December GDB Brief summary – J Coles. Meetings January meeting moved to 15 th 2014 events created. Check March meeting outside CERN. Copenhagen workshop.

Slides:



Advertisements
Similar presentations
Jan 2010 Current OSG Efforts and Status, Grid Deployment Board, Jan 12 th 2010 OSG has weekly Operations and Production Meetings including US ATLAS and.
Advertisements

Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES News on monitoring for CMS distributed computing operations Andrea.
LHC Experiment Dashboard Main areas covered by the Experiment Dashboard: Data processing monitoring (job monitoring) Data transfer monitoring Site/service.
WLCG Operations Coordination report Maria Dimou / CERN With input and on behalf of the WLCG Operations Coordination team May 2015 GDB CERN indico event.
Status of WLCG Tier-0 Maite Barroso, CERN-IT With input from T0 service managers Grid Deployment Board 9 April Apr-2014 Maite Barroso Lopez (at)
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EG recent developments T. Ferrari/EGI.eu ADC Weekly Meeting 15/05/
SRM 2.2: status of the implementations and GSSD 6 th March 2007 Flavia Donno, Maarten Litmaath INFN and IT/GD, CERN.
Network and Transfer WG Metrics Area Meeting Shawn McKee, Marian Babik Network and Transfer Metrics Kick-off Meeting 26 h November 2014.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP35, Liverpool 11 Sep 2015.
The HEPiX IPv6 Working Group David Kelsey EGI TF, Prague 18 Sep 2012.
New DM Clients and retirement plans for old ones Alejandro Alvarez Ayllon on behalf of the DM Clients developers IT/SDC 11/12/2013.
RI EGI-InSPIRE RI EGI Future activities Peter Solagna – EGI.eu.
Towards a Global Service Registry for the World-Wide LHC Computing Grid Maria ALANDES, Laurence FIELD, Alessandro DI GIROLAMO CERN IT Department CHEP 2013.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
WLCG operations A. Sciabà, M. Alandes, J. Flix, A. Forti WLCG collaboration workshop July , Barcelona.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons 10/12/2014.
GDB July 2015 Jeremy’s quick summary notes Also refer to the meeting minutes
1 User Analysis Workgroup Discussion  Understand and document analysis models  Best in a way that allows to compare them easily.
INFSO-RI Enabling Grids for E-sciencE Enabling Grids for E-sciencE Pre-GDB Storage Classes summary of discussions Flavia Donno Pre-GDB.
WebFTS File Transfer Web Interface for FTS3 Andrea Manzi On behalf of the FTS team Workshop on Cloud Services for File Synchronisation and Sharing.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI (Present and) Future of the EGI Services for WLCG Peter Solagna – EGI.eu.
Information System Status and Evolution Maria Alandes Pradillo, CERN CERN IT Department, Grid Technology Group GDB 13 th June 2012.
HEPiX IPv6 Working Group David Kelsey GDB, CERN 11 Jan 2012.
Storage Accounting John Gordon, STFC GDB March 2013.
LCG Introduction John Gordon, STFC GDB June 8 th 2011.
Accounting Update John Gordon and Stuart Pullinger January 2014 GDB.
WLCG Technical Evolution Group: Operations and Tools Maria Girone & Jeff Templon Kick-off meeting, 24 th October 2011.
Julia Andreeva on behalf of the MND section MND review.
EMI INFSO-RI European Middleware Initiative (EMI) Alberto Di Meglio (CERN)
GDB - February 2014 Summary Jeremy’s notes Agenda:
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
