General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.

Slides:



Advertisements
Similar presentations
ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
Advertisements

13-Feb-2014 Phase 2 upgrade “ME0 stack options” J. Hauser, UCLA  In Shashlik and CFCAL HE designs, space of  z~30 cm exists behind 10 lambda for muons.
Talk #3: Novel Detector technologies and R&D M. Abbrescia, P. Iengo (ATLAS), D. Pinci (LHCb)
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
CMS Phase 2 Upgrade: Scope and R&D goals CMS Phase 2 Upgrade: Scope and R&D goals October 21, 2014 Jeremiah Mans On behalf of the CMS Collaboration.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times,
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
The CMS Upgrade Program ECFA High Luminosity LHC Experiments Workshop Aix-les-Bains, October 1, 2013 J. Spalding, on behalf of the CMS Collaboration 1.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
The CMS Level-1 Trigger System Dave Newbold, University of Bristol On behalf of the CMS collaboration.
1 HCAL Upgrade TP simulation studies Jane Nachtman (Iowa) – for the HCAL group Trigger Upgrade meeting April 28, 2010.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Workshop 24 Jun 11 AB Workshop on GEMs for CMS high  Last September’s workshop showed that MPGD technology is now mature. Stable operation of large area.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Proposer: B.Satyanarayana Mentor: Prof Naba K Mondal
25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
1 Triggering on Diffraction with the CMS Level-1 Trigger Monika Grothe, U Wisconsin HERA-LHC workshop March 2004 Need highest achievable LHC Lumi, L LHC.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Phase 2 muon plenary, 11-Feb-2015 Jay Hauser  Based on three main arguments:  Age/reliability  Radiation tolerance  Maintainability  Bonus: L1 trigger.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
24/03/99Report to LHCC Referees Muon Group Status Report Outline: Muon Filter - New Geometry - Support System Optimisation Studies - Pad, Strip and Pad/Strip.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
Preparation & Commissioning of TOTEM for the Run-II of LHC S.Giani on behalf of the TOTEM Collaboration.
Technology and R&D Summary and next steps Burkhard Schmidt.
Muon Upgrade Simulations Status Alexei Safonov Texas A&M University.
ME0 ME0 Baseline – Design, Project Planning & Execution – Marcus Hohlmann Florida Institute of Technology Comprehensive Review – Phase 2 Muon Upgrade,
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Roberto Calabrese Ferrara University and INFN
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
SLHC Muon Upgrades and Impact on Trigger
for the transition region on behalf of the RPC upgrade group
ATLAS L1Calo Phase2 Upgrade
Status of Full Simulation for Muon Trigger at SLHC
Not baseline: ASIC, DCFEB R&D if L1A latency > 10 ms
Anna Colaleo - INFN-Bari On behalf of the CMS Muon group
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
A DLC μRWELL with 2-D Readout
Presentation transcript:

General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other endcap calorimeters  EE and basic HE driving the calor. design, not tail catcher >9.5  Excellent simulation progress  See Cesare Calabria talk at today’s muon POG “now we have a 2023 scenario that works with all the muon upgrades!”  TP contacts group has started assembling text for a 30-page draft  This week: LHCC upgrade presentation concentrating on R&D activities  Three slides sent as input for Didier, see backup  Upgrades Week at Karlsruhe Mar. 31-Apr. 4  Have you registered?  First draft of the TP to be prepared 1

General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal” 2

 March 3-7  Have fragments of sections 1, 2, 3  Missing sections 4, 5, 6, 7, 8, 9  Very few figures  March expect parts of all sections, draft figures  Urgent!  March TP contacts work on improving readability  March Fabrizio-organized internal review  24 th Release draft to muon IB (reading group?)  28 th Have a muon IB reading  NB presentation to USG on longevity R&D plans, Mar. 17? 3

General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  DT: is MTT part of the baseline plan?  Currently not. Needs specific motivation from simulation, and/or approximate cost estimate as “option”.  RPC:  Is multi-gap for fine time resolution the baseline (sim. results)? Or else, approximate additional cost estimate for R&D and production. (Back-end and front-end electronics)  CSC:  Need backup plan in case trigger group decides 10  s not enough latency  GEM:  ME0 need to decide on baseline segmentation, “stack”  What else? 4

General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal” 5

DT minicrate  Common plans: typically late-2014 to 2017  Detector and electronics radiation tests at GIF++ (all three subdetectors plan tests with source and beam)  Neutron and/or proton beams for electronics single event upsets  DT specific plans:  Replacement of the minicrates and upstream electronics, design  CSC specific plans:  CFEB rate capabilities at various latencies – verify expectations with data  RPC specific plans:  R&D on freon-less gas mixtures (LHC- and CERN-wide project) includes tests at GIF++ RPC chambers for GIF test 6

General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  GEM detectors (proposed for GE1/1, GE2/1, and ME 0  Chambers: well-advanced in context of GE1/1  5 th generation prototypes, assembly techniques optimized  GE2/1 very similar to GE1/1 but 2x larger, ME0 similar but more layers to cope with high-  rates; further industrialization, QC, and other studies ongoing  Front-end electronics: VFAT3 needed for CMS and under design  Back-end, DAQ, and trigger electronics R&D: under development for 40 o GE1/1 slice test installed in YETS 2016  Improved RPC detectors  Glass: 6 chambers to be tested at GIF++  High rate capability and time resolution to be studied  Bakelite:  Lower resistivity, new FE electronics for lower HV, gain being developed (CMS-ATLAS-ALICE) during  Muon Fast Track Tag (MTT) for barrel  Fast scintillator tiles read out with SiPMs and combined with DT/RPC in L1 trigger  Study ghost suppression, efficiency and timing in HO , develop prototypes GE1/1 slice test YETS 2016 VFAT3 New RPC electronics 7

General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Geometry of new detectors mostly complete:  Have all new detectors implemented  ME 0 geometry will need refinement  Reconstruction implementation:  Rechits in all new detectors  Local reconstruction in all detectors  Global reconstruction in GE1/1 and GE2/1  Additional capabilities under development  Effect on trigger and muon ID:  Studies well advanced for GE1/1 (e.g. lower right plot)  Preliminary studies for other stations, e.g. ME 0 motivation for high-  muon tagging  Background rate estimation:  Existing detectors: comparisons of measured versus originally foreseen rates:  For 1/1, 2/1, 3/1, and 4/1 will allow straightforward estimation (only variable is sensitivity of detectors)  Ongoing studies: various complicating effects such as neutron leaks (CSC station 2), TOTEM, CASTOR  For ME 0, optimization of shielding etc. needed  Depends on calorimeter detailed configuration ECFA 2013 GE1/1 GE2/1 ME 0 GEM-CSC trigger combination 8