Improving Primary Frequency Response Bob Green PDCWG August 3, 2011.

Slides:



Advertisements
Similar presentations
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Advertisements

Don Blackburn Vice Chair
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Bob Green Garland Power and Light
TPTF Presentation Registration of PUN Facilities December 19, 2007.
Active Power and Frequency Control
PRESENTATION FREQUENCY CONTROL
NERC LTRA Update / CDR Capacity Counting Issues
Joint Grid Code Review Panel POR Working Group Meeting 2 27 th March 2015 Chairperson : Michael Preston.
Governor Response Sequence Bob Green Garland Power and Light ERCOT Future AS Workshop January 20, 2014.
Frequency Control Turbine Governor Droop NERC Requirement
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
RTWG Report to TAC August 5, 2010 Howard Daniels.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
Comparison of Governor Deadband & Droop Settings of a Single 600 MW Unit A Hz Deadband with a Straight Line Proportional 5% Droop Curve Compared.
Effect of generation loss and Frequency Response Characteristics (FRC) on tie-line flow to Southern Region under various scenarios and Target setting for.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Frequency Response Standard. ERCOT Governor Droop.
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
August 2012 QMWG DAM Clearing Behavior for Fixed Quantity Blocks Carrie Tucker Supervisor, Day-Ahead Market.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
NPRRs NPRR 681 Clarifications to Dynamic Ratings. This Nodal Protocol Revision Request (NPRR) adds clarification for Dynamic Ratings provided via ICCP.
Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, ROS Action Plan Item 1e.
Page 1 Slides for FR Technical Conference Office of Electric Reliability September 2010.
Optimizing Deployment of CCGT Duct Firing Capacity in the Nodal Market Josh Clevenger Brazos Electric Cooperative.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
October Project Release (NPRRs 710, 706, 698 and 595) ERCOT Operations & Market Operations WebEx Training October XX, 2015.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
Operations Report Kent Saathoff System Operations ERCOT.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Distributed Generation Registration June 30, 2008.
GENERAL BACKGROUND AND SPEED GOVERNORS
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
Responsive Reserve Service Deliverability Review September 15,
SGR issues associated with ICCP. 2 ICCP handbook update Split Generation Resources Split Generation Resources are modeled separately by each.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
1 Frequency Control Task Force Report to WMS July 19 th, 2006.
BAL-001-TRE-1 CPS2 Waiver FERC-Ordered Modification to ERCOT waiver CPS2 Report to RSC December 16, 2008.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Generation Adequacy Task Force Meeting April 10, 2014.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
7. FREQUENCY CONTROL AND REGULATING RESERVES
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
Black Start Overview.
Ancillary Service Trades and Ancillary Service Settlement
PDCWG David Kee, Chair Sydney Niemeyer, Vice Chair
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Lesson 22: Active Power Division Between Alternators
Presentation transcript:

Improving Primary Frequency Response Bob Green PDCWG August 3, 2011

Improvement Overview Ensure that there is adequate capacity available for frequency response Enhance compliance enforcement for significant events Add protocol requirements for sustained response Hold more joint workshops for QSE and Production staff

Adequate Capacity One issue is that larger resources normally have the largest MW/0.1HZ rate of governor response [given that all resources have the same droop %], but the larger units are usually the most cost efficient and are fully loaded [no governor response capacity]. For any market product to be developed that would reserve distributed capacity for governor response to a unit trip, we need to model frequency versus available capacity.

B Point Frequency vs Generation

Governor Response Model

Frequency Response Model Data

Compliance Enforcement Great progress is being made regarding the definition and enforcement of adequate primary governor performance. Droop is hard to measure if the resource if the capacity is limited; therefore, adequate reserve must be factored into the measurement. We might need two tiers of enforcement. For instance, a 600 MW trip might result in warnings and fines issued for a 1,000 MW trip.

NPRR for Sustained Response The PDCWG has been using the response terms that follow for many years, but these key parameters are not in the Protocols or Operating Guides. ERCOT might need a requirement for sustained response more than larger interconnections. Steam supply might not be sustainable after aggressive governor response, but the frequency bias must be applied to plant set points.

Governor Response Terms

Response Term Specifications

QSE/Production Joint Workshops ERCOT engineering market participants are predominately electrical engineers [TSP and QSE representatives]. ERCOT will have better primary frequency response if market participant mechanical engineers [Production representatives] are fully engaged in resolving issues leading to poor B point recovery. ERCOT should sponsor annual workshops.

Demo of Governor Model Governor Model starts with 3 units serving 360 MW of load at HZ. A 35 MW disturbance is simulated by changing load to 395 MW. B point= HZ Simulate response with Unit #3 HSL=172 MW by adding 21 MW and then 14 MW of load. Unit #3 reaches HZ Restore 60 HZ by adding 21 MW to Setpt(MW) Add 14 MW; with Units #1 and #2 responding, observe frequency B point= HZ.

Governor Response Model

Demo of Governor Curve Prototype Key Governor Model parameters are transferred to the Governor Curve Prototype. Observe Frequency at HSL for each unit and copy them into the Sort Freq field below. The frequency vs generation curve will be linear with break points at the Sort Freq values. Sort the Freq values in decending order and calculate total generation for each freq brk pt. Enter New Gen for each section of the curve. Observe New Freq calculated for each New Gen.

Frequency Response Model Data

B Point Frequency vs Generation

Possible Next Steps Expand the EXCEL model with a subset of ERCOT data. Work with a graduate student to create a study program that could handle the complete ERCOT system. If results could be informative in real-time, investigate an on-line application. Could be used for training of operations staff. Might be used in the development of a market product for governor response to a unit trip.