1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.

Slides:



Advertisements
Similar presentations
AVAILABILITY BASED TARIFF SCHEDLING PROCEEDURE AND SETTLEMENT MECHANISM UNDER ABT REGIME T. SRINIVAS MANAGER,SRLDCBANGALORE.
Advertisements

INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
POWER GRID CORPORATION OF INDIA LTD
Hon’able Members of Standing Committee on Energy WELCOMES POWER GRID CORP. OF INDIA LTD.
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
W E L C O M E Power Grid Corporation of India Limited.
WELCOME TO K. SWAMINATHAN, CHAIRMAN K. SREERAMA MURTHY, MEMBER
1 WORLD BANK MISSION. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
POWER GRID CORPORATION OF INDIA LTD. An Overview of SOUTHERN REGION GRID OPERATION By D.K.Guru & S.P.Barnwal SRLDC, BANGALORE.
AN OVERVIEW OF AN OVERVIEW OF SOUTHERN REGION SOUTHERN REGION POWER SYSTEM POWER SYSTEM ADDITIONAL GENERAL MANAGER SRLDC, BANGALORE.
1 POWER GRID CORPORATION OF INDIA LIMITED BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC, BANGALORE PRESENTATION By L.K.Kanungo SOUTHERN REGIONAL GRID ON U.K.Verma &
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 139 TH SREB MEETING 19 TH DECEMBER 2005 HYDERABAD GRID EVENTS AND ISSUES.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
1 DELEGATES FROM JAPAN. 2 INDIA POLITICAL MAP POPULATION :- 103 CRORES AREA :- 3,419 (‘000 SQ KM) STATES :- 29 UT :- 6 BIGGEST CITY :- MUMBAI WE ARE HERE.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
1 REGIONAL GRIDS QUICK FACTS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 34,207.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
UI IN SR (FROM 01/01/03 TO 13/05/07) TOTAL UI TURNOVER :- 13,831 MU TOTAL UI AMOUNT DISBURSED:- 3,177 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
POWER GRID CORPORATION OF INDIA LTD.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006.
POWER GRID CORPORATION OF INDIA LTD.
Dr. Montek Singh Ahluwalia Dy. Chairman, Planning Commisson WELCOMES POWER GRID CORP. OF INDIA LTD.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
Overall National Grid Development: Constraints & Options
SOUTHERN REGION EXPERIENCE
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED
1 KADAMPARAI PUMP OPERATION GENERATOR MODE PUMP. 2 KADAMPARAI ENERGY GENERATED/PUMPED DURING LAST 5 YEARS (MU) MONTHS *
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
1 PRESENTATION ON FREQUENCY CONTROL AND FREE GOVERNOR OPERATION TO THE OFFICERS OF CENTRAL ELECTRICITY AUTHORITY On 4 th April, 2005 by V.K. Agrawal SRLDC,
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
UI IN SR (FROM 01/01/03 TO 12/08/07) TOTAL UI TURNOVER :- 14,596 MU TOTAL UI AMOUNT DISBURSED:- 3,434 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
ENERGY CONSERVATION IN SR - A CASE STUDY
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
REGIONAL GRIDS IN INDIA – QUICK FACTS
KADAMPARAI PUMP OPERATION
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
THE RPUF SCHEME KHAMMAM VIJAYAWADA NAGARJUNASAGAR HYDERABAD RAICHUR
An operational analysis of Kadamparai Pumped Storage Hydro Plant located in Tamil Nadu Sanyasi Naidu.
Presentation transcript:

1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL

2 PRESENTATION OVERVIEW  SR GRID - QUICK FACTS SR GRID - QUICK FACTS  KPTCL METERING LOCATIONSKPTCL METERING LOCATIONS  AVAILABILITY BASED TARIFFAVAILABILITY BASED TARIFF  OPEN ACCESS REGULATIONS – RECENT CHANGESOPEN ACCESS REGULATIONS – RECENT CHANGES  IMPACT OF CHANGES – CASE STUDIES IMPACT OF CHANGES – CASE STUDIES  STATE SECTOR – CHALLENGES & TASKS AHEAD STATE SECTOR – CHALLENGES & TASKS AHEAD

