ROCSAT-2 Current Status of ISUAL Project Jyh-Long Chern of NCKU Yukihiro Takahashi of Tohoku University Henry Heetderks of UCB February 28, 2002.

Slides:



Advertisements
Similar presentations
During spacecraft-level environmental testing, after all instruments were integrated, the government assembled a data clerk team to support test data collection.
Advertisements

L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Team MADD Michael Davies Andrew Mountain Dan Hoang Daniel Brink Team MADD Michael Davies Andrew Mountain Dan Hoang Daniel Brink Power Distribution Control.
Laser Shoot-Out Game By Steven Noto and Laura Miller Advisor: Steven Gutschlag April 4, 2000 Senior Project Status Report 2.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Developments of CCSDS Data Compression for Space Exploration in CSSAR/CAS Center for Space Science and Applied Research Chinese Academy of Sciences
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
ISUAL Test Verification Matrix H. Heetderks. TRR December, 20002NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Verification Matrix -- Imager Related.
ISUAL Long Functional Test H. Heetderks. TRR December, 20012NCKU UCB Tohoku ISUAL Long Functional Test Heetderks Basic DPU Function Verify Power on Reset.
ISUAL Sprite Imager Electronic Design Stewart Harris.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
ISUAL Instrument Software S. Geller. CDR July, 2001NCKU UCB Tohoku ISUAL Instrument Software S. Geller 2 Topics Presented Software Functions SOH Telemetry.
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Configuration Management (CM)
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
ISUAL Spectrophotometer Overview S.Harris. NCKU UCB Tohoku Spectrophotometer S. Harris IFR 5 Mar Spectrophotometer Description Six Channels Identical.
NCKU UCB Tohoku ISUAL / ROCSAT-2 August 2001 Sprites observation by ISUAL on the ROCSAT-2 satellite J. L. Chern, R. R. Hsu, H. T. Su, A. B. Chen, and L.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
ISUAL Mass Memory Robert Abiad. NCKU UCB Tohoku Mass Memory R. Abiad CDR 9-10 Jul Outline Description Requirements Interfaces Block Diagram Usage.
ISUAL Mass Memory Robert Abiad. NCKU UCB Tohoku Mass Memory R. Abiad IFR 5-7 Mar Outline Description Requirements Interfaces Block Diagram Usage.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
ROCSAT-2 Current Status of ISUAL Project Yeou-Shin Chang of NSPO Jyh-Long Chern of NCKU Henry Heetderks of UCB October 3, 2001.
ISUAL Sprite Imager Interface and Status Review Stewart Harris.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
ISUAL Data Formats & Science Data Processing S. Geller.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
NCKU UCB Tohoku GSE Software, T.T. Wang 1 Ground Support Equipment(GSE) Software Tzu-Te Wang.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
PAO 1 Telecon THEMIS Public Affairs Status Telecon.
STEREO PLASTIC PLASTIC: The Plasma and Suprathermal Ion Composition Investigation on STEREO A.B. Galvin, E. Moebius, L. Kistler, M. A. Popecki, J. Quinn.
1 HIPO Trimester Review Status Report Ted Dunham Lowell Observatory 28 April, 2009.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
ROCSAT-2 Critical Design Review ISUAL Thermal Interface Design / Analysis Report Jeng-Der (J.D.) Huang ( 黃正德 ) Tsung-Yao (Andy) Chen ( 陳宗耀 ) Jih-Run (J.R.)
ROCSAT-2 Current Status of ISUAL Project Yeou-Shin Chang of NSPO Jyh-Long Chern of NCKU Henry Heetderks of UCB October 3, 2001.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
ISUAL Spectrophotometer H. Heetderks. SDR 7 Jun 20002NCKU UCB Tohoku Spectrophotometer H. Heetderks Spectrophotometer Description Six Channels Identical.
ISUAL System Design H. Heetderks. PDR 31 August 2000NCKU UCB Tohoku ISUAL System Design H. Heetderks 2 ISUAL Operations Overview.
11/3/2000cmd_soh1 SOH and CMD Current Status. 11/3/2000cmd_soh2 ISUAL Flight Software 0.0 SOH Telemetry CMD Input Debug I/O.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
NCKU_UCB_TohokuISUAL-IFR : DCM (version 2.0) July 9, 2001Tong-Long Fu 1 Data Compression Module ( DCM ) Tong-Long Fu Laboratory of RF-MW Photonics, Department.
ISUAL System Design Summary H. Heetderks / S. Harris.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review RFAs and Recommendations Peter R. Harvey.
Ball Aerospace Scalable Configurable Cryocooler Electronics (SCCE)
GLAST Large Area Telescope:
ISUAL Imager Stewart Harris.
I&T&C Organization Chart
ISUAL Product Assurance
ISUAL Associated Electronics Package
ISUAL Sprite Imager The Effects of Mask Pinholes: Test Results
Launch and On-orbit Checkout
Instrument Overview Larry Springer HMI Program Manager
Command and Data Handling
Integration & Test Instrument Operations Coordination
Presentation transcript:

ROCSAT-2 Current Status of ISUAL Project Jyh-Long Chern of NCKU Yukihiro Takahashi of Tohoku University Henry Heetderks of UCB February 28, 2002

