Setting Payment Amounts for Output from OPG’s Prescribed Generation Assets TransAlta’s Presentation to the Ontario Energy Board September 15, 2006 File.

Slides:



Advertisements
Similar presentations
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Advertisements

John H. Neate, Senior Associate, OCETA/ETV Canada, Canada Boosting Eco-technologies through Verification Expectations Parallel Sessions – Part I: Scope.
Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
The Single Electricity Market in Ireland
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Competition Effects of the Renewable Energy Policy Reform in Flanders: Is the Flemish market for Green Electricity Certificates working properly? Annemie.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
Setting Payment Amounts for Output from OPG’s Prescribed Generation Assets File number EB TransAlta th Ave SW, Calgary, AB T2P 2M1 Phone:
Offshore Transmission Giles Stevens Head of offshore electricity transmission.
REGULATORY AND INVESTMENT CHALLENGES IN HYBRID POWER MARKETS IN DEVELOPING COUNTRIES REGULATORY AND INVESTMENT CHALLENGES IN HYBRID POWER MARKETS IN DEVELOPING.
Comments on the OCE Solar Transition – Next Steps: Draft Staff Positions for Discussion Alfredo Z. Matos Vice President – Renewables & Energy Solutions.
COMPETITION POLICY AND ECONOMIC DEVELOPMENT PRESENTATION AT CUTS-ARC CAPACITY BUILDING WORKSHOP, LUSAKA 7 TH MARCH, 2011 BY SAJEEV NAIR, COMPETITION POLICY.
© World Energy Council 2013 World Energy Scenarios Impact of the Energy Governance Model to the Future of the European Energy Sector Einari Kisel 23 rd.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
AUSTRALIAN OFFICE OF FINANCIAL MANAGEMENT The Australian Government Bond Market Peter McCray Deputy Chief Executive Officer.
Recent Regulatory Developments in the gas market of the Energy Community Dr. Michael Thomadakis Vice President, RAE Chairman of the Gas Working Group,
The Convergence of Market Designs for Adequate Generating Capacity Peter Cramton and Steven Stoft 24 March 2006.
Bridging the Macro and the Micro: Integrating Empirical Realities with Scenario Analysis Elusiyan Eludoyin Doctoral Researcher UCL Energy Institute.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
HEALTH INSURANCE EXCHANGES: DESIGN ISSUES OREGON HEALTH POLICY BOARD DECEMBER 2009 Kramer Health Care Consulting.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Regulation of Ontario’s Energy Sector Toronto CFA Society Luncheon Presented by Howard Wetston, Q.C Chair Ontario Energy Board March 22, 2005.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
© 2014 Equity Administration Solutions, Inc. All rights reserved. 1 Four Fundamentals of Financial Reporting for Equity Compensation Kathy Biddle, CEP.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 9 Renewable Energy Module 9: REGULATORY MEASURES AND POLICY OPTIONS TO ENCOURAGE DEVELOPMENT.
SMART REGULATION FOR ENERGY SECTOR CHALLENGES. 2 Power Sector Challenges Decarbonisation Security of Supply Competitiveness Smart Regulation POWER SECTOR.
Energy Strategy and Renewables Cosmin Stăvaru, Partner13 May 2013.
Dr. Ion LUNGU AFEER President. DRIVERS FOR INVESTMENTS Demand; Fuel availability; Market signals; Production costs; Energy mix; Environmental concerns;
SETTING PAYMENT AMOUNTS FOR OPG’S PRESCRIBED ASSETS EB Michael Lyle, General Counsel ; fax
National Petroleum Council Study Balancing Natural Gas Policy: Fueling the Demands of a Growing Economy September 2003.
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
Reactive Power Federal Energy Regulatory Commission Open Meeting December 15, 2004.
Consumer Empowerment Consumer Empowerment May 15, 2012 Presented by: Alparslan Bayraktar Commissioner Energy Market Regulatory Authority of Turkey (EPDK)
Fiscal and other Policies to Leverage Private Sector Finance.
2014 Reports to the Minister Markets Team Ken Michael Room, 25 September 2014 Ensuring quality services for a reasonable price 1 Workshop.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Regulatory Institutions in Turkey. Regulatory Institutions Central Bank of Turkey Banking Supervision and Regulatory Institutions Capital Markets Board.
Structuring Electricity Markets Lester B. Lave Electricity Industry Center Carnegie Mellon University January 10, 2008.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
Successful Restructuring: The Way Forward Mark Bennett Senior Manager of Policy Electric Power Supply Association Restructuring and the Wholesale Market.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
EMIG Electricity Market Investment Group Setting Payments Amounts for Output from OPG’s Prescribed Generation Assets OEB (EB ) September 15, 2006.
The RPA Renewables Routemap RPA\Events\030520GlobePraseg 1 The RPA Renewables Routemap Philip Wolfe Jeremy Leggett David McDonald Renewable Power Association.
OBA to date: Lessons, Challenges and Mainstreaming Yogita Mumssen Infrastructure Economist Global Partnership on Output-Based Aid (GPOBA) Finance, Economics.
Draft 2 – Staff Discussion Paper “Regulatory Options for Setting Payments for the Output from OPG’s Prescribed Assets” Presentation to Interested Parties.
The Regulatory Assistance Projectrue de la Science 23 B Brussels Belgium Phone: web: “Energy-only markets” or “a.
THE 2005 CERT ENERGY ROUNDTABLE Ontario’s Electricity Sector: The Hybrid Model Takes Shape By: Ron Clark May 31, 2005.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
HEALTH FINANCING MOH - HPG JAHR UPDATE ON POLICIES Eleventh Party Congress -Increase state investment while simultaneously mobilizing social mobilization.
For Fairness and client protection in finance Oleg Ivaniychuk, Finance in Motion AMFA Investors Fair, Baku, 4 October 2011 Which role do investors play?
Payment amounts for prescribed assets Presentation to Ontario Energy Board September 15, 2006.
Illinois Wholesale Market Update December 10, 2003.
Department of Finance Private Sector Merger Briefing - 26 September 2013 Summary of major discussion points Merger Implementation Group Merger of Synergy.
Overview of Market Reforms and the WESM
1 Proposed Final Opinion on GHG Strategies in the Energy Sectors Key Findings and Recommendations October 16, 2008.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Setting Payment Amounts for Output of OPG’s Prescribed Assets: The Regulated Contract for Differences Concept IESO Presentation to OEB September 15, 2006.
Discussion on Multi Year Tariff By Vivek Sharma & Manisha Kabra.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
Comparison between Wind Energy Public Policies in Brazil and Colombia
Inter-American Development Bank
Business Environment and Investment Climate
OPG’s Views on Incentive Regulation and the Power Advisory LLC Report
What are the roles of government in our free enterprise economy?
EFFECTIVE LEGAL FRAMEWORK FOR PPPs
Industrial Policy of India
Presentation transcript:

