EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.

Slides:



Advertisements
Similar presentations
The magnetic field uniformity and gradient of the B0 coils inside the lower cryostat for the nEDM experiment. S.Balascuta , dr. Ricardo Alarcon ASU Dr.
Advertisements

W. M. Snow Physics Department Indiana University/IUCF EDM collab meeting Monitoring the Cold Neutron Beam (During Experiment) What to measure (fluence.
SQUID NMR Measurements in nEDM experiment -- how to get a big signal & how to operate SQUIDs in High Voltage Environments Chen-Yu Liu.
Electric field calculation for the neutron EDM SNS experiment. Septimiu Balascuta Ricardo Alarcon ASU, 02/07/2008.
High voltage test system update Summary of 2005 results Results from March, May 2006 Possible remaining R&D projects Polished electrodes, clean(er) LHe.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
16th Crystal Ball Meeting October, 11-13, 2010, Dubrovnik Grigory Gurevich, Yuri Usov Dubna-Mainz Dilution Cryostat of the New Frozen-Spin Target.
DHB, nEDM Collab. Mtg, 15/16 Apr 04 UIUC Test System (Beck, Chandler, Hertzog, Kammel, Newman, Peng, Sharp, Williamson, Yoder; Blackburn, Kenyon, Thorsland)
NEDM Collaboration Meeting, May 25-26, He Relaxation Steve Williamson UIUC.
1 The 3 He Injection Test for the nEDM Experiment 10/2008 Xiaofeng Zhu D. Dutta, H. Gao, M. Busch, Q. Ye, T. Mestler, X. Qian, W. Zheng Duke University.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
EDM Magnetic Shielding (WBS 5) and Magnets (WBS 6) B. Filippone and B. Plaster Caltech Internal Cost and Schedule Review February 11, 2004.
HD target.
Background from the NIST test The pencil neutron beam (1 mm 2 ) with intensity about 7000 n/sec The beam was completely absorbed in the beam stop with.
1 Preparation for the 3 He Injection Test 11/2007 MIT/BATES D. Dutta*, H. Gao, M. Busch, Q. Ye, X. Qian, W. Zheng, X. Zhu ( Duke University) ASU, BU, Caltech,
P25 EDMEDM Seminar 4/27/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to P-25 Seminar Los Alamos, New Mexico April.
1 NEDM 4 He Purifier and Other Cryogenic Issues David G. Haase North Carolina State University Update on Cryovessel Engineering Evaporative Purification.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
The Four-Layer Conventional Magnetic Shield Brad Plaster, Caltech May 25, 2006  “Current” design  Estimated shielding factors  Production and time-scale.
HV-SQUID Compatibility Test Study the SQUID performance in a HV environment. Study the HV breakdown –in superfluid under pressure. –using different materials.
EDMEDM EDM Fast Start, May 23, 2006He3S, Steven Williamson EDM Fast Start Helium-3 Services (He3S) Steven Williamson May 23, 2006.
DOE 2/11/05 #1 EDM R&D Progress Steve Lamoreaux, Los Alamos Co-spokesperson for the EDM Project for presentation to The Department of Energy Cost & Schedule.
EDMEDM EDM Collaboration Meeting 3-06 Jan Boissevain, P-25 March 2, 2006 NCSU EDM Experiment Design Status.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
P25 Interface 5/19/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Subsystem Managers Duke University,
Plans for HV R&D at LANL Vacuum chamber Supply cryostat Josh Long, Indiana U. Tests in progress Control purity, contaminants, attempt T < 1.8 K Near Future.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain for Walter Sondheim, P-25, Los Alamos February 11, 2005, at Los Alamos National Laboratory Conventional.
Preparation for the 3He Injection Test
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Dielectric Strength of Superfluid Helium Under Pressure Small Pressure-Controlled Cryostat Overview Measurement Cycle Possible Breakdown Mechanisms Dielectric.
Study of T 1 relaxation time A proposal to test T 1 using a dilution fridge and SQUID NMA at Royal Hollow University,London.
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Conceptual Design of the Neutron Guide Holding Field Christopher Crawford, Yunchang Shin University of Kentucky nEDM Collaboration Meeting
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Summary of Valve Design Status for nEDM L. Bartoszek BARTOSZEK ENGINEERING 6/20/05.
NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
Engineering Approach EDM Collaboration Meeting 2-07 Jan Boissevain.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
EDM in ER2 at LANSCE Jan Boissevain LANSCE ER-2 Stake Holder Meeting
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
EDMEDM C&S Review 2/11/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to LANL Cost and Schedule Review Committee.
3 He R&D Plan at Los Alamos Takeyasu Ito Los Alamos National Laboratory EDM Collaboration Meeting May 26, 2006 Oak Ridge, TN.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
Magnetic Field and Magnetic Shielding R&D
HYSPEC IDT Options for polarization analysis with 3 He for the Hybrid Spectrometer (HYSPEC) L. Passell, V.J. Ghosh, I. Zaliznyak, S. Shapiro, W. Leonhardt,
Status of Engineering Preparations for CD2/3A nEDM Collaboration Meeting – MIT Bates Jan Boissevain November 2, 2007.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Electric field calculation for the neutron EDM SNS experiment. Septimiu Balascuta Ricardo Alarcon ASU, 02/07/2008.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
R&D Plan on Light Collection Takeyasu Ito Los Alamos National Laboratory.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Attempting to Cost Estimate the nEDM Upper Cryostat Larry Bartoszek, PE Bartoszek Engineering 12/2/04.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
NEDM Cost and Schedule Review, February 11, 2005 Upper Cryostat and Valves Cost and Schedule for WBS 3.2, 3.3, 3.4, and 8.2 L. M. Bartoszek D. H. Beck.
Office of Nuclear Physics R&D 12/14/06 #1 Risk Based R&D Plan Martin Cooper Los Alamos.
CLAS12 Longitudinally Polarized Target R&D Update CLAS Collaboration, October 20, 2015 Chris Keith.
Specifications for the Integrated Tests II Paul Huffman.
Final Design Cryogenic and mechanical configurations
CERN – Zanon discussions
Design of the Injection Can
Update on He3 Services design since the ORNL meeting
Cryoplant Installation Scope
Cryostat design Mechanical design: Thermal screens: Specifications:
as a prototype for Super c-tau factory
Presentation transcript:

EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference Design Engineering Constraints Reference Design Details Outstanding Issues

EDMEDM EDM Experiment Vertical Section View Dilution Refrigerator (DR: 1 of 2) Upper Cryostat Services Port DR LHe Volume 450 Liters 3 He Polarized Source He Purifier Assembly 3 He Injection Volume Central LHe Volume (300mK, ~1000 Liters) Re-entrant Insert for Neutron Guide Lower Cryostat Upper Cryostat 3He Injection Volume cosθ Magnet 5.6m 4 Layer μmetal Shield

EDMEDM EDM Experiment Horiz. Section View 3He Injection cosθ Magnet 6.4 m 2.5 m Central Helium Volume 4 Layer μMetal Shielding

EDMEDM EDM Experiment Horiz. Section View 2 Light Guide Measurement Cell Ground Electrode Electric Field Return HV Generator HV Electrode Support

EDMEDM Engineering Constraints Lower Cryostat – 300mK Helium Volume –Measurement Cell in 10mG (10 -3 Uniformity) No Superconductors inside lead shield (no Al <1K) No ferromagnetic materials (SS?) –High Electric Field: >25cm from HV Electrode –Neutron Activation: Minimize Hi Z Materials –UCN Friendly Materials –No Sparks SQUIDS Electrode thin coatings –Dressed Spin Magnets 2 magnets to minimize eddy currents in ferromagnetic shield Electrode Coating Important

EDMEDM Engineering Constraints 2 Upper Cryostat –He II film burner geometry –He Purification Technology Choice –Polarized 3 He friendly Injection Volume & Piping –Magnetic transition from 3He Polarized Source to Injection Volume –Magnetic transition from Injection Volume magnet to B0 magnet

EDMEDM Ferromagnetic Shield Nesting Inner Dressing Coil Outer Dressing Coil 50K Shield 4K Shield Superconducting Lead Shield Ferromagnetic Shield B0 cosθ Magnet

EDMEDM Ferromagnetic Shield Nesting 2 Inner Dressing Coil Outer Dressing Coil B0 cosθ Magnet Ferromagnetic Shield Superconducting Lead Shield Beam

EDMEDM HV Generator Actuation HV Electrode Support HV Probe HV Return He Safety Vent Port

EDMEDM Helium Purifier Thermal Standoff Activated Charcoal Pump (4K) Helium Purification Volume (0.4K) Pure Helium Staging Volume (0.4K) 3 He Injection Volume (0.4K) Tied to 50K Shield Tied to 4K Shield Super-fluid Film Burner

EDMEDM Central LHe Volume Mount Vacuum Can 50K Shield 4K Shield Central LHe Volume 4 Layer μMetal Shield Mount (1 of 4)

EDMEDM Central He Volume Mount 2 Vacuum Can 50K Shield Mount Point 4K Shield Mount Point Central Volume Mount Point 50K Shield 4K Shield

EDMEDM Upper/Lower Cryostat Interface Inner cosθ Dressing Coil Central Helium Volume 3 He Injection Region cosθ Coil DR 1 DR 2 Turbo Pump He Recirculation Bellows Actuators HV Generator Actuators 3He Injection Region He Safety Vent Helium Purifier Actuator Support

EDMEDM Upper/Lower Cryostat Interface 2 Helium Recirculation Bellows Measuring Cell Light Guide

EDMEDM EDM/Beam-line Interface Collimator Be Foil 4K Shield Be Foil 50K Shield Be/Teflon Multi- Foil Window at LHe/Vacuum Interface Measurement Cell

EDMEDM Upper Cryostat Installation Upper Cryostat Vacuum Can Removed, Heat Shield Side Panels Removed

EDMEDM EDM Experiment at SNS DR Pump Systems Fundamental Neutron Physics External Building 1000 Liter Dewar 3He Polarized Source Pump/Gas System Helium Liquefier Helium Liquefier Compressor

EDMEDM EDM Experiment at SNS 2 First Chopper Double Crystal Monochromator Bismuth Filter

EDMEDM Outstanding Engineering Issues Prototype Upper Cryostat R&D Project –He II Film Burners Reason for the 2 nd Dilution Refrigerator Important Geometry Issue – 3 He Injection –He Purifier Technology Choice Cosθ Magnets – Cal-Tech R&D Project –Check sensitivity to ferromagnetic materials –Check performance of ferromagnetic/superconducting lead shield –Compare to Ansys calculations Transition Magnets Valves