Chiho Wang ATLAS TRT Krakow Workshop Duke University May, 1999 1 HV Plate Design & Assembly Chiho Wang Duke University.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Chiho Wang ATLAS TRT Duke University Hampton, May Xe-CO 2 Stability Chiho Wang Duke University.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Burglar Alarm Leaving Certificate Technology. Parts List.
LCWS 31/5/2007Erik Johnson STFC,RAL1 ILC Vertex Detector Mechanical Studies Erik Johnson On behalf of the LCFI collaboration STFC, Rutherford Appleton.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
1 GEOMETRY FOR TRACKER Eduardo do Couto e Silva - 2/11/00 (drawings are NOT to scale) 1 - List of Figures 2 - Top view of tray with 5 x 5 detectors 3 -
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
RO400FC Forced convection hot air reflow oven. In a flexible production, what do you need for soldering of  Complex PCB’s  Soldering of fine pitch on.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
May’02, TRT Workshop Jack Fowler – Duke University SEM Analysis of Radiation Test Samples at Duke University Jack Fowler.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Chiho Wang TRD Conference Duke University Bari, Sep Design and Construction of the ATLAS Barrel TRT Chiho Wang Duke University.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Part II: Using PCB Layout Software – Custom Component Libraries
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
HV connection for a Common GEM foil design Aiwu Zhang
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
ATLAS TRT Barrel Design Review, 1998 Barrel TRT Electronics Cooling Chiho Wang Duke University.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Jack Fowler Spain Workshop 2003 Faraday Shielding for Barrel TRT Jack Fowler Duke University Spain Workshop
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Visit to Heidelberg Loek Ceelie Henk Schuijlenburg.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
ATLAS TRT Duke University CERN, Feb Barrel Capacitors  With socket and bent pin, forms capacitor assembly  Duke supplies capacitors, Hampton assembles.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Make a Model A box company makes boxes to hold popcorn. Each box is made by cutting the square corners out of a rectangular sheet of cardboard. The rectangle.
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Boxes Chiho Wang Duke University.
HV Cable and Snout Conflict: Problem and Possible Fix James Mott g-2 Tracker Meeting 02/25/16.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Building Boxes What is the largest volume open top box that you can build from an 8 ½ by 11 inch sheet of paper?
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Chiho Wang Technical Training Duke University May, Stringing 101 Chiho Wang Duke University.
W. EbensteinDOE annual review Duke UniversitySeptember, 1998 TRT Barrel Cooling: Electronics  Motivation: u Overheating of electronics causes premature.
Chiho Wang ATLAS TRT Duke University CERN, Feb Gas-Flow Measurements Chiho Wang Duke University.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Jack Fowler Duke University Spain Workshop
Barrel TRT Module Cooling
Module Production and Testing at Duke
Design of Distribution Feedbox at LHC P7
Step-by-Step Assembly Instructions – Cube Version
Step-by-step assembly instructions
Presentation transcript:

Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University

Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design  HV plate components: u Thin plate  Single sided circuit  Provide HV grouping for straw u Thick plate  Plan FR4 precision machined part  Determines: –Module alignment on support frame –Straw locations u Kapton sheet  Double+ sided kapton circuit  Brings HV from fuse box to straw HV group  Brings grounding to shell  Only on one side of the module.

Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Features  Thin plate: u 0.2mm thick, fits inside thick plate. u Straw hole size: 4.5mm, 0.1mm > thick plate hole size: 4.4mm  Thick plate: u Flush to shell, sets module length. u 0.25mm from support frame in Z u 0.4mm indent along radial sides for kapton sheet feed-through. u 5mm spacing from bottom to tension plate is in active gas. Capacitor barrel functions as stand off. u Cooling tube feed-through at acute corner is outside of gas volume

Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV plate feature  Kapton sheet: u Trace width = 0.3mm, thickness = 0.038mm u Trace offset when overlap = 0.35mm center-center. u Traces run equi-distant between straws. u Resistor pad is next to capacitor socket and inside straw HV group

Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV plate assembly  Glue 3 plates together u Use tra-bond Brush on think plate and kapton sheet u Use capacitor sockets for alignment u Compress and let cure  Solder capacitor sockets u Solder on thin plate side and on kapton side to complete circuit u Flow solder around socket for gas seal  Solder resistors on kapton