Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.

Slides:



Advertisements
Similar presentations
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
Advertisements

NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
1 Texas Nodal Texas Nodal Program Implementation TPTF June 6, 2006 Agenda.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 5, 2009 Joel Mickey
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 6, 2008 Trip Doggett.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Lead from the front Texas Nodal 1 TPTF Update for TAC April 4, 2008 Trip Doggett.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 5, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 17, 2006.
July 06, 2006 – TAC Meeting 1 TPTF Update Trip Doggett.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
Protocol Revision Subcommittee Tom Burke June 7, 2012.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 6, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC January 4, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC June 26, 2008 Joel Mickey.
Lead from the front Texas Nodal 1 TPTF Update for TAC Nov 2, 2006 Trip Doggett.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
1 TAC Report to the ERCOT Board November 14, 2006.
Protocol Revision Subcommittee Tom Burke April 5, 2012.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 7, 2008 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC September 4, 2008 Stacy Bridges
Protocol Revision Subcommittee Tom Burke January 3, 2013.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC August 2, 2007 Trip Doggett.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Lead from the front Texas Nodal 1 Texas Nodal Ancillary Service Qualification Self-Certification approach ROS Discussion March 16,
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 2, 2008 Stacy Bridges
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
COMS Nodal Commercial Systems Project TPTF Meeting September 2007 Raj Chudgar.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
TPTF Update for TAC October 5, 2007 Trip Doggett
Presentation transcript:

Lead from the front Texas Nodal 1 TPTF Update Trip Doggett

Lead from the front Texas Nodal 2 Agenda ItemDescriptionPurpose 1. Meeting SummarySummary of recent TPTF activitiesFor review 2. Next MeetingsUpcoming activitiesFor review 3. Approval of Milestone Request TAC approval of Milestone – Business Requirements Complete for CO Real-Time AS Settlements CO RUC Settlements CO DAM Make Whole Settlements For Vote

Lead from the front Texas Nodal 3 Meeting Summary – August 7  Meetings August 7 & 8 and August 21, 22 & 23  On August 7, we discussed:  Proposed changes to Principles of Consistency Document that were proposed by joint ROS/TPTF Task Force, including proposed definition for Annual Planning Model.  Draft language to incorporate refined Annual Planning Model definition in Section (1).  On August 7, after voting unanimously to waive notice for the vote, TPTF approved the refined Annual Planning Model definition in Section (1) by a unanimous voice vote.  On August 7, after voting unanimously to waive notice for the vote, TPTF approved the changes to the Principles of Consistency Document by a unanimous voice vote.  Draft Nodal PRRs  On August 7, TPTF approved a draft NPRR for changes to Sections 1, 6, and 10 to address net metering concerns in the nodal market. The draft Nodal PRR was approved by a ballot vote of 100% in favor, with one abstention by CenterPoint Energy. The Cooperative and Independent Generator segments were not present. This draft NPRR will be sent to PRS.

Lead from the front Texas Nodal 4 Meeting Summary – August 7 (continued)  On August 7, we discussed:  Draft Nodal PRRs  Discussed a proposed NPRR from the ERCOT Modeling Group to clarify required tests of the Network Model.  ERCOT agreed to meet with individuals having concerns with the document, offline, and circulate an updated version of the NPRR for consideration at our next meeting.  ERCOT protocol clarifications  Discussed the treatment of block Offers in the Market Management System and ERCOT agreed to discuss the possibility of Relaxed Mixed Integer Programming with the vendor.  Reviewed the words in (3) and agreed the words should be revised to say QSE trades should be posted in the MIS Certified Area, not the MIS Secure Area. ERCOT will prepare a draft NPRR to correct.  Discussed whether ERCOT is expected to notify QSEs if their Base Point is based on a mitigated Offer. Agreed this is not a requirement.

