Analyse Assure Accelerate TM U-ATS UMTS Automatic Test System Roadmap (April, 2005) Rev Draft 01.

Slides:



Advertisements
Similar presentations
Introduction of SCST B-20Ah Laminate Lithium-ion Battery
Advertisements

The following 10 questions test your knowledge of client site assignment in Configuration Manager Configuration Manager 2007 Client Site Assignment.
The following 10 questions test your knowledge of desired configuration management in Configuration Manager Configuration Manager Desired Configuration.
2008 Issue 4 NOTE: All material in this document is the confidential property of Infortrend Technology, Inc. Permission to use this publication is granted.
Direct Energy Screenshots December 28, 2009 Confidential and Proprietary Copyright © 2009 OpenPeak Inc.
© 2014 Microsoft Corporation. All rights reserved.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
R&R Consulting Approach
ATEC Wireless LLC Proprietary and Confidential Copyright © All Rights Reserved.
SDL Proprietary and Confidential Manager th June 2013 Ashley Mandell-Lynn Director, Global Production Services Martin Radford Business Solutions.
Copyright ©2013 The Nielsen Company. Confidential and proprietary. 1 Consumer Confidence Survey – Q3 – 2014 Field Dates: August 13 – September 5, 2014.
New Features ANSYS 9.0 CFX-Mesh 9.0/CFX (CFX in WB) ICEM CFD 5.1/AI*Environment Workshops 9.0 New Features.
Analyze Assure Accelerate TM Spirent Communications Overview.
Analyze Assure Accelerate TM Spirent Communications Vodafone UK UE Performance Test Readout 15 April 2005.
1 Jon Sudduth Project Engineer, Intelligent Grid Deployment SWEDE April 26, 2011.
Conditions and Terms of Use
Analyse Assure Accelerate TM Ancillary System Tests: Battery Test Cases Rev 1.0.
Material in this presentation may be subject to NDA and/or the confidentiality clause in your MSPP Agreement.
TG7 – Business models and SLAs BEinGRID - Legal Issues ICRI – K.U. Leuven Davide M. Parrilli
Analyse Assure Accelerate TM Testing WCDMA mobiles under real-life network conditions Rev 2.12.
Madison Elementary School District Class B Bond Capacity Update May 2013.
Analyse Assure Accelerate TM UMTS UE Test Solutions Rev 3.0.
Business and Systems Aligned. Business Empowered. TM Federal Identity Management Handbook May 5, 2005.
New Features 5.7 Training Manual. Inventory Number: Version: 1 ANSYS Release: 5.7 Published Date: August 15, 2000 Registered Trademarks: ANSYS.
WCDMA Market Segment Review Chris Ackermann Salim Manji.
Analyze Assure Accelerate TM HSDPA Roadmap. Analyze Assure Accelerate TM SR3420 WCDMA Network Emulator SR3420 is a new WCDMA network emulator platform.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage Supplier Returns.
New Features 5.7 Workshop Supplement. Inventory Number: Version: 2 ANSYS Release: 5.7 Published Date: September 15, 2000 Registered Trademarks:
Friends and Partners of Aviation Weather, Fall 2015, Las Vegas, NV Determining Runway Conditions in Real Time Using Data Obtained from Airplanes during.
Analyze Assure Accelerate TM MIMO (multiple-input multiple-output) with Spirent’s SR5500 Wireless Channel Emulator Rev 1.00.
Doc.: IEEE xxxxr0 Submission May 2008 Chang-Joo Kim, ETRISlide 1 [ TPC Equation ] IEEE P Wireless RANs Date: Authors: Notice:
Doc: IEEE /0102r0 Submission March 2008 Slide 1 HuaweiLiu Jinnan Huawei Hisi Optimization of Channel Distribution Authors: Notice: This document.
ANSYS Workbench - Simulation Introduction
Document Title Author Affiliation. Release/Patent P&P Release: The contributor acknowledges and accepts that this contribution is subject to the IEEE.
SDL Proprietary and Confidential SDL Community Enhancing Customer Experience October 2015.
Copyright © 2012, Oracle and/or its affiliates. All rights reserved. Oracle Proprietary and Confidential. 1.
ANSYS Workbench – Design Simulation Introduction
ANSYS Meshing Application Introduction
Connectivity to bank and sample account structure
Using Parallelspace TEAM Models to Design and Create Custom Profiles
ECE362 Principles of Design
Use of KCK for TGr Management Frame Protection
Parallelspace PowerPoint Template for ArchiMate® 2.1 version 2.0
Automation in an XML Authoring Environment
In the name of God.
Additive & Subtractive Solid Modeling
Transmit Power Requirements
Nokia Speakerphone HF-300 Compatibility
حمایت از اسرار تجاری در فضای مجازی
ONAP Information Model Topics Timeline
March 2005 doc.: IEEE a March 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Solanco School District
Geo units Formation Dates In New Zealand
FCC Regulations and Multi-band Operation
TGp Closing Report Date: Authors: March 2006 Month Year
Decision on SG Formation
TGp Closing Report Date: Authors: March 2006 Month Year
Motivation for 36OU Open Rack
Submission Title: Validation and Verification Task Force Proposal
Decision on SG Formation
The 5 “Easy” Steps Process 4/9/2019 4:03 AM
Tutorial Introduction Section
Properties of Rational Functions
U.S. Army Technology Transfer Mechanisms
Questions to the Contention-based Protocol (CBP) Study Group
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [LECIM Coexistence Considerations] Date Submitted:
Recommended Principles for y
DFS Regulatory Update Date: Authors: May 2005 May 2005
Use of KCK for TGr Management Frame Protection
Presentation transcript:

Analyse Assure Accelerate TM U-ATS UMTS Automatic Test System Roadmap (April, 2005) Rev Draft 01

Analyse Assure Accelerate TM The information contained in this presentation is considered to be confidential and proprietary information of Spirent Communications Inc. and is subject to the terms and conditions of the Non- disclosure agreement (NDA) between the recipient(s) or recipient's organization and Spirent Communications Inc. Notice of Confidential Information

Analyse Assure Accelerate TM High-level U-ATS Roadmap* 2005 Q1 Q2 Q3 Q4 December 2005  HSDPA: Initial test cases from Section 9 - (2)  TX Diversity: Open Loop Transmit Diversity (including validated test case)  TX Diversity: Closed-Loop Transmit Diversity (including validated test case)  OB V test validation (subject to UE availability) April 2005 (U-ATS 3.1)  Support for asymmetric data rate testing as per real-world deployments  Operating Band V and VI support for Development Partners  RRM: GSM Cell Selection Test Cases (including validated , test cases)  RRM: Measurement Accuracy Test Cases (including validated , , , test cases)  OB I and II validation of new tests (per April 2005 roadmap) August 2005  RRM: GSM Hard Handover Test Cases (including validated test case)  RRM: GSM Cell Re-Selection (including validated test case)  RRM: GSM Measurement Accuracy (including validated test case)  Power Control: Combining of Power Control (TPC) streams (including validation of test)  Enhanced Energy Management tests  OB I and II validation of new tests (per Aug 2005 roadmap) * Target availability – dates and contents subject to change

Analyse Assure Accelerate TM All trademarks mentioned herein are the property of their respective owners Copyright © 2004 Spirent Communications Inc. Analyse |Assure |Accelerate ™