BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/2008 1 of 21 Storage Ring Vacuum Systems H. Hseuh, Vacuum Group ASAC Review of NSLS-II.

Slides:



Advertisements
Similar presentations
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.
Vacuum Vessel Production Readiness Review
SSRF1 ALUMINUM ALLOY VACUUM CHAMBERS FOR SSRF L.X. Yin, D.K. Jiang, H.W. Du, X.L. Jiang SSRF Vacuum Group Shanghai National Synchrotron Radiation Center.
Vacuum System Presented by Dong Haiyi Accelerator Center,IHEP,China April 27, 2006.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Undulator Development R&D Plan Toshi Tanabe George Rakowsky, John Skaritka, Steve Hulbert, Sam Krinsky, Timur Shaftan,
Review of Vacuum Technology Issues for Low-Emittance Rings R.Kersevan, CERN-TE-VSC-IVM Low-  Workshop, Oxford, 8-10 July 2013, J. Adams Inst. Accel. Studies.
BROOKHAVEN SCIENCE ASSOCIATES SR Chambers & RF Bellows ASAC Review, 3/26-27/ of 21 SR Chambers & RF Bellows H. Hseuh, Vacuum Group ASAC Review of.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Vacuum and mechanical design of ILC DR O. B. Malyshev ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK Low Emittance Ring Workshop
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
1 BROOKHAVEN SCIENCE ASSOCIATES Production of Vacuum Components H.C. Hseuh NSLS-II ASAC Review October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
1 BROOKHAVEN SCIENCE ASSOCIATES Lonny Berman and Dario Arena, NSLS Summary The present built-out NSLS-II design includes: 30 bending magnet ports, each.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
SR Vacuum Systems and Front Ends
NSLS-II ASAC Review, 10/9-11/06 H-C. Hseuh,…, SR Vacuum Systems Storage Ring Vacuum Systems H-C. Hseuh, C. Foerster, J. Hu, G. Mahler, S. Pjerov, S. Sharma,
1 BROOKHAVEN SCIENCE ASSOCIATES S.Sharma 10/11/2006 NSLS-II Mechanical Subsystems Accelerator Systems Advisory Committee Review October 10-11, 2006 Sushil.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review – May 11, 2007 S. Sharma NSLS-II Frontends and Canted Wigglers Options Sushil Sharma.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
BROOKHAVEN SCIENCE ASSOCIATES 0 Top-Off Safety Yongjun Li ASAC Meeting October 22, 2009.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
Cornell ERL Vacuum System as a Model for ILC Damping Vacuum System Conceptual Design Yulin Li & Joe Conway C ornell L aboratory for A ccelerator-based.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
1 NEG COATING RESULTS AND TRENDS R. Kersevan, Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab Workshop on Vacuum Systems for Synchrotron Radiation.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
Design of Vacuum Chambers of SSRF Storage Ring Yonglin. Chen, Dikui. Jiang SSRF Vacuum Group Shanghai Institute of Applied Physics(SINAP) China Academy.
Abstract Storage Ring Vacuum and Interface to Magnets Hsiao-chaun Hseuh, NSLS-II Project This presentation provided a quick overview of the storage ring.
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
NSLS Vacuum Experience Eugene J. Hu National Synchrotron Light Source Brookhaven National Laboratory Upton, NY USA September 12-13, 2005 (prepared.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Experimental Facilities Advisory Committee May 10, 2007 Satoshi Ozaki Director,
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
1 BROOKHAVEN SCIENCE ASSOCIATES Impact of Errors and Damping Wigglers on the Lattice W. Guo 02/26/2009 NSLS-II ASAC Meeting Acknowledgement: M. Borland.
Vacuum System Requirements for a Higgs Factory e + e - Accelerator R. Kersevan CERN, Technology Department Vacuum, Surfaces and Coatings Group R. Kersevan,
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
Further SR Studies for the Electron Polarimeter M. Sullivan for the JLEIC Collaboration Meeting Oct. 5-7, 2016.
The Budker Institute of Nuclear Physics
R. Kersevan, TE-VSC-VSM 30/06/2016
CEPC Vacuum System Dong Haiyi 2017/11/5.
The PEP-II Interaction e+e- Factories Workshop
XFEL Collimation and Beam Switchyard Vacuum Issues
Presentation transcript:

