LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: www.cern.ch/r2e LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.

Slides:



Advertisements
Similar presentations
Discussion on TE/CRG equipment at H4IRRAD Marco Pezzetti (A. Tovar – B. Ivens / Support CE for cryo LHC) & TE-CRG-OA – TE-CRG-CI 1TECRGCE M.PEZZETTI.
Advertisements

Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Interlocks for Magnet Protection System1 Beam dumps 4 th 11h33 and 5 th Both beam dumps caused by a stop of a Powering Interlock PLC,
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
LHC Beam Dumping system
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
TS-LEA, CERN, 1211 Geneva 23 1 T. Wijnands TS/LEA, C. Pignard AB-CORADWG-RADMON day – 1 December 2004 LHC Power Converters & Radiation T. Wijnands TS/LEA.
R2E Weekly Report status AT/MB/MC – 4 th R2E Project Meeting – 7 th April 2011.
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
TE-MPE-EP, RD, 30-Nov DQLPR - are there any R2E issues? R. Denz, TE-MPE-EP.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
QPS R2E Status R2E Internal Meeting, October 24 th 2013Discussion 1 LS1 developments Digital Quench Protection insertion region magnets Delivery/installation.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
TE-MPE-CP, RD, 06-Oct Radiation Induced Faults in QPS Systems during LHC run 2011 R. Denz TE-MPE Technical Meeting October 6 th.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
R2E Mitigation Project – Status & Outlook August 22 nd 2011 (R2E) Mitigation Project: CMAC Meeting, August 22 nd 2011 Radiation To Electronics.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
LHC Cryogenics Schneider PLCs: Radiation tests at H4IRRAD Mitigation measures M. Calviani, M. Brugger, G. Spiezia (EN/STI) E. Blanco, J.M. Beckers, D.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
TE-MPE-CP, RD, 12-Dec QPS - analysis of main problems, areas to target, possible improvements R. Denz, TE-MPE-CP Evian 2011.
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
LHCf collaboration meeting, Nagoya, January 2009A. L. Perrot LHC news A. L. Perrot CERN, EN/MEF-LE LHCf collaboration meeting, Catania, 6 th July 2009.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
Ion Run 2015: measurements in cells 11 for P1 and P5 P–Ion Run 2016: analysis of cell 8 for P1, P5, P2 and P8 Corinna Martinella EN-EA R2E-MCWG 04/07/2017.
Planning and strategy for HL-LHC R2E
CONS and HL-LHC day Analysis of needs from TE-EPC
LHC during week 45 LHC delivered ~0.837 fb-1 in week 45
R2E impact of TCL settings: input for 2017 operation
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
The LHC - Status Is COLD Is almost fully commissioned
R2E – Experience and Outlook for LS1
Accelerator and Experiment Interface Session: LS2, LS3
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
X X X QURA PLC X RM01_R X RM01_L Long-Term?: QURC(A,B) QUI (-1)
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Collimator Control (SEUs & R2E Outlook)
Summary of Week 16 G. Arduini, J. Wenninger
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Preliminary Analysis and foreseen actions EN-ICE&EN-STI
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
RADIATION induced failures in LHC 28th June 2011
Radiation To Electronics Collimation Areas (IR7/3)
Radiation To Electronics 2x A Brief Look
R2E LMC Update (Weeks 32/33) Post-Mortem database: SEE analysis and link to existing RadWG list in preparation Shielding block delivery crisis solved:
Presentation transcript:

LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf of the R2E Project Review follow-up: LinkLink !!! Many Thanks To Everybody !!!

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Power-Converter Riddle AC/DC Problem understood Full Mitigation (LS1) ‘New’ Failures Vacuum PLC in P7 Increase in Rad-levels ‘New’ Critical Area Cryo Mecos in UX45 P4 10x more radiation in 2012 ‘Heaviest’ Radiation Test & Biggest ‘Burn’ H4Irrad last run (11 parallel User) ‘Spectacular’ final failure Introduction

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Critical areas well within predictions Operational parameters are important Other areas not to be forgottenn e.g, UX45: 2011: 2.6x : almost 2x10 7 cm -2 Radiation Levels Predictions versus Observations (scaled to exp. lumi) 1.1x x x x x x x x10 7 …and Today Decrease: TCL closed Increase: Tight Collimators

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 xMasBreak Actions very efficient Mecos AMB Events (P4/8) 4 © A. Suraci et al. TE-CRG-OA Better cleaning/control of the beam CV891/fb ? Cryogenics TS2/3 Period interesting

