1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.

Slides:



Advertisements
Similar presentations
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Advertisements

Muons going through MICE should –Have ISIS proton timing structure –Generate TOF signals –Satisfy ISIS and TOF trigger requirements MICE tracker DAQ will.
17 Sep 2009Paul Dauncey1 US DHCAL integration with CALICE DAQ Paul Dauncey.
January 11, Data Format for MICE Trackers Tracker Data Readout Basics Preliminary Tracker Data Format and Suitability for VME Data Transfers. Questions.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Cryo and AFE IIt Update MICE Collaboration Meeting October 22, 2005 RAL A. Bross.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
9 Sep 2005DAQ - Paul Dauncey1 DAQ/Online Status Paul Dauncey Imperial College London.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 3 Report Jack Hickish.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
PSI - 11 Feb The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
MICE Phase 1 Koji Yoshimura KEK June
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Online Reconstruction 1M.Ellis - CM th October 2008.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
1 Level 1 Pre Processor and Interface L1PPI Guido Haefeli L1 Review 14. June 2002.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
January 17, MICE Tracker Firmware Dead Time and Muon Detection Studies for the MICE Tracker Tracker Data Readout Basics Progress in Increasing Fraction.
Ba A B B1 FADC B2 SD_FP FLEX_I/O ROC VME64x A: [ HELICITY, HELICITY_FLIP ] (NIM or ECL) Port 1 Port 2 a: [ HELICITY, HELICITY_FLIP ] (LVDS) B: [ HELICITY_TRIGGER,
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Amsterdam, Oct A. Cotta Ramusino, INFN Ferrara 1 EUDRB: status report and plans for interfacing to the IPHC’s M26 Summary: EUDRB developments.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference, August 20, 2007.
Tracker readout, DAQ, C&M and calibration
14-BIT Custom ADC Board Rev. B
Tracker TriP-t Test Stand
AFE II Status First board under test!!.
AFE IIt/VLSB Update Firmware Progress Hardware Progress AFE IIt VLSB
Hideyuki Sakamoto CM22, RAL 19/10/08
Muon Recording Studies and Progress for the MICE Tracker
Tracker Software Status
The CMS Tracking Readout and Front End Driver Testing
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE CM 18, June 13, 2007

2 MICE Tracker Acronyms AFE IIt – Analog Front End, Version II, with time VLSB – VME LVDS Serdes Buffer –Versa Module Eurocard –Low Voltage Differential Signalling –Serialing/Deserializing FPGA – Field Programmable Gate Array TriP-t – Trigger with Pipeline with time VLPC – Visible Light Photon Counter Terry Hart, MICE CM 18, June 13, 2007

3 Tracker Data Readout Basics DFPGA AFPGA ADC TriP-t 1/4 of AFE-IIt Data from VLPCs X 4 … 1/4 of VLSB Memory Bank Trigger and Pipeline chips - Sends bitmaps to DFPGA - Stores raw data in pipeline until receipt of MICE event trigger

4 Tracker Data Readout Basics DFPGA AFPGA ADC TriP-t 1/4 of AFE-IIt Data from VLPCs X 4 … 1/4 of VLSB Memory Bank Trigger and Pipeline chips - Sends bitmaps to DFPGA - Stores raw data in pipeline until receipt of MICE event trigger Event Trigger (L1ACCEPT) Analog FPGA Controls operation of TriP-t’s and ADCs.

5 Tracker Data Readout Basics DFPGA AFPGA ADC TriP-t 1/4 of AFE-IIt Data from VLPCs X 4 … 1/4 of VLSB Memory Bank Analog to Digital Converters Digitizes raw charge and time data Trigger and Pipeline chips - Sends bitmaps to DFPGA - Stores raw data in pipeline until receipt of MICE event trigger Event Trigger (L1ACCEPT) Analog FPGA Controls operation of TriP-t’s and ADCs.

6 Tracker Data Readout Basics DFPGA AFPGA ADC TriP-t 1/4 of AFE-IIt Data from VLPCs X 4 … 1/4 of VLSB Memory Bank Analog FPGA Controls operation of TriP-t’s and ADCs. Digital FPGA Sets data protocol for - Bitmaps to AFPGA - Data from AFPGA Analog to Digital Converters Digitizes raw charge and time data Trigger and Pipeline chips - Sends bitmaps to DFPGA - Stores raw data in pipeline until receipt of MICE event trigger Event Trigger (L1ACCEPT)

7 Tracker Data Readout Basics DFPGA AFPGA ADC TriP-t 1/4 of AFE-IIt Data from VLPCs X 4 … 1/4 of VLSB Memory Bank Analog to Digital Converters Digitizes raw charge and time data Formatted Data to VLSB Memory Banks Trigger and Pipeline chips - Sends bitmaps to DFPGA - Stores raw data in pipeline until receipt of MICE event trigger Digital FPGA Sets data protocol for - Bitmaps to AFPGA - Data from AFPGA Analog FPGA Controls TriP-t and ADC operation. Event Trigger (L1ACCEPT)