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Storage Ring Vacuum Systems H. Hseuh, Vacuum Group ASAC Review of NSLS-II July 17-18, 2008

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Outline Vacuum System Requirement and Layout Vacuum Chamber Design Prototype Chamber Fabrication Ray Tracing, Absorbers and Pressure Profiles Layout of Straight Sections for ID, Inj. and RF Development in Bellows, BPM Buttons, NEG Strip Support Development in In-situ Bake and Ozone Cleaning Summary

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Vacuum Chambers - Adequate Apertures and Low Impedance Beam aperture – 25 mm (V) x 76 mm (H) Chamber straightness - < 1 mm / 5 m Smooth cross section changes: inclination angle < 10 o Minimum steps or cavities < 1 mm Mechanical stability: 1 fixed & 2 flexible invar supports at BPMs P(avg) 50% H 2, < 50% CO, CO 2, CH 4, …), Շ (beam-gas) > 40 hr (inelastic scattering) Local pressure bumps ➾ bremsstrahlung radiation Intercept BM photons at discrete absorbers –To protect un-cooled flanges and bellows –Large ion pump and TSP (or NEG cartridge) at absorbers Two NEG strips in antechamber to provide linear pumping Vacuum Requirements

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Cell Vacuum Chamber Layout BM Beamline ID Beamline L.S. S.S. Absorbers/pumps S m S3 - 3m S4 – 3.3m S5 – 3m S6 – 3.7m Aluminum Cell Chambers S2S3 S4 S5 S6 Multipole chamber Dipole chamber, 6 o bend Stainless chambers S1

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Extruded cross section Machined at pole locations Bended and machined Extruded 3 mm wall 3.1 mm wall Multipole Chamber Dipole Chamber At Quadrupole At Sextupole Cell Chamber Cross Sections and Analysis Maxi. δ = 0.3 mm x2 Max. S = 42 MPa Maxi. δ = 0.27 mm x2 Max. S = 64 MPa S yield (A6063T5) = 145 MPa S stress (A6063T5) = 186 MPa

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 End plate & bi-metal flanges Aluminum Cell Chamber Fabrication Extrusion ➾ bending ➾ machining ➾ cleaning ➾ welding ➾ assembly …. $ $$$ $ $$ $ V #1,2V #3V #4, 5, 6…APS BNL Extrusions Machining Test extrusion with two vendors completed Fabricate two S4 chambers by Sept Machining by CS and by vendor started Weld development by APS started Bending of dipole extrusions starts soon Machining End plate End Assy Welding at APS L. Doom

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Ray Tracing of Photon Fans To define photon fans and absorber locations ➾ To ensure adequate apertures for photon fans ➾ To protect un-cooled flanges and bellows ➾ To estimate power, density and ΔT for absorbers, and P profile Damping Wiggler Multipole Dipole Multipole DW fan DW absorber Flange absorber Stick absorber Crotch absorber DW fan : 32 kW x 2, ± 2.6 mrad canted by ± 1.8 mrad EPU fan: 6 kW x 2, ± 0.46/0.77 mrad canted by ± 0.12 mrad? IVU fan: 8 kW, ± 0.31 mrad Dipole fan : 2.4 kW, 105 mrad Damping Wiggler

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 DW and BM Photon Fans at S1-S4 Region Larger bellows and RF fingers to accommodate canted DW fan S2S3 S2 S3 DW ABS > 15 kW Vertical fan hitting Top/bottom wall BM S3, S6 ~5 EPU S1-S3 < 35 IVU20 S1 160* DW S1 166 S2 280 S3 270 S4 Source Location P(W) Large SR power intercepted here Limited space for pumping ports and multipoles S3 S4BS4A *on magnet shields M. Ferreira

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 P = 166 W P = 274 WP = 230 W S1B Simulation of DW vertical power using SPECTRA8 S2 S3 DW 1 P = 40 W From DW1 From DW2 DW 2 ΔP < 0.3 W/cm 2 h ~ 9 mm h = mmh = mm P = 6 W DW fan profile M. Ferreira Power and density are not excessive for S2 and S3 chambers Flange absorbers may be added at S1A-S1B, S1B-S2, and S2-S3? to trim vertical fan effectively, still with reasonable impedance mrad mrad ΔP < 0.5 W/cm 2 S1A

