FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013
PROGRES PICTURES UPVC pipe installation
PROGRES PICTURES Construction of Inspection chamber on water pipeline
PROGRES PICTURES Admin Building 100% completed
PROGRES PICTURES Ground Tank 1-4 completed Elevated Tank completed
PROGRES PICTURES Ground Tanks completed with Concrete Ground Base
PROGRES PICTURES block work for the Gen House and generator platform completed.
PROGRES PICTURES 14 no of Filters on site
PROGRES PICTURES concrete blinding for aerator tank base, and floor slab of filtration treatment house
PROGRES PICTURES Cutting road for pipes and repairing of the surface
PROGRESS PICTURES Site General View
PROGRESS PICTURES Pipe and bends installation
PROGRES PICTURES Pipe, Sluice Valve Installation
PROGRESS PICTURES PRESSURE TEST BREAKING OF CONCRETE BEFORE LAYING OF PIPE WITHIN COMMUNITY
PROGRESS PICTURES Reinforcement and formwork for Emeyal booster station elevated tank Base