1 ILD – A Large Detector for ILC Nov. 6, 2007 Yasuhiro Sugimoto KEK.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
GLC Detector Geometry Y. Sugimoto. Introduction Figure of merit : Main Tracker.
Snowmass 25 AugustMark Thomson 1 PFA Progress and Priorities Mark Thomson (for Steve Magill, Felix Sefkow, Mark Thomson and Graham Wilson)  Progress at.
“GLD” Detector Concept Study 21. Mar. Y. Sugimoto KEK.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
The GLD Concept. MDI Issues Impact on Detector Design L*  Background (back-scattered e+-, , n) into VTX, TPC Crossing angle  Minimum veto angle for.
ILC Detectors - concepts and R&D status/plans - 清華大学、北京、 Jan 12, 2009 Hitoshi Yamamoto 東北大学.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Tracking Integration Challenges Y. meeting 2013/9/25.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
1 1 LCC Physics and Detector Hitoshi Yamamoto ILD WS, Kracow Sep 24, 2013.
111 ILD LOI Part-II: Detector Y. Sugimoto KEK for ILD concept group.
Introduction to Large/Huge Detector study 10. Nov. meeting in 7 th ACFA LCWS in Taipei Y. Sugimoto KEK.
Report from WWS and charge to the workshop Hitoshi Yamamoto 3/3/05 KEK.
Silicon Tracking Systems in Mokka Framework Valeri Saveliev, Obninsk State University.
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
7 August, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 8月7日 宮本彰也.
Summary of Simulation and Reconstruction Shaomin CHEN (Tsinghua University)  Framework and toolkit  Application in ILC detector design Jupiter/Satellites,
Detector R&D for ILC Y. Sugimoto Mar Outline Detector for ILC Boundary Conditions Performance Goals Detector Concepts Milestones R&D of Sub-detectors.
1 Snowmass2005 report 2005/09/26 H. Matsunaga GLDCAL meeting.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
1 GLD and GLDc Sep. 12, 2007 Y. Sugimoto KEK. 2 Compact GLD Option Motivation –GLD and LDC will write a common LoI –The detector design should have common.
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
Report from ILC detector working group Tao Hu Institute of High Energy Physics.
Cost Issues Y.Sugimoto, A.Maki Estimation Procedure Get unit cost from the cost estimation for GLD(DOD) Estimate (relative) amount of return-yoke.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
ILC Detector Design Study in Japan Contents Introduction Overview of ILC detector R&D Requirements for ILC detectors Activities in Japan Detector concept.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
Coil and HCAL Parameters for CLIC Solenoid and Hadron-calorimetry for a high energy LC Detector 15. December LAPP Christian Grefe CERN.
“Huge” Detector Concept 3 Sep 2004 ECFA LC Durham Satoru Yamashita ICEPP, University of Tokyo On behalf of many colleagues Towards our common.
SiD Snowmass 05 Jaros1 Optimizing SiD getting from here….……………….to there SiD Concept/Snowmass August 16, 2005 John Jaros.
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
Software Status for GLD Concepts Akiya Miyamoto 31-October-2007 ILD Optimization Meeting References: - Y.Sugimoto, “GLD and GLDc”, talk at ALCPG07, ILD.
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
1 Design Activity of Large Detector for ILC July 18, 2007 Yasuhiro Sugimoto KEK.
1 ILD – A Large Detector for ILC Mar. 3, 2008 Yasuhiro Sugimoto KEK.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
4th Concept Detector G P Yeh TILC08, Sendai, Japan Mar. 3-6, 2008.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
12/20/2006ILC-Sousei Annual KEK1 Particle Flow Algorithm for Full Simulation Study ILC-Sousei Annual KEK Dec. 20 th -22 nd, 2006 Tamaki.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
1 ILC Physics and Detectors Akiya Miyamoto KEK 8-March-2005 APPI 2005.
VLCW06, July 23, 2006 H.Weerts Vancouver, CA 1 Where YOU can contribute in SiD. H.Weerts Argonne National Lab for SiD concept design study.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
SiD R&D Plan and Opportunities for New Collaborators
ILD Technical Coordination
100th meeting Ties Behnke, DESY
Layout of Detectors for CLIC
For ILD joint steering board
SiD Calorimeter R&D Collaboration
Status of Ecal(s) for ILD
CLIC detector at SiD meeting 28/3/2010
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Calorimetry for a CLIC experiment
The DBD: Outline and Scope
ILD Optimisation: towards 2012 University of Cambridge
Detector Optimization using Particle Flow Algorithm
Sheraton Waikiki Hotel
Presentation transcript:

1 ILD – A Large Detector for ILC Nov. 6, 2007 Yasuhiro Sugimoto KEK

2 Contents ILC detectors Integration of GLD/LDC into ILD ILD study activity Summary

3 Requirements for ILC detectors ILC detectors should identify and measure 4-momenta of Benchmark processes

4 Performance goal Vertex Detector Impact param. res. :  b = 5  10/(p  sin 3/2  )  m Charm and  ID is important : c  ~ 100  m >>  b Tracker  p t /p t 2 = 5x10 -5 /GeV Calorimeter Jet energy resolution :  Ej /E j = 30%/E j 1/2 Hermeticity Forward coverage down to ~5 mrad or  Ej /E j = %

5 Detector concepts for ILC Four Detector Concepts: GLD, LDC, SiD, 4 th Three of them (GLD, LDC, SiD) are optimized for “PFA” Measure energy of each particle in a jet separately: Charged particles by tracker,  s by ECAL, and neutral hadrons by HCAL Larger BR CAL 2 is preferable to separate charged tracks in the calorimeter Calorimeter should have fine granularity

6 Detector features GLDLDCSiD4-th TrackerTPC + Si-strip Si-stripTPC or DC Calorimeter PFA Rin=2.1m PFA Rin=1.6m PFA Rin=1.27m Compensating Rin=1.5m B3T4T5T 3.5T No return yoke BR CAL Tm Tm Tm 2 (non-PFA) E store 1.6 GJ1.7 GJ1.4 GJ 2.7 GJ Dual solenoid Size R=7.2m |Z|=7.5m R=6.0m |Z|=5.6m R=6.45m |Z|=6.45m R=5.5m |Z|=6.4m

7 Integration of GLD/LDC into ILD ILC Detector Roadmap Convergence of detector concepts from 4 to 2 by the end of next year in order to concentrate limited resources into engineering design activities Oct. 2007: LOI call by ILCSC Oct. 2008: LOI submission End of 2008: Two detectors for EDR are defined by IDAG By July 2010: Two Detector Engineering Design Reports (EDR) GLD and LDC have similar concept Calorimeter optimized for PFA TPC as the central tracker for excellent pattern recognition GLD and LDC agreed to write a single common LOI Study for the common design (ILD) has started

8 Short history of ILD Feb.2007: At ACFA WS at Beijing, serious discussion on the ILC detector roadmap has started Feb :A letter was sent from ILCSC to WWS co-chairs requiring to draw a roadmap to produce two detector EDRs by 2010 keeping pace with the accelerator schedule Mar.2007~:Detector roadmap working group is formed and several phone meetings have been held Apr.2007:Proposal of the “LOI process” to the roadmap W.G. Apr :The 1 st joint meeting of GLD-LDC contact persons May :GLD-LDC joint meeting at LCWS2007 and agreement on the joint effort towards a common LOI Jul.2007:GLD/LDC joint steering board (JSB) members are selected Aug :The 1 st JSB meeting and agreement on organizing working groups Sep :The name of the detector is decided as “ILD” (until formation of real collaboration) at the 3 rd JSB meeting Oct.2007:ILD meeting at ALCPG2007

9 Long history of GLD/LDC GLD 1992: “JLC-I report” 2T solenoid Jet chamber Non-PFA CAL 1998~: ACFA Workshop on physics/detector at LC (1 st at Beijing) 2001: “Particle Physics Experiments at JLC” 3T solenoid Smaller R CAL (1.6m) 2003: Internationalization of JLC JLC  GLC 2004: ITRP decision (Warm  Cold) PFA CAL Large R CAL (2.1m) TPC GLC detector  GLD 2006: Detector Outline Document LDC 1998~: ECFA study on physics and detectors for LC 2001: TESLA TDR 4T solenoid TPC R CAL =1.68m 2004: ITRP decision TESLA detector  LDC 2006: Detector Outline Document

10 GLD baseline design (VTX and SIT not shown)

11 LDC baseline design

12 GLD/LDC baseline design Sub-detectorGLDLDC Vertex det.FP CCD CPCCD/CMOS/DEPFET/ISIS/SOI/… Si inner trackerSi strip (4-layers)Si strip (2-layers) Si forward trk.Si strip/pixel (?) Main trk.TPC Additional trk.Si endcap/outer trk. (option)Si endcap/external trk. EM CALW-ScintillatorW-Si HCALFe(Pb)-ScintillatorFe-Sci./RPC*/GEM* Solenoid3T4T Muon det.Scintillator stripSci strip/PST/RPC Iron yoke(25cm + 5cm) x 9/10(10cm+4cm) x m Forward CALW-Si/Diamond * Digital HCAL

13 Expected performance Impact parameter resolution LayerR (mm)  m Si-equivalent per layer is assumed GLD study Performance goal achieved

14 Expected performance Momentum resolution GLD study SiD study Performance goal achieved

15 Expected performance PFA performance E (GeV) Jet-energy resolution study by M.Thomson for LDC00 (BR 2 =11.6 : Larger than latest LDC) Performance goal almost achieved