Setting Payment Amounts for Output from OPG’s Prescribed Generation Assets TransAlta’s Presentation to the Ontario Energy Board September 15, 2006 File number EB TransAlta th Ave SW, Calgary, AB T2P 2M1 Phone: Fax:

2 Choosing a Regulatory Methodology - Criteria Board Staff criteria: Transparency Fairness Regulatory efficiency Consistency OPG “Non-Cost” Issues –Reliability –Capacity –Availability –New investment Expansions and refurbishments –Mitigation of market power Includes new investment

3 Also To Consider Market Policy –Stability important -> investor confidence Sustainable methodology chosen –Government's desire for a greater role for the private sector. –Methodology chosen should be flexible enough to work under various market design scenarios. –Shorter contracts (5 years) devised as a bridging mechanism until competitive market exists and coal decommissioned. Market Issues: –Impact on market price –Level playing field for market participants.

4 Cost of Service Complete transparency at the cost of regulatory efficiency? Does not fit with current structure/direction of the market. –Investor confidence –Can a level playing field be created? Difficult to address “non cost” issues. Other issues such as impact on market price and mitigation of market power will also be difficult to address with certainty. –Base loaded generation, bidding behavior? However, could be used as cost reference point for both Incentive Regulation and Regulatory Contract models.

5 Incentive Regulation General consensus that IR should not be undertaken without COS as a starting point. IR formula will be difficult to calculate, with few benchmarks available. –Also a more complicated method of addressing “non-cost” issues. –If done incorrectly will add risk to market. For both market participants and consumers. Investor confidence –New, untested element added to the existing hybrid market. –Mitigation of market power?

6 Regulatory Contract Can address Board Staff criteria if done properly –COS can be used to set the baseline price. Full COS review not necessarily required as frequently. –Think of contracts as an implementation method. Can address non-cost issues through contractual terms. –Likely easier than COS, IR Market Neutrality and Stability –Contracts already in place in the market today. Including existing base loaded facilities like Bruce Power. –Moving OPG to this regime would provide level playing field among market participants. Consistent approach between new and existing players. Incents consistent behavior.

7 Conclusion Risky to choose methodology in a policy vacuum. –Existing methodology could be the best choice for now. Criteria should be established. Impacts modeled We have the time!

8 Conclusion cont Regulatory contracts provide: –Market neutrality –Flexibility to address non-cost issues –Transparency can be build in Depends on pricing method chosen –Consistency Contracts are already well established in the hybrid market. –Investor confidence and level playing field.