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 Difference in the periods between Technical Stops? Clear correlation – Reason? (Vacuum [Scrubbing, Solenoids], Satellite Bunches, … ?) Interesting behaviour also in P4 5 Cryogenics

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th H4irrad tests confirmed expected sensitivity Cryogenics UPS FIRE No Beam (4h40) Beam without Target (7h40) Destructive SEU AMB Mecos Linde Type (P4/P8) S2M X X X X X X X 2X X X XXXX Vacon X No Beam (12h10) SEU Similar to P4 events 3h502h40 © B. Ivens, F. Morant, M. Pezzetti et al.

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Locations: UJ56, UJ76, UX45, US85 Failure types: Mecos AMB Profibus communications Mitigations: AMB case (UX45, UX65, US85): Relocation under study [Mecos, S2M] Profibus: Relocation from UJs during LS1 Main Impact: Important contribution to R2E downtime Cryogenics DumpDump/TBCNo DumpNo Dump/TBC 4210 Status November 2012

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th QPS – SEE Related Failures DumpDump/TBCNo DumpNo Dump/TBC Locations: UJs, RRs, DS Failure types: Digital DAQ systems for nQPS 600A protection uFIP communication Mitigations: New DAQ system under design (FPGA) Firmware upgrades BricoFip (mid-term)/NanoFip (long-term) Main Impact: caused most of the R2E dumps Status November 2012

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th QPS – SEE Related Failures R2E consolidation 2012: 27 R2E trips during stable beam >LS1: with all foreseen measures in place: 1 © R. Denz, J. Steckert 2011: 3.5 dumps per fb : 1.4 dumps per fb -1 1/3 of errors in UJ14/16/56

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Locations: UJs, RRs, ARC Failure types (only confirmed ones kept in follow-up): 600A: Aux Power Supply [14] FGC [10] 120A failure [1] Mitigations: AC/DC power supply problem understood New FGClite design (on-going) Radiation tolerant power converters (started) Main Impact: Many destructive failures Power Converters DumpDump/TBCNo DumpNo Dump/ TBC Status November 2012

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Failure Overview Dump ConfirmedDump TBCNo DumpNo Dump TBC Destructive failures Dump ConfirmedDump TBCNo DumpNo Dump TBC Preliminary! Status November 2012 (all failures)

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Total R2E related downtime ~250 (confirmed) - ~300h (incl. TBC) Mainly based on dump cases (others difficult to track) Downtime Analysis Preliminary! Status November 2012

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 What Changes After LS1 13 Main impacted systems – observed failure signatures: Equipment Upgrades New developments Relocation (UJs, US85, UX45 partly) Shielding (RRs) (Future) Commercial systems: Full relocation (except REs) No new installation in critical areas without radiation tests & developments >LS1 R2E related failures: Compatible with nominal/ultimate goal Enormous Effort during LS1

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Tunnel Equipment: DS/ARC will get critical Long-term damage to be considered (cells 8-13) Impact of 25ns operation? Future upgrades/new installations RRs & Power Converters FGClite prototype in time and to be deployed Power-part R&D started & component tests on-going Areas to be watched UX45!, (UX25), UX65, UJ/UA23, UJ/UA87 (+REs) What Remains After LS1

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Implementation has started General layout soon to be frozen Optimization (RP, CV, Tests) on-going Solutions for rail system investigated 1 st Planning exists DIRAC dismantling critical to be ready in time Aiming for 2014 Operation PS-EAirrad

LMC Update - R2E Failures December 5 th 2012 R2E: Past/Present/Future ~3 dumps per fb ~12 dumps per fb /12 xMasBreak ‘Early’ Relocation + Additional Shielding + Equipment Upgrades Several shielding campaigns prior Relocations ‘on the fly’ + Equipment Upgrades < 0.5 dump per fb -1 R2E-Project aiming for … >LS1 (nominal -> ultimate) 2012 SEE Failure Analysis -Equipment 4+ LHC Points (>100 Racks, >60 weeks of work) -Additional shielding -Critical system upgrades (QPS, FGC) 16 Status November 2012

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th , xMasBreak and previous actions very efficient 2012 Failures: Within Chamonix predictions … and the winner is: QPS + EPC (+Cryo) LS1 Mitigation Enormous relocation campaign (4+ Points) Remaining shielding Numerous system upgrades (QPS, EPC) R2E test facility in preparation Long-Term Damage & 25ns Operation -> impact on radiation levels in ARC/P4/P6 Conclusions

