GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep. 2006.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Optimization of the SiD Detector ? Adam Para, Sept. 18, 2006.
Construction and Installation of the CLIC Experimental Area
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
1 GLD Surface Assembly Y. Sugimoto KEK
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
LCWS14 Benoit CURE - CERN/PH Dept.1 International Workshop on Future Linear Colliders October 2014 Organized by the Vinca Institute of Nuclear.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Contents Will describe design of Beam Delivery System, focusing.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
Philip Burrows SiD Meeting, Paris 11/02/081 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University Thanks to: Tom Markiewicz.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Thoughts about LDC Hall and Assembly (Work is not finished.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
1 GLD and GLDc Sep. 12, 2007 Y. Sugimoto KEK. 2 Compact GLD Option Motivation –GLD and LDC will write a common LoI –The detector design should have common.
Detector design optimization for push-pull IR and for surface assembly and corresponding IR requirements Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting.
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Concept of Platform and Environment A. Hervé / ILD-Webex meeting.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
Cost Issues Y.Sugimoto, A.Maki Estimation Procedure Get unit cost from the cost estimation for GLD(DOD) Estimate (relative) amount of return-yoke.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
ILD requirement for assembly space and time 2015/11/3 Yasuhiro 1.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
1 A Consideration on Muon System II Y.Sugimoto KEK
Philip Burrows SiD Meeting, SLAC 27/10/06 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University.
1. Introduction 2. Magnetic field design Optimization of yoke configuration in several conf. Boundary conditions -
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
1 May 22, Y.Sugimoto Update of detector hall in mountain region.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
1 MDI/Integration issues of GLD(c) Yasuhiro Sugimoto KEK Jan. 15,
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
SiD Collaboration Meeting SLAC, December 2011
Interaction Region and Detector
2016/9/30 Yasuhiro Infra/CFS mini-ws
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Discussion of modification to DID field for detectors with TPC
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Update of experimental hall in Japanese mountain site
Detector hall in mountain regions
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Radiation Physics requirements for the IR
CMS Gantry for Detector Lowering
Detector hall in mountain regions
Extract from today’s talk given to DCB
Presentation transcript:

GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep. 2006

Background Experimental hall, detector assembly procedure, and iron yoke design are being re- considered Motivations are; Conventional facility (CF) construction schedule shown in Vancouver Distance between beam line and a wall increased from 12m to 12.5m due to change of crossing angle (2mrad+20mrad  14mrad +14mrad) Information about “Air-pad”

CF schedule

Underground experimental hall gets ready for detector construction at t=t 0 +4y11m  It would be impossible to start experiment at t=t 0 +7y Surface assembly hall can be ready at t=t 0 +3y If detectors are assembled on surface, we could get ready for experiment earlier than underground assembly by 1.5y or more

Surface assembly options Pure CMS-like assembly Detector is segmented into several large pieces ( <2000 ton /segment) (5 barrel rings and 3x2 endcap disks in case of CMS) Detector assembly and test are done on surface, then disassembled again and lowered to the underground experimental hall by 2500 ton gantry crane The large segments are moved by “air-pads” underground (no large crane in the experimental hall) Modified CMS-like assembly Detector is segmented into few tens of medium size pieces (<300 ton/segment) – Barrel yoke will be segmented into 24 (12(  )x2(r)) pieces Detector segments are pre-assembled on surface and lowered to the u.g. exp. hall by 300 ton movable overhead crane Final assembly and checkout of the detector are done underground

Barrel : 5 rings Endcap : 3 disks x2 CMS

Air pads for CMS

Possible drawback of two options Pure CMS Solenoid is supported by the central barrel ring  Thicker cryostat wall  Larger detector size Gaps between rings  More leakage field Precision of rings ?  Uniformity of B-field ? More number of iron slabs and more muon detector modules  Schedule and cost Job duplication on surface and underground  Schedule and cost Larger access shaft (  ~20m)  Schedule and cost Modified CMS More jobs underground  Schedule? Final construction of iron return yoke Solenoid installation and test Muon detector installation 300 ton cranes both on surface and underground  Cost Assembly procedure of heavy (~300 ton) pieces ?

Impact on detector/hall design Less jobs in the experimental hall than totally underground assembly scheme  Smaller hall size For modified CMS-style assembly, less iron allows smaller crane Barrel of the DOD design; ~8300 ton  400 ton crane is necessary if divided into 24 (12(  )x2(r)) A new iron yoke design is made; ~6100 ton  300 ton crane is OK Larger leakage field of the new design is compensated by additional coils

New iron yoke design Barrel 4.5<R<7.2m, 8x25cm+1x30cm iron + 8x5cm gap |Z|<4.45m (35cm shorter than DOD design) Endcap 0.4<R<7.2m with pole tip of 0.4<R<2.5m 4.5<Z<7.5m with pole tip of 4.2<Z<4.5m 10x25cm + 1x30cm iron + 10x5cm gap 5cm gap between barrel and endcap Leakage field 70 G (44 G for DOD design) at Z=10m Compensation coils at Z=10m and 12.5m can make it 10m

New iron yoke design “Air-pad” developed for LHC experiments allows free movement of heavy detectors If the barrel part of GLD can move both in z-direction and x-direction, Experimental hall width can be smaller (32m  25m) Detector can be placed at the center of the hall (in z- direction) Because of smaller detector size and slightly larger distance between the beam line and a wall, endcaps can be open normally (not like a door), and consequently, endcap calorimeters can be supported by endcaps

New iron yoke design

New experimental hall design Assumptions: New GLD geometry (R=7.2m, Z=7.5m) Modified CMS-like assembly scenario Temporary floor of the beam line for the BDS pre- commissioning has a width of 3 m Width of concrete shield used for the pre-commissioning is 3 m Nothing should be placed at the bottom of the access shaft Five large segments (Barrel and 4 halves of endcap) should have >1.5 m clearance around them for crane and human access

Discussion on the hall size Hall width 25m width would be necessary { 7.5m (detector) + 2.5m (crane access for concrete shielding) + 2.5m ( 3 cable chains (two for endcap halves and one for barrel)) } x2 =25m Hall height Less than 35m could be possible, depending on the shape of the vaulted ceiling This will be studied by CF group of GDE (Concept groups will provide information on the height of crane hook and crane capacity)

Cable chains for CMS