3 MORE LINKS  SCHEDULING PROCEEDURE SCHEDULING PROCEEDURE  DRAFT IEGC JUNE 2005DRAFT IEGC JUNE 2005

4 THANK YOU

5 SOUTHERN REGIONAL GRID QUICK FACTS

6 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :- 17,697 MW SOUTHERN :- 32,704 MW WESTERN :- 32,354 MW NORTH-EASTERN :- 2,357 MW TOTAL 116,342 MW REGIONAL GRIDS

7 SOUTHERN REGION – GEOGRAPHY ANDHRA PRADESH TAMIL NADU KARNATAKA KERALA POPULATION : CRORES ( 22% OF INDIA) AREA :- 651 (‘000 SQ KM)(19% OF INDIA) INSTALLED CAPACITY:- 32,734 MW(28.1%) PER CAPITA CONSUM. – 700 unit (A. I. – 567) WEATHER :- South-west monsoon North-east monsoon SEA COAST :- AROUND 4000 KM

8 INSTALLED CAPACITY IN SR The above capacity does not includes ---About 1342 MW of Wind Mill Capacity in Tamil Nadu. --- Micro and Captive plants in different states. AGENCYHYDROTHERMAL GAS/ DIESEL WIND/ OTHERSNUCLEARTOTAL AP KAR KER TN PONDI C. S IPP TOTAL10939 (33%)15880 (49%)3956 (12%)1099 (3%)830 (3%)32704

9

GENERATING UNITS IN SOUTHERN REGION A.P KAR TNKER GENERATORS ABOVE 1000 MW GENERATORS 500 – 1000 MW GENERATORS BELOW 500 MW TYPICAL GENERATOR SPREAD IN SR - HYDRO - THERMAL - GAS / NAPTHA - NUCLEAR UNIT CAPACITY APKARKERTNCGS TOTA L THERMAL (500 MW) 2810 THERMAL ( MW) GAS/THERMAL ( MW) HYDRO (>50 MW) TOTAL

11 LOAD MW LOAD MW TYPICAL LOAD SPREAD IN SR

KHAMMAM VIJAYAWADA NAGARJUNASAGAR VISAKHAPATNAM (POWERGRID) HYDERABAD RAICHUR GOOTY HOODY SALEM UDUMALPET TRICHUR MADURAI TRICHY MADRAS NEYVELI CUDDAPAH DAVANAGERE KAIGA RSTPP BHADRAVATI 130x2 164x x2 PONDICHERY BANGALORE SIRSI MUNIRABAD P P P P P P P P P P P P P P P N KOLAR PALLOM KAYANKULAM EDAMON TALCHER JEYPORE x78 2x HOSUR KADRA KODASAALY Nagjhari MAPS P SSLMM MMDP THIRUVANATHAPURAM ALMATHI NELLORE 400 KV LINE PRESENTLY OPERATED AT 220 KV NELAMANGALA KURNOOL GAZUWAKA(AP) SIMHADRI NTPC HIRIYUR x x2 221x2 146x2 52x2 197x2 301x2 8x4 15x ABOUT CKM 400KV TRANSMISSION TALGUPPA GRID MAP GRID FOCAL POINT SHIFTED TO KOLAR AFTER COMMISSIONING OF HVDC KOODANKULAM THIRNELVALI TYPICAL FLOWS ARE FROM NORTH TO SOUTH QUANTUM CHANGES IN FLOW PATTERN LIKELY AFTER COMMISSIONING OF KOODANKULAM 2000 MW