16 ILD study activity Mandate To write a Letter of Intent (LoI) to produce a detector Engineering Design Report (EDR) Milestones May 2008:Define the baseline parameter set for the unified detector Oct.1,2008:Submit LoI

17 Letter of Intent LOI will include Detector design convincing of feasibility R&D plan for technologies which are not established Demonstration of physics performance Reliable cost estimation Description of the organization capable of making the engineering design Participating institutes Commitment of major labs LOI will NOT include Final technology choice for sub-detectors  Several options will be preserved

18 ILD organization Joint steering board members selected in July 2008 T.Behnke, D.Karlen, Y.Sugimoto, H.Videau, G.Wilson, H.Yamamoto Our effort is now focused on unification of GLD/LDC and defining the optimized parameters of the ILD At present, we don’t have sub-groups for sub-detectors specific to ILD (contrasting to SiD) Information of sub-detectors will be obtained from existing horizontal collaborations (LC-TPC, CALICE, SiLC, etc.) For the design of ILD, three working groups are organized Detector optimization W.G. (M.Thomson, T.Yoshioka) MDI/Integration W.G. (K.Busser, T.Tauchi) Cost W.G. (A.Maki, H.Videau)

19 Charge of W.G.s Detector Optimization Investigate the dependence of the physics performance of the ILD detector on basic parameters such as TPC radius and B-field. On the basis of these studies and the understanding of any differences observed the WG will make recommendations for the optimal choice of parameters for the ILD detector MDI/Integration The MDI/working group is charged to produce a self-consistent design of the structure of the ILD detector from the viewpoint of machine-detector interface (MDI) and detector integration for the LOI that is to be submitted by October 1, Specifically, it covers the design of the beam pipes, magnets, iron return yoke, beam instrumentations, and their supports that require works by the detector group. Also, it should address general detector structure and assembly issues, where the aspects that affect the machine design will have initial priority. Beam background studies should be performed when necessary. The group should work closely with the machine people and the groups working on subdetectors that affect the structure of the ILD detector.

20 Optimization procedure Estimate physics performance for selected benchmark processes as a function of detector parameters At first, we define the mesh-points in multi-dimensional phase space of parameters: i.e., GLD, GLD’, LDC’, LDC, and simulation study will be done at these mesh-points Sub-detectorParameterGLDGLD’LDC’LDC TPCRin (m) Rout (m) Zmax (m) Barrel ECALRin (m) MaterialSci/W Si/W Barrel HCALMaterialSci/Fe Endcap ECALZmin (m) SolenoidB field (T) VertexRin (mm)

21 Next step Once the common parameters are determined in May 2008, more benchmark processes should be studied to demonstrate the performance of ILD Guideline of benchmark processes will be shown by Research Director (concept groups can give him inputs)

22 Engineering challenge of GLD Optimization W.G. does not discuss about “real world” A lot of realistic engineering issues will be studied/discussed in the MDI/Integration W.G., such as How to support sub-detectors How to integrate sub-detectors into a detector system Surface assembly scheme (CMS style?) Detector alignment Power consumption and cooling method Amount of cables and pipes coming out from the detector Location and size of electronics-hut Design of back-end electronics and DAQ system Design of detector solenoid with anti-DID (Detector Integrated Dipole) and flux-return yoke How to open and maintain the detector How to make it compatible with the push-pull scheme …

23 How to join ILD Join Working Groups Mailing list subscription from Join working group meetings d=129 d=129 Join sub-detector R&D relevant to ILD

24 ILD calendar NowWorking group phone meetings Jan. 2008ILD meeting in Europe Mar. 2008ILD meeting associated with ACFA workshop in Sendai (TILC08) May. 2008Define the baseline parameter Jun. 2008ILD meeting at ECFA workshop in Warsaw Aug.-Sep. 2008Shall we have ILD meeting in Asia? Oct 2008LoI submission

25 Future prospect beyond LOI EDR Feature of detector EDR in 2010 Used as a proposal of the ILC project to governments together with accelerator EDR Not a construction-ready design report The design described in the EDR could be changed depending on the outputs from LHC and/or detector R&D after 2010 Construction-ready EDR (or TDR) will supposedly be made in (?) Resource It requires a sizable resource to make an EDR We have to make all efforts to get the resource

26 Summary ICFA/ILCSC called for LOI to be submitted by Oct.2008 Two detector concepts will write EDRs by 2010 GLD and LDC spontaneously merged into ILD and will write a common LOI There are so many issues to be studied towards LOI and EDR Optimization study for the common detector parameters Simulation studies to demonstrate ILD performance Engineering studies for MDI/detector integration Sub-detector R&D We are at a phase of great fun – Don’t miss the opportunity!