8 AFE IIt/TriP-t Basics For MICE, average time between triggers ~ 1700 ns, but can be as short as 628 ns. (ISIS beam structure and MICE DAQ constraints) TriP-t chips –Pipeline stores analog charge and time data. L1ACCEPT event trigger takes time (~ 1000 ns) to be formed. Time to digitize analog data ~ 1500 – 2000 ns. –Upon L1ACCEPT trigger, data is taken from pipeline and either Digitized if 4-level buffer is empty or Placed in 4-level buffer if digitization of previous event not yet done Terry Hart, MICE CM 18, June 13, 2007

9 D0 AFE IIt firmware doesn’t 1.Implement TriP-t 4-level analog buffer. 2.Run data pipeline while ADCs digitize data. TriP-t Modifications for MICE Firmware modified to do these, but hardware tests needed to ensure that TriP-t chips operate as expected. Terry Hart, MICE CM 18, June 13, 2007

10 Hardware Tests of Increasing Fraction of Recorded Muons Completed TriP-t test stand –DG2020 Signal Generator –2 Tektronix P3420 Variable Level Pods –Test board containing TriP-t chip Fed signals into TriP-t test board. First results: TriP-t seems to function with input zero suppression signal sequence. Next steps: - Check output signal integrity to see if input signals were digitized. - Check if buffering events works. [Reported at MICE Collaboration Meeting, Feb. 22, 2007]

11 Signal Inputs Program Interface Signals Pipeline Control Signals TriP-t Chip Preamplifier Signals

12 Channel Inputs 4 channels in gate #1 (1,15,16,31) 3 channels in gate #2 (1,15,31) 3 channels in gate #3 (15,16,31) 3 channels in gate #4 (1,16,31) Charges injected at four 324 ns intervals Data placed in 4-level buffer PR1 starts pipeline readout Analog outputs from pipeline are correct Digitization times - 4 channels => 2268 ns - 3 channels => 1620 ns µs1.620 µs µs1.620 µs 1 15, ,

13 TriP-t Hardware Test Summary Test stand has demonstrated that TriP-t can –Run pipeline while ADCs digitize raw data –Store data in 4-level analog pipeline for later readout Terry Hart, MICE CM 18, June 13, 2007

14 AFE IIt Firmware Modifications Modifications needed for data buffering –Shorten time to digitize data Zero suppression End digitization series after last channel above threshold These are done. –Protocol for data transfers between DFPGA and AFPGA Bitmaps from DFPGA to AFPGA Digitized data from AFPGA to DFPGA This is nearly done. –Buffer triggers in DFPGA FIFO This is nearly done. DFPGA AFPGA ADC TriP-t Data from VLPCs Memory Bank

15 Immediate AFE IIt Firmware Tasks Synthesize AFGPA and DFPGA firmware modifications. –FNAL concentrating of AFPGA –RAL concentrating on DFPGA Test operation of entire board. –Check that modified firmware is compatible with existing firmware. Terry Hart, MICE CM 18, June 13, 2007

16 VLSB Firmware VLSB = VME LVDS Serdes Buffer –Tracker data storage modules –Used for KEK test beam –Used by D0 for diagnostics Modifications for MICE –Event counter during spill Should be straightforward –Fast clear of VLSB memory Should be straightforward –Overwrite memory addresses when there’s null data so that data are stored in continuous memory blocks. Initial code formulated to be tested –Enable Direct Memory Access block transfers Done AFPGA controls ADC and TriP-t operation DFPGA directs DFPGA and AFPGA data flow VLSB memory banks storing charge and time data Done Terry Hart, MICE CM 18, June 13, 2007

17 Hardware Updates VLSB Boards –9 boards are built (to be spares), –15 more to be made. –Need 8 new production VLSB boards by August 1. AFE IIt boards/Cryostat –Data taken for 2 of 4 production cryostats –More details in Alan’s talk Terry Hart, MICE CM 18, June 13, 2007

18 Fallback for Tracker Readout DAQ goal: Keep up with 600 kHz trigger rate. At start of MICE in Aug./Sept., original firmware is sufficient for initial low data rate. With TriP-t zero-suppression, tracker can keep up with almost 300 kHz now. Late June/early July: target time for firmware capable of keeping pace with 600 kHz trigger rate. Terry Hart, MICE CM 18, June 13, 2007

19 No Buffering 1-level Buffering 2-level Buffering 3-level Buffering 4-level Buffering Where we are Recordable Muon Rate (kHz) Digitization Time (ns)

20 TriP-t/ADC Control Firmware Hardware tests DFPGA/AFPGA I/O Bus Board test at MHz Board test at 55 MHz Simulations at different frequencies Data transfer protocol AFPGA Firmware Write firmware controlling bitmap transfers Test pipeline/buffer operation Test mode development DFPGA Firmware Make 4-level trigger buffer Data format VLSB Firmware Event aggregation (VLSB) Data block transfer Fast clear of memory banks Suppress writing zeros to memory VLSB Board Manufacture (13 boards) AFE IIt Board Preparation Repairs for MICE Firmware and hardware modifications Board characterization in cryostats Ship cryos/boards to RAL Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Done Conservative simulations indicate this is marginal Conservative simulations this is marginal Done Standalone routine written Feedback loop testing previous version Should be quick Initial code written, needs to be tested Low to middle priority Follow up on existing MOU Ongoing

21 Summary TriP-t operation tested and verified to work AFE IIt firmware development to enable trigger buffering almost done. VLSB firmware development almost done. Terry Hart, MICE CM 18, June 13, 2007