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th BACKUP

LMC Update - R2E Failures December 5 th 2012 UJ overview High Energy Hadron Fluence [  /cm -2 ] Area /fb /fb -1 Comments UJ142.8* * x x10 6 Physics deb. UJ162.2* * x x10 6 Physics deb. UJ231.5* * x10 5 (*)1.5x10 5 (*)Injection UJ563.9* * x x10 6 Physics deb. UJ766.4* * x10 6 (*)3.4x10 6 (*)Collimation UJ873.0* * x10 5 (*)1.5x10 5 (*)Injection P1: decrease by factor of 6x, thanks to additional shielding P7: increase due to tight collimator settings P2/8: reduction because of cleaner injections in the LHC (*) = ATLAS/CMS luminosity 19

LMC Update - R2E Failures December 5 th 2012 RR overview P1/5: decrease up to a factor of 2x (1.5-2x) due to TCL.4 closure P7: asymmetry L/R (also observed in operation) High Energy Hadron Fluence [  /cm -2 ] Area /fb /fb -1 Comments RR137.2* x x x10 5 Physics deb. RR178.4* x x x10 6 Physics deb. RR531.2* x x x10 6 Physics deb. RR571.0* x x x10 6 Physics deb. RR737.7* x x10 6 (*)2.4x10 6 (*)Collimation RR771.1* x x10 6 (*)1.2x10 6 (*)Collimation (*) = ATLAS/CMS luminosity 20

LMC Update - R2E Failures December 5 th 2012 UX overview (4/6/8) P4: increase, beam-gas coupled with higher cumulative current in the machine How much can/will it go up in view of 25ns operation? High Energy Hadron Fluence [  /cm -2 ] Area /fb /fb -1 Comments UX452.6* x x10 5 (*)8.2x10 5 (*)Beam-gas UX65N/A~1.x10 6 N/A Beam-gas UX852.1* x x10 8 (**)1.6x10 8 (**)Physics deb. US854.4* x x10 7 (**)4.1x10 7 (**)Physics deb. (*) = ATLAS/CMS luminosity (**) = LHCb luminosity 21

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Leakage into DS getting important Cells 7-10: ~10Gy <Cell17: ~1Gy >Cell17: ~0.1Gy Currently relatively low vacuum activity ?How will this possibly change with 25ns? ARC & DS

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Beam Loss Analysis (B1) Injection: ~7-8x10 16 Lost protons: Total: ~1x10 16 Experiments: ~3.4x10 15 Rest: ~6.6x10 15 Collimation: IR3: ~6x10 14 IR7: ~6x10 15

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Beam Loss Analysis (B1) Injection: ~7-8x10 16 Lost protons: Total: ~1x10 16 Experiments: ~3.4x10 15 Rest: ~7.4x10 15 Collimation: IR3: ~7x10 14 IR7: ~6.7x10 15

LMC Update - R2E Failures December 5 th 2012 Cryo Actions Taken CV891: automatic reset implemented into PLC (action: switch off 24 Vdc) TT89x: modification of electronics card PLC: moved into better protected zone (P4-P6-P8 caverns) 24 Vdc: longer term, to be moved into a safer protected zone and better distribution of power consumption to be done. AMB (Magnetic bearing controllers): relocated partially in P8, (2 nd unit will be done at LS1, additional shielding foreseen; at P4, will be done during LS1

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th UJs: relocated DSP: To be replaced by rad-tol version + Firmware upgrade of the uC based boards oQPS, nQPS: Firmware upgrade for DAQ systems, dipole splice supervision boards, current lead protection systems (RR) Detectors with rad-tol DAQ in cells 8-12 (nDQQDL) IPQ/IPD/IT: Rad-tol DQQDI in all RRs (200 boards already produced) 600A: Rad-tol quench detection board (prototype developed) Optional: Special rad-tol splice superivsion and BricoFIP TM QPS R2E Upgrades

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Vacuum DumpDump/TBCNo DumpNo Dump/ TBC 4300 Locations: UJ76 (all confirmed), Point 4 (TBC), Point6 (TBC) Failure types: Loss of the PLC control (soft) Power supply (destructive failures) Mitigations: Relocation from UJ76 Status November 2012

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th Failure Statistics

LMC Update - R2E Failures December 5 th 2012

LMC Update - R2E Failures December 5 th 2012

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012

LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012