13 TYPICAL LOAD CURVE OF SR WINTER MONSOON SUMMER EVENING PEAK

14 GRID OPERATION TYPICAL ISSUES IN THE PAST

15 GRID OPERATION – TYPICAL ISSUES IN PAST LOW / HIGH FREQUENCY PROBLEMS –FREQUENCY EXCURSES TO LOW/HIGH VALUES LOW / HIGH VOLTAGE OPERATION –CRITICALLY LOW VOLTAGES AT LOAD CENTRES –SUBSTANTIALLY HIGH VOLTAGES AT FAR ENDS SYSTEM BROWNOUTS / BLACK OUTS –SEPERATION OF SYSTEMS / LOSS OF LOAD ECONOMIC IN-STABILITY / INCREASED ELECTRICAL LOSSES –UNRELIABLE / INEFFICIENT OPERATION OF EQUIPMENT

16 GRID PRESENT STATUS

< & < & < & Above MaxMinAvgFVI FREQUENCY DURATION CURVE , &

18 FREQUENCY PROFILE 2002, 2003 & 2004

19 FREQUENCY CURVE FOR 9 th SEPTEMBER 2004 FVI = 0.04 Avg Freq = 49.99Hz 10 * ∑ (F – 50) 2 FVI = * 60

20 REALITY BITE: FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!. EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED! COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES Jan 02 Jan 03

21 Voltage at Bangalore Jan 02 & 03

22 SOUTHERN REGION LOSS * **2005** LOAD (MW) LOSS (MW) LOSS % LOAD (MW) LOSS (MW) LOSS % LOAD (MW) LOSS (MW) LOSS % LOAD (MW) LOSS (MW) LOSS % AP KARNATAKA KERALA TAMILNADU PONDICHERRY CENTRAL GENERATING STATION SOUTHERN REGION *Source : Report of System Studies conducted for Accessing Shunt Compensation requirement in Southern Region – March 2004 and March SREB,CEA ** Projected figures 0.5% REDUCTION MEANS 100 CR ANNUAL SAVINGS 0.5% REDUCTION MEANS 100 CR ANNUAL SAVINGS

23 AVAILABILITY BASED TARIFF OPERATIONAL EXCELLANCE

24 DEEP VALLEY SHARP PEAK

25 KADAMPARAI PUMP OPERATION GENERATOR MODE PUMP SAVINGS OF RS 40 LAKHS EVERY DAY INVESTMENT OF 1600 CRORES SAVED

26 OPPORTUNISTIC UI TRADE POWER EXPORT TO WR ON UI BASIS DURING LOAD CRASH FREQ

27 OPERATION ON 31/08/03 (Ganesh Chathurthi) AMOUNT SAVED FOR SR CONSTITUENTS = 107 LAKHS 50 NOS HVDC SETPOINT CHANGES DONE TO ACHIEVE THIS!!!!!

28 FREE GOVERNOR MODE OF OPERATION ON 12-DEC-04 SHARAVATHI -1 FREQ DROP FROM HZ TO HZ i.e. ~ 0.45HZ

29 FREE GOVERNOR MODE OF OPERATION ON 12-DEC-04 SHARAVATHI -4 FREQ DROP FROM HZ TO HZ i.e. ~ 0.45HZ

30 SHARAVATHI GENERATION – TYPICAL DAY FREQ MW

31 OPTIMAL RESERVOIR UTILISATION SHARAVATHY / IDDUKI PLANT OPERATORS AT THESE STATIONS THINK OF THE RESERVOIR LEVEL IN RUPEES RATHER THAN IN FEET!!! Rs.

