1 LBT Q1 2008 Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Advertisements

LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
January 6. January 7 January 8 January 9 January 10.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
> >
Capítulo 10 Instalaciones básicas programadas Instalaciones eléctricas interiores.
Step 1: Right click, “My computer” select properties, Select Hardware >Device Manager > Other Device > USB Serial Converter, then Right Click and select.
ELECTRIC KILNS – JANUARY 2015 SundayMondayTuesdayWednesdayThursdayFridaySaturday Small 123 Large Small Large Small Large Small.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
LBT Q Engineering Review MCSC Mount Control System.
Topic1b: Project Life Cycle
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
Measurement and Verification of Refrigeration Measures in 4 Grocery Stores in Pacific County Presented to the Regional Technical Forum August 8 th, 2006.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
ACM-1231 / ACM-1431 Product Enhancement Notice. Introduction ACTi is not only releasing new models with better design and specifications, but also keep.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
Highlights ( ) PEAG Meeting, Suva, Fiji November, 2015.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
SunSatFriThursWedTuesMon January
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
NA62 CV activities Piero Valente 5 th September
LBT Q Engineering and Software Review ENGG Engineering General.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
Building Committee Presentation March 03, MAIN ENTRANCE.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
ACC 421 Intermediate Financial Accounting I To purchase this material link C-421/ACC-421-Complete-Class. For more courses.
ACC 421 Week 1 DQ 1 What are the major objectives of financial reporting? To purchase this material link 421/ACC-421-Week-1-DQ-1.
ABT-EC EYETS Activities 2nd reports
WP2: Preparation of Infrastructure WP3: DBBT Master Studies
February 12 – 19, 2018.
Job Oriented Courses after Electrical Engineering Job Oriented Courses after Electrical Engineering.
A 6 mm cable with a length of 15 m has been installed
Sustainable Inter-Regional Bike Tourism (SIBIT)
Errecting TMS-580 Control room CT /-PT Platform.
EDLC(Embedded system Development Life Cycle ).
OEM installation check with CAD models for ISL/QSL CC option for coolant lines for D phase release – CC9323 Date- 13th Feb 2017.
OEM installation check for ISL/QSL CC9293 for coolant lines reroute with quick disconnect Date- 16th Feb 2017.
Solar Energy Commercialization Utility Scale Solar Development
of Financial Performance for the F.Y
Rack and Interconnect Design in E-plan
Presentation transcript:

1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring

2 Highlights (Q1/2008) Level 4 power to support LBTI closed cycle cooler compressor is complete Level 4 power to support LBTI closed cycle cooler compressor is complete Power monitoring started 29 February and has continued through March Power monitoring started 29 February and has continued through March

3 Open Issues Technical Technical Need to identify power route to PEPSI container Need to identify power route to PEPSI container Need to define PF correction, if required Need to define PF correction, if required Schedule Schedule Scheduled for 2008 Scheduled for 2008 Financial Financial Will have to purchase cable, conduit and connectors Will have to purchase cable, conduit and connectors Resource Resource None None

4 Planning (Q2/2008) Install connection point power for PEPSI at bridge location Install connection point power for PEPSI at bridge location Continue monitoring power quality Continue monitoring power quality Install power for PEPSI container on 3L Install power for PEPSI container on 3L Determine course of action for PF correction Determine course of action for PF correction