SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.

Slides:



Advertisements
Similar presentations
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
Protocol Revision Subcommittee Tom Burke July 2, 2013.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
Protocol Revision Subcommittee Sandy Morris October 6, 2011.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
SAWG Update to WMS April 6 th, 2015 Brandon Whittle.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
Market Credit Working Group update to the Wholesale Market Subcommittee 09/02/
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Lead from the front Texas Nodal 1 TPTF Update for TAC January 4, 2007 Trip Doggett.
Demand Side Working Group Chair Slides May 28 th, 2014.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
COPS NOVEMBER 2012 UPDATE TO TAC 11/01/2012 Harika Basaran, Chair Jim Lee, Vice Chair.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
1 WMS Report TO TAC April 2007 (which is in March)
SAWG Update to WMS March 4 th, 2015 Brandon Whittle.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
CMWG Update to WMS Report of CMWG Meeting of
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date June 11, 2014.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Exceptional Fuel Costs in LMP
Real-Time Co-optimization of Energy & Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
A Midsummer Night’s DREAM
Presentation transcript:

SAWG Update to WMS September 2 nd, 2015 Brandon Whittle

Report Releases Final – LTRA Summary TablesLTRA Summary Tables SARA (expected 9/1) SARA Housekeeping None

CDR PUN Capacity Forecasting – NPRR725, Modifications to CDR PUN Capacity Forecasting and PUN Net Capacity Reporting RequirementsNPRR725 Potential Coal Unit Requirements - ERCOT received significant push- back on the potential Coal RFI and is re-evaluating their position on the RFI.

RT Co-op General Plan 1)ERCOT provide Concept Paper 2)Get written comments on concept paper 3)ERCOT and MPs discuss the Concept Paper and comments received and make policy cuts at focused SAWG meetings 4)Get help from WMS and/or TAC on sticky policy cuts 5)ERCOT write draft NPRRs a. RT Co-optimization b. Multi-Interval SCED 6) Market Participants provide comments on draft NPRRs 7) ERCOT and MPs discuss framework of Cost Benefit Analysis 8) ERCOT provide numbered NPRRs with preliminary Impact Analysis 9) Complete CBA

RT Co-Optimization – Qualitative Analysis Costs: 1.Implementation costs for Market Participants and ERCOT. 2.Change disruption for the market. 3.Potentially reduce generator revenue from energy which could raise resource adequacy concerns. Benefits: 1.Gets rid of the SASMs- getting rid of the SASMs is really important due to the way the SASMs have frequently cleared extraordinarily high. This has pushed smaller providers out of the DA ancillary services market. It is very hard for me to sell something today for $12 that I will likely be buying back at $4000 if my unit trips or if unfavorable congestion causes an entity to want to take unit off line. (might offer energy different in the DAM as well) 2.With a demand curve on each AS product, there would be a more accurate AS valuation. Provides more accurate real time pricing for A/S reflecting scarcity in real time. 3.Results in a more efficient dispatch (lower production cost) in real time for energy and ancillary services. 4.Makes available all capacity for energy by eliminating the HASL. This reduces the potential for market price reversal and solves operational issues related to the reserves requiring deployment; e.g. A/S will be moved from a constrained area to an unconstrained area via market mechanisms increasing reliability in an economically rational way. 5.Eliminates the need for settlement associated with RUC for A/S capacity (see NPRR663 and 689 and more). 6.Ensures that ERCOT operates with desired reserves. Currently SASMs do not always have sufficient offers. (note that ERCOT has failed to procure sufficient AS in a SASM 40 percent of the time - SOM Report). 7.Enable better participation by duration limited resources (gen or load) which increases reliability because if the capacity is used the responsibility will be moved elsewhere. Allows storage resources to offer AS based on their state of charge. 8.Potential uplift reduction through Real Time Co-optimization. (It may not reduce the cost to loads) 9.Better achieve the goal of just and reasonable prices.

RT Co-Optimization New, new Whitepaper released – Written comments on the Co- Optimization part, specifically the Option 1 or 2 and section 2.6.1, requested for 9/23 meeting. Contact Sai Moorty at ERCOT for more clarification. Please be prepared to discuss at the next meeting.Whitepaper Sai Moorty TAC Assignment Discussion: ERCOT to bring cost and benefit information (not a full CBA) QSEs were requested to bring any implementation concerns or estimates.

Multi-Interval RTM Readiness Study is under review at ERCOT, Resources have begun to assemble and prepare for the study Readiness Study No significant progress expected until 2016

Next Meeting – September 23 rd, 2015 Expected Agenda Items RT Co-optimization Process Whitepaper Comments ERCOT Analysis