OILGEAR PVV PUMPS PVV 200 Performance Curves.

Slides:



Advertisements
Similar presentations
Unit Seven: Pumps and Compressors
Advertisements

Chapter 4 Air-Conditioning Components
Basic Refrigeration Cycle
Fluid Power Symbols.
STEAM TRAPS.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
Hydraulic Valve, Pump, Motors
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Simple Pressure Control Valves
1 Oil Fuel Line De-aerators What they are, what they do and how to install.
Reservoirs Covered in Ch. 5 of Vickers Text
HVACR 317 – Refrigeration Core
Hydraulics.
Proper Pump Installation Practices
Valves and Appurtenances
What is going on inside a packed stuffing box?
Experts in Chem-Feed and Water Treatment General Hydraulics Fluid Mechanics.
COMPRESSOR BASICS.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Hydronic Mechanical Controls
Reciprocating Compressor
Hydraulics For The Long Term
Muhajir Ab. Rahim School of Mechatronic Engineering
1 Fuel Pumps. 2 Pumps 1.All oil burners for residential heating have pumps A. They are connected to a motor through a coupling 2.Description A. An oil.
Oilgear Pump Controls PVWJ, PVG, and PVV.
Water piping design.
Plan 2 – Dead-end Seal Chamber Optional Jacket
Dr. subhash technical campus
SIZING PNEUMATIC SYSTEMS. Introduction Pneumatic systems are sized to meet output power requirements. The air distribution system is sized to carry the.
Ships Service Air System
Introduction to Oilgear Pumps
1 ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 6 : PUMPS.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
PVWC Hydrostatic Pumps. PVWC Hydrostatic Pump Features Control Selection –Mechanical Pintle w/o neutral by-pass (M-N)
PVG PUMPS. PVG Pumps Currently 5 Displacements – 048 ml/rev (2.93 in ³) – 065 ml/rev (3.94 in³) – 075 ml/rev (4.60 in ³ ) – 100 ml/rev (6.00 in ³ ) –
PVK Pumps. PVK Pump Features Controls are Easily Field Convertible. –By using pilot control modules (PCM’s) for various control functions.
PVWC Hydrostatic Pumps. PVWC Hydrostatic Pump Features Control Selection –Mechanical Pintle w/o neutral by-pass (M-N)
PVWH Pump Presentation. PVWH Pumps n 10 Displacements –. 66 in³/rev –.86 in³/rev –1.35 in³/rev –1.55 in³/rev –2.06 in³/rev –2,83 in³/rev –3,88 in³/rev.
Hydraulic Pressure Control
Force Feed Lubricator System
Air Compressors Capacity Horsepower Pressure Duty Cycle.
Hydraulic System Components
MOTORS PUMPS GEARBOXES VALVES CONTROLS NAHI, LLC - MAIN OFFICE : PROVIDING CUSTOMER DRIVEN SOLUTIONS - Open Loop Pumps Made in USA Models.
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
EMERGING TECHNOLOGIES AVAILABLE TO REDUCE COMPRESSED AIR DEMAND Double Acting Air Cylinder Double Acting Air Cylinder Air Operated Diaphragm Pumps Air.
Lesson 7 Steam Power Plant.
Automotive Engines Theory and Servicing
Engine Lubrication Systems
HYDRAULIC & PNEUMATIC CIRCUITS
COMPRESSOR BASICS.
Troubleshooting Hydraulic Pumps
Basic principles of hydraulic symbols
Oilgear Specific Controls Training
Outcome 4 Mechanical central heating controls Unit 208: Central heating systems.
1 Mobile Air Conditioning Basic A/C Operation. 2 System Components All systems contain six major components: Compressor to circulate the refrigerant Condenser.
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
SB Packing Automatic Downpuller Power Unit
Trouble Shooting Hydraulic System Failure
FAILURE ANALYSIS A Guide to Analyzing Axial Piston Pump Failures
Hydraulic Pressure Control
Game Tutorial, How it works
Game Tutorial, How it works
COMPRESSOR BASICS.
Automotive Engines Theory and Servicing
Hydraulic Flow Control • Metering Fluid Flow
Presentation transcript:

OILGEAR PVV PUMPS

PVV 200 Performance Curves

PVV 200 Noise Curves

PVV 200 Inlet Curves

PVV 250 Performance Curves

PVV 250 Inlet Curves

Front HousingControl Cover Main Housing Rear Cover Front Housing Control Cylinder Middle Housing Cylinder Wear Plate Port Plate Rear Housing Retainer Driveshaft & Bearing Assembly Control Pistons Swashblock & Wear Plate Hydrodynamic Bearing Cylinder Barrel

Inboard Shaft SealSwashblock Pivot Pins Saddle Bearings Auxiliary Case Drain Rotating Group Bearing

Hardened Steel Cylinder Wear Plate

CounterclockwiseClockwise PVV 200/250 Port Plates Compression Slots De-compression Orifices

Driveshaft & Bearing Assembly Driveshaft Retainer Shaft Seal Retainer

Saddle Bearings Middle Housing Valve Plate Front Housing Control Mounting Surface Piston & Shoe Assemblies, Harness Plate, and Shoe Retainer

Piston & Shoe Assemblies Shoe Retainer Swashblock Wear Plate Anti Rotation Pin

P-1NN Control Circuit

P-1NN Control Diagram

P-1NN Control Diagram Compensated

The Do’s Double check electric motor for proper shaft rotation.

The Do’s Double check electric motor for proper shaft rotation. Fill the pump case prior to start-up.

