Xx-xx-2010, tanks arrive from Snezhinsk to Novosibirsk A.Tribendis, July 19-21, 2010, Snezhinsk 1. Check cavity dimensions on a CMM 2. Assemble and measure.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
CSC, , A. Lombardi. 1 Status of HIPPI – April 2007 Maurizio Vretenar Alessandra Lombardi.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
ESS cavities interfaces
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
Refurbished Booster RF John Reid October 24, 2012.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
PASI OsC meeting 12th July 2012
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
Ports: purpose –vacuum, rf location –accelerating cavity, coupling cavity dimensions … Already discussed, but some points need to be double checked …
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Fabrication Update – The Frame Awakens Matt Hoff LBNL April 2,
BINP geometry (= cavity inner dimensions which define the boundary) is based on CERN geometry (as of August 4, 2008) with some adjustments made in order.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Introduction to mechanical design of the SPES RFQ Ferrari Luigi, Technical Review, 09/21/15 Design review, 09/21/20151.
Status of the rt CH-cavity - Anja Seibel -. Outline CH-Cavity CH-Parameter Heat distribution Cooling concept Final CH-Cavity First measurement results.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LINAC 4 CCDTL Accelerating Structure SO SO Aluminum foil H = 0,3…0,5 mm Module of CCDTL Accelerating Structure.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY.
Results of short module and qualification strategy
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
First Wall Panel - Overview
LCWS11 WG4 Fully featured accelerating structure engineering design
Completion of the MICE-US construction project
T5.2: Harmonization - Material and Component Reference
Overview of the RFCC Module and 201-MHz Cavity Design
Complementary ISTC Projects #3888, 3889p
HWR Cavities for China ADS
MICE Coupling Coil Update
IMP Cryomodule Assembly and Alignment
On the accuracy of port assembly at Wendelstein 7-X
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
System tests at CEA O. Piquet 19/03/2019
Presentation transcript:

xx-xx-2010, tanks arrive from Snezhinsk to Novosibirsk A.Tribendis, July 19-21, 2010, Snezhinsk 1. Check cavity dimensions on a CMM 2. Assemble and measure each tank with a few sets of aluminum drift tubes, find correct final dimensions of copper drift tubes. 3. Do final machining of copper drift tube bodies. EB-weld suspension stems to the bodies.

2. Turn the entire outer contour in a continuous pass (without changing the assembly in the chuck) 3. Mill the laser tracker target holders and drift tube suspension connection interface on the same holder 1. Machine the inner (beam) hole

EBW Gun Rotating table

4. Assemble and measure each tank with copper drift tubes (properly aligned), find correct final dimensions of fixed tuners. 5. Do final machining of AC fixed tuners. 6. While machining and welding drift tubes, measure coupling cells frequencies. 7. Machine coupling cell shell to bring the frequency into the tuning range. 8. Repeat coupling cell frequency measurements and find correct final dimensions of fixed tuners. 9. Do final machining of CC fixed tuners. 10. Assemble the entire module, check the tuning, measure field flatness, Q, find the right position of waveguide short. 11. Assemble the module with Helicoflex gaskets, perform vacuum leak tests. 12. Do 16 bar water tests, measure WFR for individual water cooling channels. 3. Do final machining of copper drift tube bodies. EB-weld suspension stems to the bodies. 13. Dismount drift tubes from cavities, prepare for shipment to CERN. 14. Negotiate with ISTC for shipment (and Customs) arrangements.