Objectives of the Proton Improvement Plan Stuart Henderson Fermilab Proton Source Retreat Dec. 7-8, 2010.

Slides:



Advertisements
Similar presentations
Booster Synchrotron Cavities: An Overview in the Context of PIP Mohamed Hassan, Timergali Khabiboulline, Vyacheslav Yakovlev 07/03/2013.
Advertisements

Unit 1: Introductions and Course Overview Administrative Information  Daily schedule  Restroom locations  Breaks and lunch  Emergency exit routes 
Service Design – Section 4.5 Service Continuity Management.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
IT Project Management Weeks 2 and 3. Topics of Discussion Introduction Identify the Business Case Scope the Project Plan the Project Delivery and Outcome.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Security Policies Jim Stracka The Problem Today.
Chapter 11: Project Risk Management
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
PDD: Project Management Today & Tomorrow Doug Forsell, PMP ® HomeNet Communications, Inc.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Executive Session Director’s Progress Review of the NOvA Project August 4-5, 2010 Dean A. Hoffer.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Introducing Project Management Update December 2011.
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Chapter 11: Alternative Approach - Purchasing Systems.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
1 © The Delos Partnership 2004 Project Management Executing the Project.
Ditigal Presentation Week#5 Comm 613 by Tanisha Walker.
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Accelerator Status and Plans
Proton Improvement Plan Overview Bob Webber July 13, 2011.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan Expectations Eric Prebys AD/Proton Source.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Proton Planning Eric Prebys FNAL Accelerator Division.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Source July 21, 2006 E Prebys 1 Proton Plan Meeting Agenda:  Review of parameter list: Prebys, Kourbanis  Status of writing assignments Prebys,
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
March 2008 – DRAFT 1 Electronic Health Record (EHR) Task Force Financial Analysis Isabelle de Zegher and Greg Stadler.
PAC Meeting, December 12, Prebys 1 The Problem.
Subcommittee on Hydrology, ACWI New Extreme Storm Work Group Status and Plans.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Proton Source Reference Notes for mu2e at Fermilab 1 Section 1: Compilation of parameters describing the existing Fermilab accelerator complex and the.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
Recommendations from Previous Review Greg Bock Fermilab Science & Technology Review November
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Jefferson Lab Overview
Future Trends in Nuclear Physics Computing Workshop
Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon
Figure 3: Risk Analysis Model
Time Scheduling and Project management
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Objectives of the Proton Improvement Plan Stuart Henderson Fermilab Proton Source Retreat Dec. 7-8, 2010

Objectives Develop a plan, the Proton Improvement Plan (PIP), to meet the goals for Proton Source throughput, while maintaining good availability and acceptable residual activation The plan shall include the required scope, cost, schedule and human resource requirements needed to deliver  the required proton throughput  good availability  acceptable beam loss The plan therefore should address the necessary hardware modifications both for increased repetition rate and improved beam loss, while ensuring viable operation of the proton source through Stuart Henderson, Proton Source Retreat, Dec. 7-8, 20102

Further Elements of the Plan and Planning Process The plan should deliver the proton throughput goals with acceptable risk  In other words, we will not be able to afford to eliminate every vulnerability The plan should identify remaining vulnerabilities at the completion of the plan, and articulate backup plans for those vulnerabilities The plan should identify “hard limits,” beyond which it will become very costly to proceed For example, beamloss and residual activation is one such hard limit. How much improvement in fractional loss can we realistically expect? Stuart Henderson, Proton Source Retreat, Dec. 7-8, 20103

My Thoughts on this Effort If we make a commitment to the physics program, we must deliver on that commitment Conversely, we should not make plans for the experimental program if they’re not supported by plans for delivering the beam Failure to deliver on today’s programmatic commitments jeopardizes tomorrow’s plans This planning process serves very important functions of 1) developing a path to achieve the program goals we have already signed up for, 2) providing a basis for realistic planning going forward Therefore  I view the completion of the PIP, and our execution of it as an urgent, extremely high-priority activity  I have made the completion of the PIP a priority for AD management  I will commit to working at the Directorate level to funding a plan of reasonable scope. Stuart Henderson, Proton Source Retreat, Dec. 7-8, 20104

Planned, Proposed and Imagined Experiments The situation is complex. We do not (and will not) have all the information. The figure summarizes the planned, proposed and readily imagined requests Stuart Henderson, Proton Source Retreat, Dec. 7-8, 20105

Experiments: Goals and Derived Performance Parameters GoalDerived Quantities for Booster ExperimentOperations Start (CY) Total Proton (E20) Protons/ year (E20) Duration (years) Protons/ hr (E17) Batch Size (E12) Batch/ MI Cycle Rep rate (Hz) Effic ienc y NOvA (+LBNE) GeV MicroBooNE (+MoreBooNE) 2013 Q Mu2e2018 Q g Q Stuart Henderson, Proton Source Retreat, Dec. 7-8, Assumptions: 1.33 sec Main Injector cycle time 95% Efficiency for 8 to 120 GeV Note that 44 weeks operation at 80% availability gives 0.67

Proton Throughput in “Minimal Program” Scenario Stuart Henderson, Proton Source Retreat, Dec. 7-8, 20107

Beam Repetition Rate in “Minimal Program” Scenario Stuart Henderson, Proton Source Retreat, Dec. 7-8, 20108

Proton Throughput in “Maximal Program” Scenario Stuart Henderson, Proton Source Retreat, Dec. 7-8, 20109

Beam Repetition Rate in “Maximal Program” Scenario Stuart Henderson, Proton Source Retreat, Dec. 7-8,

Goal for The Proton Improvement Plan The Proton Improvement Plan, when executed, should enable Linac/Booster operation capable of  delivering 1.8E17 protons/hour (at 12 Hz) by May 1, 2013  delivering 2.25E17 protons/hour (at 15 Hz) by January 1, 2016 while  maintaining Linac/Booster availability > 85%  and maintaining residual activation at acceptable levels and ensuring a useful operating life of the proton source through In addition, the plan should identify remaining vulnerabilities at the completion of the plan, and articulate backup plans for those vulnerabilities identify “hard limits,” beyond which it will become very costly to proceed Stuart Henderson, Proton Source Retreat, Dec. 7-8,