1 Sasha Milov HBD meeting Oct 24, 2006 LAMP SUNYSB Craig, Matt & Sasha Oct 24, 2006.

Slides:



Advertisements
Similar presentations
CricketSat Assembly.
Advertisements

Activities During 4/11/07 IR Access HBD Working Group Meeting 4/17/07 B.Azmoun, T.Hemmick, J.Kamin, S.Stoll, C.Woody Brookhaven National Lab / SUNY SB.
Basic Circuits TEST YOUR BRAIN!.
Engineers in Training Day 2 Developed by Shodor and Michael Woody.
By Jacob Ritz Kelly Clark Zach Beckman. Setup Box of magnets Detector D Detector B Detector A Magnetic field ~0.42 mT.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
Computers. s Use inputs to control outputs Inputs s Most are from sensors s Will usually be either an analog or digital voltage s Most will supply an.
TRANSFORMERS. TRANSFORMER PARAMETERS Turns Ratio (n) It is defined as the ratio of the number of turns in the secondary winding (N sec ) to the number.
ECE Way Switch Design Changing the position of either switch will change the state of the lamp. Applications might include hallways, staircases,
Sample servo diagrams and Bode plots. Acousto optic performance plots Unlock servo Measure gain and phase vs drive input K.
The States of Matter. Solids, Liquids, and Gases  Your world is full of substances that can be classified as solids, liquids, or gases!  To define solids,
CricketSat Construction. Parts List Monday June14, 2013CricketSat Assembly2.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
GBT Spectral Baselines – Tuesday, 11 March 2003 GBT Spectral Baseline Investigation Rick Fisher, Roger Norrod, Dana Balser (G. Watts, M. Stennes)
Sensors. This is a set of transmitter and receiver in one of the photoelectric sensor. Detection distance can be adjusted according to the requirements.
HBD Meeting 3/14/06 B. Azmoun BNL Testing and Preparation of HBD Full Scale Prototype for Upcoming Engineering Run Puzzling Behavior of GEM’s To Do List.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Sasha Milov HBD upgarde Feb 8, Assembly and testing facility. Sasha Milov Feb 8, 2005 Glove Box Other needs Testing.
Name: ________________ Class: _________________ Index: ________________ D.C. Circuit.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
#3191, 14 Oct 2012 Cabling installed to allow fast BPM electronics on injector BPMs System is flexible enough to allow different INJ-BPMs to be used (not.
Graphic Equalizer Table Top View
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
1 Sasha Milov HBD internal... July 10, 2007 New divider floating vs. grounded Sasha Milov July 10, 2007.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
Report on PISA progress ~Small Addendum~ Takao Sakaguchi.
Velleman Oscilloscope: Windows 7 by Mr. David Fritz.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
GEM tests at BNL Zvi, Sasha, Ilia and others. Triple GEM detector tests Last Tuesday after HBD meeting we exchanged CF4 by Ar/CO2 but still there were.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
Click here to begin!. “State” your knowledge Solids Liquids Gases Find your results!
HBD HV Control and Monitoring System RESISTORS, CALIBRATION & CO. Manuel Proissl HBD Meeting 12/23/2008.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Series and Parallel Circuits. Series Circuits ► Are the simplest type of circuits. ► Series circuits – all the components (lamps, cells, switches, etc.)
Series and parallel resistances pg. 51. Objectives Calculate the equivalent resistance for resistors connected in both series and parallel combinations.
HBD Transmission Monitor Update III: Noise Analysis B. Azmoun & S. Stoll BNL HBD Working Group Meeting 10/10/06.
PMT test device setup functionality –reproducibility of output signal –dynamic range –limitations –test duration conclusion T. Wälchli, TT-Meeting Brussels,
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
P HOTON Y IELD DUE TO S CINTILLATION IN CF4 Bob Azmoun, Craig Woody ( BNL ) Nikolai Smirnov ( Yale University )
Electronics Merit Badge Class 1 6/6/20161Electronics Merit Badge Class 1.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Checks of TOF Fiducial Cuts
Voltage Divider.
Bruck CLASSIC / GLOW . VIA ch Description
Magnetism and electromagnetism
Occhio Divo letto Divo letto B CDM Description - Luminaire type
TOF Fiducial Cut on 325 +/- 25 MeV/c (++ Field)
Bruck CALO / KROKO 90 SPOT 120 VIA 180° mcgy Description
DELTALIGHT NYX B B Description
Electricity and Circuits
3-Way Switch Design Changing the position of either switch will change the state of the lamp. Applications might include hallways, staircases, or rooms.
SHOU / KANE DOWN PNT - White
Bruck APOLLOS / SPOT 90° mcgy Description
Bruck CLASSIC / GLOW 145 VIA mcgy Description
Nimbus MODUL Q 49 SURFACE Description
DELTALIGHT NEBEL Description
Voltage Divider.
Presentation transcript:

1 Sasha Milov HBD meeting Oct 24, 2006 LAMP SUNYSB Craig, Matt & Sasha Oct 24, 2006

2 Sasha Milov HBD meeting Oct 24, 2006Set-up HV in To 1MOhm scope via coax-cable (cable has to be fixed) 24V V ref 2-7V Trigger Gas in HBD

3 Sasha Milov HBD meeting Oct 24, 2006  Parameters, which do not matter: PS voltage within a Volt Trigger voltage within 2-5 Volts Trigger frequency within 5-50 Hz Trigger duration from us to ms Time after Mesh  GEM voltage is on  Parameters which do matter: Lamp reference voltage Transparent gas flow in the lamp housing Cable to the scope (1MOhm input) Mesh  GEM Voltage Time after lamp turn on if less then 10min Lamp orientation on the HBD  Parameters which might still matter Room temperature Different gas in the lamp housing What did we looked at.

4 Sasha Milov HBD meeting Oct 24, 2006 Sets of measurements.  Two sets on 17 & 18 In each one can look at: Bottom vs Top North vs South Sector by sector are just geometry. fishy…

5 Sasha Milov HBD meeting Oct 24, 2006 As in PHENIX: Red: SouthBlue: North Circle: Oct. 17Square: Oct. 18 Open: at topClosed: at the bottom Counting sector from lamp Shape is just an amount of light received by a sector. Not a bad reproducibility. Two fishy measurements are perhaps a human factor Sector by sector

6 Sasha Milov HBD meeting Oct 24, 2006 Looking at the ratios Same results 1 day apart: 21% wide all points together 4.6% wide if 3 faulty measurements are neglected. Similar results in neighboring sectors: Circle: Oct. 17Square: Oct. 18 Open: at topClosed: at the bottom Simplest explanation: lamp orientation matters.

7 Sasha Milov HBD meeting Oct 24, 2006  Do test in situ is not going to be easy: Probably only one lamp position (bottom) Might be not trivial to hook-up jumpers and cables on top use man-lift? Needs to be done a.s.a.p. and then before and after gas switch Monday was survey day. Same cable, PS, etc… not a problem. To do.