The Do’s Double check electric motor for proper shaft rotation. Fill the pump case prior to start-up. Be sure the inlet line is a minimum of 1-2 pipe diameters off the bottom of the reservoir and unrestricted.

The Do’s Double check electric motor for proper shaft rotation. Fill the pump case prior to start-up. Be sure the inlet line is a minimum of 1-2 pipe diameters off the bottom of the reservoir and unrestricted. Arrange case drain line, so the pump case remains full of fluid.

More Do’s Case drain lines should be:

More Do’s Case drain lines should be: a. Full sized

More Do’s Case drain lines should be: a. Full sized b. Separate

More Do’s Case drain lines should be: a. Full sized b. Separate c. Unrestricted

More Do’s Case drain lines should be: a. Full sized b. Separate c. Unrestricted 1. No heat exchangers

More Do’s Case drain lines should be: a. Full sized b. Separate c. Unrestricted 1. No heat exchangers 2. No filters

More Do’s Case drain lines should be: a. Full sized b. Separate c. Unrestricted 1. No heat exchangers 2. No filters 3. No flow meters

More Do’s Case drain lines should be: a. Full sized b. Separate c. Unrestricted 1. No heat exchangers 2. No filters 3. No flow meters d. Terminate below the fluid level in the reservoir

Vertically Mounted Pumps Case drain line should be higher than the highest point of the pump.

Vertically Mounted Pumps Case drain line should be higher than the highest point of the pump. We recommend that a purge tube be installed to allow trapped air in the pump case to escape. This tube should be plumbed below fluid level to prevent a vacuum break.

More Do’s Ensure proper fluid viscosity.

More Do’s Ensure proper fluid viscosity. a. Minimum fluid viscosity for PVV pumps is 80 SSU.

More Do’s Ensure proper fluid viscosity. a. Minimum fluid viscosity for PVV pumps is 80 SSU b. Maximum fluid viscosity is 2000 SSU

More Do’s Ensure proper fluid temperature

More Do’s Ensure proper fluid temperature a. Minimum operating temperature for PVV pumps is -20°F

More Do’s Ensure proper fluid temperature a. Minimum operating temperature for PVV pumps is -20°F b. Maximum operating temperature is 160 ° F

More Do’s Ensure proper fluid temperature a. Minimum operating temperature for PVV pumps is -20°F b. Maximum operating temperature is 160 ° F c. Maximum case drain operating temperature 210 ° F

Don’ts Do not restrict inlet lines.

Don’ts Do not restrict inlet lines. a. No inlet filters or strainers.

Don’ts Do not restrict inlet lines. a. No inlet filters or strainers. b. Full sized

Don’ts Do not restrict inlet lines. a. No inlet filters or strainers. b. Full sized c. Separate

More Do’s Do not restrict inlet lines. a. No inlet filters or strainers. b. Full sized c. Separate 1. On multiple pump systems, inlet lines should be a minimum of 8 pipe diameters apart. This helps prevent cavitation caused by flow vortexes.

WARNING Do not operate the pump at neutral or low pressure (less than 200 psi) for long periods of time unless the unit is supercharged, or is equipped with a case flushing circuit.

Filtration Oilgear recommends the use of a 10µ filter with a ß 10 ratio of 4 or better.

Filtration Oilgear recommends the use of a 10µ filter with a ß 10 ratio of 4 or better. PVV’s have an allowable ISO rating of 18/15. Pressure Filter or

Filtration Oilgear recommends the use of a 10µ filter with a ß 10 ratio of 4 or better. Pressure Filter or Return Line or

Filtration Oilgear recommends the use of a 10µ filter with a ß 10 ratio of 4 or better. Pressure Filter or Return Line or Off Loop (kidney loop) Filtration System

Filtration Off line filtration is more efficient than in line or pressure filtration. a. maintains a constant flow across the filter element, which increases filter efficiency.

Filtration Off line filtration is more efficient than in line or pressure filtration. a. maintains a constant flow across the filter element, which increases filter efficiency. b. allows for the capability of adding a heat exchanger, to help maintain a constant system temperature.

Start-up Loosen a pressure connection or use an automatic air bleed valve.

Start-up Loosen a pressure connection or use an automatic air bleed valve. Back off the relief valve setting.

Start-up Loosen a pressure connection or use an automatic air bleed valve. Back off the relief valve setting. Vent the remote compensator relief valve.

Start-up Loosen a pressure connection or use an automatic air bleed valve. Back off the relief valve setting. Vent the remote compensator relief valve. Jog the electric motor several times, until oil is visible at the loosened pressure connection.

Axiom Axial Piston Pumps Make Lousy Air Compressors.

Start-up Tighten the loosened pressure connection.

Start-up Tighten the loosened pressure connection. Start the electric motor.

Start-up Tighten the loosened pressure connection. Start the electric motor. Let the unit run for a couple of minutes, to purge the air from the rotating group.

Start-up Tighten the loosened pressure connection. Start the electric motor. Let the unit run for a couple of minutes, to purge the air from the rotating group. Close the remote compensator vent.

Start-up Tighten the loosened pressure connection. Start the electric motor. Let the unit run for a couple of minutes, to purge the air from the rotating group. Close the remote compensator vent. Set the system relief valve 200 psi above the main pump compensator.

Start-up Set main pump compensator 200 psi above the maximum system pressure. This will allow the the pump to compensate, rather than blowing the system relief if the remote compensator fails closed.

Remote Pressure Comp Connection Case Drain C-Face Mount Set 200 PSI Above Max. System Pressure Maximum Volume Stop Case Purge Tube

Thank you for buying Oilgear Products The End