RI EGI-InSPIRE RI UMD 2 Decommissioning Status Cristina Aiftimiei EGI.eu.
WLCG Operations Coordination Andrea Sciabà IT/SDC 10 th July 2013.
WLCG Technical Evolution Group: Operations and Tools Maria Girone & Jeff Templon GDB 12 th October 2011, CERN.
Grid Deployment Board 5 December 2007 GSSD Status Report Flavia Donno CERN/IT-GD.
The Grid Storage System Deployment Working Group 6 th February 2007 Flavia Donno IT/GD, CERN.
The GridPP DIRAC project DIRAC for non-LHC communities.
Placeholder ES 1 CERN IT EGI Technical Forum, Experiment Support group AAI usage, issues and wishes for WLCG Maarten Litmaath CERN.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
ATLAS Distributed Computing ATLAS session WLCG pre-CHEP Workshop New York May 19-20, 2012 Alexei Klimentov Stephane Jezequel Ikuo Ueda For ATLAS Distributed.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons Maarten Litmaath On behalf of the WG participants GDB 09/09/2015.
CERN - IT Department CH-1211 Genève 23 Switzerland t IT-GD-OPS attendance to EGEE’09 IT/GD Group Meeting, 09 October 2009.
Evolution of WLCG infrastructure Ian Bird, CERN Overview Board CERN, 30 th September 2011 Accelerating Science and Innovation Accelerating Science and.
WLCG Operations Coordination and Commissioning Maria Girone, CERN IT On behalf of the Operations Coordination Team 11 th March OSG All Hands Meeting,
Status of GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
HEPiX IPv6 Working Group David Kelsey david DOT kelsey AT stfc DOT ac DOT uk (STFC-RAL) HEPiX, Vancouver 26 Oct 2011.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPIX, BNL 13 Oct 2015.
The HEPiX IPv6 Working Group David Kelsey (STFC-RAL) EGI OMB 19 Dec 2013.
SAM architecture EGEE 07 Service Availability Monitor for the LHC experiments Simone Campana, Alessandro Di Girolamo, Nicolò Magini, Patricia Mendez Lorenzo,
Acronyms GAS - Grid Acronym Soup, LCG - LHC Computing Project EGEE - Enabling Grids for E-sciencE.
Outcome should be a documented strategy Not everything needs to go back to square one! – Some things work! – Some work has already been (is being) done.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Storage Accounting John Gordon, STFC OMB August 2013.
LCG Introduction John Gordon, STFC-RAL GDB June 11 th, 2008.
LCG Introduction John Gordon, STFC-RAL GDB November 7th, 2007.
WLCG Operations Coordination report Maria Dimou Andrea Sciabà IT/SDC On behalf of the WLCG Operations Coordination team GDB 12 th November 2014.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Services for Distributed e-Infrastructure Access Tiziana Ferrari on behalf.
Site notifications with SAM and Dashboards Marian Babik SDC/MI Team IT/SDC/MI 12 th June 2013 GDB.
Accounting Update John Gordon. Outline Multicore CPU Accounting Developments Cloud Accounting Storage Accounting Miscellaneous.
HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP33 Ambleside 22 Aug 2014.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
LCG Introduction John Gordon, STFC GDB December 7 th 2010.
The Grid Information System Maria Alandes Pradillo IT-SDC White Area Lecture, 4th June 2014.
Operations Coordination Team Maria Girone, CERN IT-ES GDB, 11 July 2012.
WLCG IPv6 deployment strategy
Sviluppi in ambito WLCG Highlights
WLCG Operations Coordination
15th January 2014 Notes not yet edited!
Update on Plan for KISTI-GSDC
Update from the HEPiX IPv6 WG
WLCG Collaboration Workshop;
Presentation transcript:

December GDB Brief summary – J Coles

Meetings January meeting moved to 15 th 2014 events created. Check March meeting outside CERN. Copenhagen workshop – reasonable attendance. Some notes online. Future meetings – Accounting, HS06, jobs with high-memory profiles, H2020 projects, cloud issues. Pre-GDBs: January on clouds. Feb 11 on ops coordination. New SAM tests (request for overview). Comments on fairshare impacts and might be stuck behind production activities. DPM workshop 13 th dec. DPHEP curation workshop th Jan. ISGC 22 nd -28 th March. HEPiX May EGI Community forum May.

Identity federation Traditional access to grid – 3 steps. Target to put x509 and VOMS parts behind UI/portal. Use cases: web-based portals/job submission; CLI-based (submission and admin tasks). Identity federation pivots on trust/policy issues Laid out requirements and regulation: a policy on attributes for WLCG. Building blocks identified. Technical pilots successful – need to fit together.

IOTA – Dave Kelsey Identifier-Only Trust Assurance with Secured Infrastructure Authentication Profile (IOTA) Traceability requirement Some operational issues Cannot mix Vos requiring different levels of assurance!

Provisioning of EGI core services UMD-2 components to be decommissioned/upgraded by May Monitoring Jan; Alarms Feb End May 2014 suspension. Core services: Msg brokers -> GRNET & SRCE. No major change but test infrastructure goes. Accounting unchanged. Accounting portal unchanged. Metrics portal will become best efforts. SAM central service -> GRNET, CNRS & SRCE Catch-all VOMS/CA from GRNET and CYFRONET. Security coordination. Staged rollout will continue. Coordination LIP (10% reduction in effort). Helpdesk: Provided by KIT as a service (next 2 years) 1 st /2 nd level support will move to IBERGRID & CESNET. Core service providers do own support (e.g. APEL). Note: Some services much less funding but there is a commitment to WLCG for some services (CERN is doing it for WLCG if not EGI as agreed at OB).

WLCG ops coordination New task force on multicore deployment. Next meeting 19 th December Cancelled/delayed plans: Data access & Dynamic data placement TFs. Plans: ALICE – CVMFS & SAM tests ATLAS- FAX, Rucio, cloud benchmarking/multicore CMS- Multicore, xrootd federation LHCb- perfSONAR link DIRAC. Switch SL6. SL6 – positive outcome CVMFS: WN caches sometimes stale (improve monitoring). Base v Glexec – still deploying. CMS tests critical from Jan. SHA-2 perfSONAR: deploy >3.3.1 by 1 st April. If behind FW request open specific Ips. Issue with code support. FTS3. Stable. Usage increasing. Looking at deployment scenarios. Tracking tools – migration to JIRA. GGUS xmas cover. Xrootd: 2.6 needed for SHA-2 and monitoring. Consolidate GLED collector. Machine/job features – System converge on minimise waste of CPU time for multicore pilots. IPv6: recipe for IPv6 on SLC6. CMS testing CMSWEB on iPv6. ATLAS DDM tests soon. WMS decommissioning. Still some CMS use. 20 LHCb sites to move to direct submission. Middleware readiness – kick-off tomorrow.

SHA-2 readiness and plans Sites: Steadily upgrading. Main concern Ses. 5 dCache and 7 StoRM still to be done. BNL/FNAL in Dec. Clients: dCache SRM client need newer version (jglobus2) to handle SHA-2 host certs. Some CMS sites may have configured client for local staging released on Dec2 as part of EMI-3 Update x update for EMI-2 WN being prepared. Experiments: Look ready. Timelines: by mid-January “essentially ready”. OSG CA switch mid-Jan. CERN CA will switch when WLCG ready. VOMRS. Does not support directly. VOMS-Admin being prepared (but there is an instability).

New DM clients - migration Gfal/lcg-util on maintenance only. No IPv6 support. Status gfal2: in EPEL. ABI and API incompatible. Advantages: srm, gsiftp, http, xrootd. Cmd line tools – gfal2-util. Will distribute EPEL5 and 6. Removed from EMI repos. Release as needed. LFC support: LFN:// deprecated. Can still use if LFC_HOST defined.

LHCOPN/ONE meeting report 2 new T1s. Traffic overall starting to ramp up again OPN evolution workshop February. L2VPN and R&D P2P service (R&D). Project leaders at sites wanted.

IPv6 – Dave Kelsey Data transfer lessons learned. Software and tools IPv6 survey Use cases Testing in 2014 Timetable: many sites need to support IPv6. Workshop in Spring/Summer ** CERN IPv4 pools status update IPv6 staged testing results… next stpes inv dhcpv6 Will hit CERN in Dev almost done. Deployment by Q cern.ch/ipv6

Global service registry – Maria Alandes Present system: – Central portals: OIM and GOCDB + Distributed BDII hierarchy Syncs are a problem. Vos have different solutions (Alien-DIRAC-AGIS…). GSR aims to simplify this area (caches static info). Prototype implemented and feedback positive. Need use-case

HEPiX Background Good attendance. Included company reps. Networking and security (9 talks) Computing and batch systems (6 talks) IT facilities (3 talks) Basic IT services (8 talks) End user IT services and OS (3 talks) Grids, clouds, virtualisation (7 talks) Storage and file systems (10 talks) 16 site reports SPECcpu benchmark announced for Oct Start preparing now.