ROCSAT-2 Current Status at UCB  Development of the ISUAL  Fabrication and Initial Testing of the Spectrophotometer ETU is complete  System taken to Colorado mountain for testing with actual sprites  Sprites successfully detected with expected sensitivity  Cosmic ray contamination problem identified  New PCB layout is complete and ETU and Flight boards have been etched  New PCB is currently having parts installed  Assembly of the ETU Sprite Imager is fully complete  Camera system electronics with all operating modes is fully checked out  All mechanical parts have been made for both ETU and flight units  ETU is fully wired with all circuit boards, heaters, thermistors, motor, etc.  Flight unit and NSPO ETU sub-assemblies are now being wired and assembled  Optics assembly problems have been solved  New tapers from Schott received and have very low defects  Masks have been successfully deposited at UCB  First flight intensifier/taper/mask/window/CCD assembly complete  We will make a total of 4 assemblies and pick the best for flight

ROCSAT-2 Current Status at UCB  Development of the ISUAL (Continued)  Imager ETU has been fully assembled  Drawings for revised Thermoelectric Cooler system are nearly complete  Fabrication of new parts will begin week of 4 March  Life testing is underway on ETU Filter wheel with flight motor  Unit has operated for the equivalent of five years on orbit under vacuum at +45 deg C.  Very little evidence wear on motor or gears  We are now setting up to do a similar test at -40 deg C.

ROCSAT-2 Current Status at UCB  Development of the ISUAL (Continued)  AEP ETU Fabrication and Testing has made substantial progress  Checkout of Mass Memory is complete  DPU Checkout is mostly complete  Interface to AP is checked out and working  Interface to Mass Memory is checked out and working  Interface to Analog Telemetry System is fully checked out  Interface to DCM is fully checked out  Interface to High Voltage control system checkout is in process  Interface to Spectrophotometer (IDC) is not yet complete  DCM has made great progress  Hardware bugs on ETU board have been corrected with cuts and jumps and added components  New board layout with circuit changes is being done at NCKU  We believe we are very close to having BIOS software running in the DCM which will allow compression code to be uploaded from the DPU and run in the DCM  PCB layout of the final board in the AEP, the Instrument Data Control (IDC) board is now almost complete We expect to have an etched board by 15 March

ROCSAT-2 Current Status at Tohoku  Development of the AP  AP ISD (AP interface testing model) and IGSE (Interface simulator for AP) were bought to UCB and successfully tested  Tohoku has delivered AP document package to UCB (part of Milestone 2 package)  "Milestone 1" has been confirmed and paid by UCB  Schedule of environmental tests in Japan is under arrangement. It will be fixed in a week.  Radiation tests for some ICs and PMTs were conducted with a total dose of 30 K rad. No problem was detected.

ROCSAT-2 Current Status at UCB  IGSE Systems Status  Hardware is complete and two systems are operational  One is currently at UCB and the other is in France where it was used to support the successful testing of the ISUAL ISD  We had a nasty bug develop in the IGSE which caused occasional loss of science data packets  The problem appears to be due to a subtle bug in the operation of the National Instruments I/O boards which we are using to perform the simulated spacecraft interface  We have made software modifications which include switching from C++ based drivers to Labview drivers  This appears to have corrected the problem

ROCSAT-2 Current Status at NCKU  Development of the DCM  DCM (third version PCB) is used for software/BIOS/interface implementation testing  Technically, the design of the DCM ETU will be finalized in this version  Code implementation with assembly language is working on  We are trying to catch the schedule  Overall, NCKU’s DCM should be done within this year NCKU is scheduling to be at UCB in mid-December or early January for integration verification; after that ETU will be made at UCB (expected late January) and then flight model (expected February).  NCKU will deliver  Hardware testing note  Software code book  DCM PCB (hardware)  Complete DCM ETU design

ROCSAT-2 Current Status at NCKU  Development of GSE  GSE  Second version of Code book (GSE004) is complete  Should be done by the end of this year  Working on integration and testing with hardware  After finishing  NCKU will deliver Code book Testing Performance Evaluation Report

ROCSAT-2 Current Status at NCKU  Optical Design and Testing  Optical analysis on ISUAL CCD imager is complete  Publication:  Books can be downloaded from web site: More technical information including codes can be found over the web  Currently, we have submitted three technical papers of optical analysis and got one paper accepted. More researches in the areas of optical analysis and blind image deconvoltuion are on-going  Overall, ISUAL data will be used for more technical publications as a unique demonstration for novel data analysis algorithms as well as validating the test and evaluating the performance of the optical system (This is still very optimistic.)

ROCSAT-2 Current Status at NCKU  Optical Design and Testing  Workshop (on mid-December at NCKU campus) :  Dr. Leo Gardner, Chairman of the Optical Design of the Optical Technology Division of OSA, is invited to talk about his experience on optical system design in the workshop: Design and Analysis Optical System More information can be found in web site  In the next February, another tutorial course on optical design analysis with ASAP will be offered at NCKU campus. The lecturer is an experienced engineer from BRO.  Optical Testing facilities  Will be completed by the end of this year

ROCSAT-2 Current Status at NCKU  Science Data Distribution Center  Incorporating the CCSDS standard in data format  Studying the telemetry commands for the ISUAL operation  Reviewing CDF Skeleton Table for ISUAL data  Evaluating data query functions and schemes for the ISUAL data  Working on operational handbook  (mission operation management)  Simulation environment (parallel computing has been built)

ROCSAT-2 Current Status at NCKU  Science team  Ground observation  Publications: Six papers are submitted for publication (expect two of them will be accepted)  Meeting and international conference in the near future: Will attend this coming AGU meeting for paper presentation as well as the coordination meeting for the joint observation of the Sprites  Activity: Ground observations have been made; More ground observation activities have been scheduled  Simulation  The simulation code is now under developing