Development and Deployment PDS Management Council Face-to-Face Berkeley, California November 18-19, 2014 Sean Hardman.
Small Bodies Node Ludmilla Kolokolova Carol Neese, Mike A’Hearn, Anne Raugh MC Face-to-Face Meeting Westwood, California 26,27 August 2014.
Small Bodies Node Report Michael F. A’Hearn, Donald R. Davis, Ludmilla Kolokolova, & Carol Neese 28/8/12PDS Management Councilmfa 1.
MAVEN Archive Overview J. Mafi PDSMC Face-to-Face Berkeley, California 18 November 2014.
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Status Reports: Messenger and Dawn S. Joy. MESSENGER It has been previously reported that the MESSENGER project did not plan on archiving any data EXCEPT.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
Coordinate Systems Mike A’Hearn & Don Davis. Origin of Problem Coordinate system issues for Dawn –Will NOT rehash these issues! SBN Advisory Council urged.
Tools Report Engineering Node March 2007
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Introduction to THEMIS ISRO-NASA Mars Data Analysis Meeting February 22-25, 2016 Bengaluru, India.
PDS4 Impact on Roses From response from PDS Nodes 4/2/13 PDS MC Meeting, Columbia MD, Apr 2-3, Node Small Bodies (Dust)*US Providers 1010.
April 2, 2009PDS Management Council - PPI Node1 Planetary Plasma Interactions Node PDS Management Council Presentation April 2, 2009 Raymond Walker Steven.
SBN-UMD short report. . Identify Missions and Instruments where archive products are behind schedule; particularly, those where the identified issues.
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia COSCAP-SEA Action on Decisions 16 th Steering.
Rosetta Status Mike A’Hearn.
SBN PDS4 Migration Planning
Post-Operation Status: Archiving, Calibration & Science
SPACE LINK AREA MID-TERM REPORT
Atmospheres Node Report
Helping Active Missions Convert to PDS4
Student Activity Training FY 18-19
Present and Future Deep Space Projects
ESA and Mars Express archive activities
Presentation transcript:

Dawn Archiving Status Carol Neese Eric Palmer Small Bodies Node PDS MC Face-to-Face Feb. 4-5, 2015

Developed PDS3to4 Migration Tool Can use PDS3to4 and OLAF to archive PDS 4 Supports PDS 1.4 – Including images R&A, especially DAPs, will be producing many small data sets. Mostly simple tables and images This route of migration allows building PDS4 data sets easily We invite nodes for a F2F with our software team to share ideas and learn how to use OLAF/PDS3to4 Ferret – Deployed basic search and summary view Miscellaneous

Dawn Archiving for Ceres -Dawn in good shape -Coordinate system approved – Oct Data was certified in time for DDAP Delivery through HAMO expected Feb Recalibration of Vesta VIR 3-micron region – Feb Vesta VIR Global Maps – Feb FC Ceres HAMO global and quadrangle mosaics – Mar/Apr 2016

Detailed Status – Ceres Mission Phase Level 1ALevel 1BLevel 2/Higher Framing Camera Approach and RC3 CertifiedNot yet submitted VIRApproach and RC3 Certified. Survey VIS-only Certified Approach and RC3 Certified GRaNDAccumulating for later review GravityTBD SPICETBDN/A

Detailed Status – Ceres Mission Phase CruiseApproachRC3SurveyHAMOLAMO Framing Camera Cert - 1ACert – 1A Imminent Feb 2016 Imminent Feb 2016 VIRCert – 1B Cert – 1A (Vis) Imminent Feb 2016 GRaNDImminent Feb 2016 Imminent Feb 2016 Imminent Feb 2016 Imminent Feb 2016 Imminent Feb 2016 GravityEnd of Encounter SPICEArchived When submitted

Through HAMO (our plan) – L1A & L1B – Jan/Feb 2016 Through end of mission (our plan) – L1A & L1B – Aug/Sep 2016 – Higher level products – Oct/Nov 2016 Vesta higher level products – No immediate plans. Most likely delayed until after Ceres Ceres tentative 2016 review schedule

Detailed Status – Vesta Mission PhaseLevel 1ALevel 1BLevel 2/Higher Framing CameraArchived Not submitted yet (except mosaics) VIRArchived Not submitted yet GRaNDArchivedCertified – minor liens Archived GravityArchivedN/AArchived SPICEArchivedN/A Framing Camera Global mosaics --Archived No Change

Vesta – Higher Level Products Higher Level ProductsStatusNotes Gaskell Shape ModelNot deliveredReprocessing for Claudia’’ DLR Shape ModelNot delivered FC Stray LightNot deliveredSoon. Data collected a few months ago FC Quadrangle MosaicsSample givenSoon Geologic Mapping QuadranglePublishedImages (jpg) archived in journal VIR 3-micron recalibrationNot deliveredNew calibration post RC3. Expect post-Ceres VIR Band Center & DepthSample providedIn progress VIR Distribution MapsSome publishedNo status No Change

Detailed Status – Mars/Cruise/Cal Mission PhaseLevel 1ALevel 1BNotes Framing Camera Mars, Cruise Certified through Vesta Stagnant Framing Camera Calibration Certified through Vesta Minor liens. Ceres calibration files in review. GRaND – CruiseArchived through Vesta N/AVesta-Ceres cruise submitted for review. GRaND – MarsArchived VIR – CruiseLiens-resolution Minor liens VIR – CalibrationN/AArchived; updated calibration in review No Change

Thank You

Archive Status Terms “Archived” – archiving is complete. “Certified” – Data are still in liens resolution, but publicly released with minor liens. “Liens Resolution” – Data have been reviewed and liens are being resolved by the mission. “In Review” – Data are currently in review at SBN. “Not yet submitted” to SBN for review. Items in red need attention. Others completed, nearly done, or making good progress.