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Photon Absorbers (8-10 per cell) Stick < 12 W/mm 2, T max ~ 200 o C < 3 W/mm 2, T max ~ 68 o C P (kW) absorber22 P max (W/mm 2 )25 S max (MPa)303 T max ( o C)256 Damping Wiggler Absorber BM Absorber Positions and Power Crotch in dipole Crotch Stick in multipole Flange Absorber brazing development started

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Absorber Positioning vs. Aperture Requirement -- ± 3% aperture Δ ABS +X position W. Guo

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Pressure Profile with and without DW 3 GeV, 0.5A, η = 1x10 -5 P avg = 0.13 nT P avg = 0.25 nT LS SS Local ΔP w/ 15% DW fan ➾ bremsstrahlung radiation Molflow Code (R. Kersevan/ESRF) To be updated E. Hu

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Layouts for Insertion Device Straights ID Chamber Design: Chamber inner height ≈ magnet gap - 3 mm Extruded Al with NEG strips in antechamber Or extruded Al w/NEG coated APS ID chamber Limited space for stand-alone ID BPMs h = 8 x 57 mm, 1mm wall h = 7.5 mm, 1.25 mm wall ESRF NEG coated chamber 9.3 m straight for 2 x 3.5 m DW 6.6 m straight for 2 x 2 m EPU

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Injection Straight RF Straight Bellows + transition Layouts for Injection and RF Straights Working closely with AP, Diag, Magnet and other systems on the layout of special components

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 inside fingers M. Ferreira outside fingers Choice of RF Shielded Bellows inconel springs Be-Cu fingers Inside fingers Outside fingers (APS, LNLS) (Soleil, Diamond, etc) Simple, reliable Lower impedance $$ $$$ Outside fingers Wider fingers Fewer fingers RF Bellows Requirements: Max mis-alignment: 2 mm; Max comp/extension: ± 12 mm; Max angle deviation: 15 mrad 3D model for impedance simulation Inside or outside fingers?  loss = 10 mV/pC Solid sleeve

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Impedance of Other Vacuum Components Component #  loss, V  loss, V RF Bellows2001e-2?2 S4A pump port301e Stick absorber1202e Gate valve602e Crotch absorber60TBD Flange absorber~ 500.2? Multipole chamber with stick absorber and pumping ports S4A chamber with absorber and shielded pumping ports A. Blednykh GV RF shields Work closely with AP on vacuum components impedance simulation and approval Flange absorber S4A absorber and pump port Dipole chamber with crotch absorber and pumping ports

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Mounting of BPM Buttons/Flanges 7mm Ø 12 mm apart w/ 44 mm Ø flange Optimum design: 7 mm Ø buttons, 16 mm apart? (O. Singh’s talk) P. Cameron Rectangular flange? Sealing reliability? CD-2 Design 10mm Ø button /34 mm Ø flange /Helicoflex seal mm wall may be too thin for bolts/inserts & sealing 15 mm wall?

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 NEG strip supports Riveted mounting every 10cm, with alumina insulators on carrier plates Prototype to be tested on APS chambers for reliability and flexibility L. Doom, K. Wilson NEG support development using APS chambers NEG strips in Antechamber

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 M. Ferreira, F. Lincoln T ~120 o C achievable with foil heaters mounted at drift space (< 1 kW/m) Need to optimize power, heater temp, non-magnetic, insulation, etc Eliminate the needs of high P, hot water system, a major ES&H concern In-situ Bake with External Heaters APS chambers for bakeout development

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Process developed by T. Momose, KEK Final cleaning prior to installation (after alignment…) Extensive O 3 monitoring to meet ES&H requirements System being assembled for testing K. Wilson Ozone Cleaning Development Flush chamber with < 500 ppm O 3 in O 2 to break and remove contaminants Ozone system flow diagram

BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Summary Cell vacuum chamber design is well advanced Test extrusion of both cross sections completed with two vendors Machining and weld development of prototype chambers are underway Ray tracing and absorber development continues Straight section layouts for ID, RF and Inj has started RF shielded bellows design has started Work with AP on vacuum component impedanace Work with Diag. on finalizing BPM button/feedthru design. NEG strip supports developed and is being tested Chamber bakeout with foil heaters is successful Ozone cleaning system developed and is ready for evaluation