HZ

33 MERIT ORDER : UNITS BOXED UP POWER STATIONSTATE CAPACITY(MW) FUEL VARIABLE COST TATA DIESELKARNATAKA 79 DIESEL308 RAYALSEEMA DGPPKARNATAKA 27 DIESEL360 YELEHANKA DIESELKARNATAKA 128 DIESEL314 THANRBHAVIKARNATAKA 220 NAPTHA325 SUB-TOTAL 454 BRAHAMPURAM DPPKERALA 107 DIESEL275 BSESKERALA 157 NAPTHA308 KASARGODE PCLKERALA 22 NAPTHA298 KAYAMKULAMKERALA 360 NAPTHA322 SUB-TOTAL 646 BASIN BRIDGETAMIL NADU 120 NAPTHA584 P.P.NALLURTAMIL NADU 330 NAPTHA415 SUB-TOTAL 450 TOTAL 1550

34 UI IN SR (FROM 01/01/03 TO 07/08/05) OVERVIEW TOTAL UI TURNOVER : MU TOTAL UI AMOUNT DISBURSED: CR AVG WEEKLY TRANSACTION:- 67 MU AVG WEEKLY UI AMOUNT DISBURSED: CR

35 UI SUMMARY – 136 WKS FROM 01/JAN/03 TO 07/AUG/05) STATE --->APKARKERTNPON Total Net UI in MUs exported(-) / Imported(+) Total Net amount in Rs. Crores Receivable(-) / Payable(+) Average rate of UI in paise/unit

36 INTER-REGIONAL EXCHANGES DETAILS UPTO 136 WKS (Till 07-AUG-05) WRER Net Energy Transaction 231 MU IMPORT BY SR 703 MU IMPORT BY SR Amount Due to SR Constituents Rs Cr.Rs Cr. Amount Credited TO SR Constituents Rs Cr.Rs Cr.

37 GRID OPERATION: A TIGHT ROPE WALK BLACK-OUT VOLTAGE COLLAPSE IN-ECONOMIC OPERATION INSTABILITY POWER SWINGS INCREASED LOSSES

38 UI TRANSACTION ON 31/08/03 HIGHLIGHTS OF UI TRANSACTION ON (SUNDAY, GANESH CHATURTHI) UI imported from ER:6.07 MU UI imported from WR:2.81 MU Total UI imported from C. Grid by SR:8.88 MU Average UI rate of C.Grid : 93 Ps/Unit Average UI rate in SR for C.Grid:213 Ps/Unit Max. Power transfer in UI from ER:510 MW Max. Power transfer in UI from WR:350 MW Total Max. Power transfer in UI from C.Grid:860 MW Amount saved for the SR constituents :107 Lacs Total Number of HVDC Operations : 50 no.s

39 METERING LOCATIONS IN SR Total No Of SEMS in SR USED FOR REA 350 No.s Total No Of SEMS in KPTCL USED FOR REA 50 No.s SR METERING DIAGRAM

40 INTER STATE LINES METERING LOCATIONS

41

42 Karnataka's drawl in Raichur-Hoody section: Raichur = -(CK-21) -(CK-23) -(CK-25); Muniarabd=(CK-05) ; Davanagere=(CK-07); Hiriyur=(CK-15); Nelamangala= -(CK-29)-(CK-30)-(CK-35) -(CK-36) -(CK-38); Hoody = (CK-09)+(CK-13) RAICHUR SECTION

43 KPTCL'S DRAWL ON 400kV RAICHUR-DAVANAGERE SECTION (CK-RC)=-(CK-21)-(CK-23)-(CK-25) -(CK-29)-(CK-30)+ (CK-35)+ (CK-36) (CK-38) + (CK-05)+ (CK-07) +(CK-09) + (CK-13) + (CK-15) KPTCL'S DRAWL ON 400kV (CK-91)= (CK-01)+(CK-03)+(CK-RC) +(CK-11) CK'S DRAWL ON 220kV (CK-92)= -(CK-51)-(CK-53)-(CK-54)-(CK-55)-(CK-58)-(CK-59)+(KG-21) +(KG-22)+(KG-23)+(KG-24) CK'S DRAWL ON 132kV (CK-93)=-(CK-52)-(CK-56) TOTAL DRAWL (CK-94)=(CK-91)+(CK-92)+(CK-93) NOTE: SEMS ON FEEDERS NOT CARRYING ISGS POWER NOT TO BE CONSIDERED