Lead from the front Texas Nodal 5 Meeting Summary – August 7 (continued)  On August 7, we discussed:  ERCOT protocol clarifications  Discussed Combined Cycle power augmentation methods in (9) and recommended ERCOT discuss with Randy Jones before returning decisions to TPTF  Discussed the use of Generic Cost of energy in RUC, 5.5.2(4) versus the use of Energy Offer Curves. ERCOT will bring a draft NPRR for TPTF consideration.  ERCOT asked if an Energy Offer Curve should be mandatory for RUC committed units. ERCOT will study further before bringing a NPRR to TPTF  Discussed the use of telemetered ramp rate, versus ramp rate provided through registration, in SCED. ERCOT will research further and bring a recommendation to TPTF.  Discussed whether a unit committed in DAM should be required to show the unit ON in their COP before RUC execution.

Lead from the front Texas Nodal 6 Meeting Summary – August 8  On August 8, we discussed:  Draft Nodal PRR  Discussed how to settle CRRs when the DAM fails to execute. Provided direction to ERCOT to draft a NPRR using no deration.  Discussed options for CRR block sizes.  Reviewed draft NPRR for Section to prohibit Unbundled TSPs, DSPs, and ERCOT employees from owning CRRs  On August 8, approved changes to Section to prohibit Unbundled TSPs, DSPs, and ERCOT employees from owning CRRs by a unanimous voice vote.  Reviewed formatting changes proposed by ERCOT Market Rules for Section

Lead from the front Texas Nodal 7 Meeting Summary – August 8 (continued)  On August 8, we discussed:  Changes proposed by ERCOT Market Rules for Section  Commercial Operations Business Requirements Schedule  Eligibility Scenarios for Make-Whole and RUC  Training Update  Initial Overview of Real-Time AS Commercial Operations Business Requirements Document  Initial Overview of RUC Settlement Commercial Operations Business Requirements Document  Draft Nodal PRRs  Reviewed draft NPRR to address settlement issues with net metering in the nodal market.

Lead from the front Texas Nodal 8 Meeting Summary – August 21  On August 21, we discussed:  Net Metering  Reviewed draft Net Metering NPRR with language changes in Sections 1, 3, 6, and 10.  On August 21, TPTF approved draft Net Metering Nodal PRR by a ballot vote of 100% in favor, with abstentions by CenterPoint, Occidental, and Exelon. All market segments were present. This draft NPRR will be sent to PRS.  ERCOT discussed the association of EPS metering points to an electrical bus and concluded no additional protocol language was needed to allow ERCOT to map these relationships.  EMS Business Requirements Review  Initial review of State Estimator  Initial review of Forced Outage Detection  Initial review of Load Frequency Control

Lead from the front Texas Nodal 9 Meeting Summary – August 21 (continued)  On August 21, we discussed:  ROS Update  Update on ROS approval of ROS/TPTF Task Force recommendations on Principles of Consistency document  Approval of draft NPRR for Annual Planning Model definition in Section  On August 21, TPTF approved draft NPRR for Annual Planning Model definition in Section by a unanimous voice vote. This draft NPRR will be sent to PRS.  Discussed ROS comments on Section 5.5.1(5). The consensus of the group was to recommend using a reference to the Operating Guides instead of duplicating Operating Guide language in the Protocols.  On August 21, TPTF approved comments on Section 5.5.1(5) by a ballot vote of 90% in favor, with one negative vote by Garland and abstentions by CenterPoint and TXU Energy. All market segments, except Consumers, were present. These comments will be sent to TAC.

Lead from the front Texas Nodal 10 Meeting Summary – August 22  On August 22, we discussed:  MMS Project Issues Review  Ancillary Service/Energy Modeling  Block Offer Modeling and Pricing  Submission of Bilateral Trades  Overlapping Offers/Bids  Hot/Intermediate/Cold Startup Offer  Offer/Bid Validation Timeline  Offer/Bid Expiry Time  Market Information System  MIS Update  ERCOT Clarification to Section 12.3(d)  Training Update  Draft NPRR for CRR Settlement without DAM

Lead from the front Texas Nodal 11 Meeting Summary – August 22 (continued)  On August 22, we discussed:  Commercial Systems Requirements Schedule  Initial overview of Real-Time Energy Settlements Business Requirements Document  Review of comments received on Commercial Operations Real-Time AS Settlement Business Requirements Document  On August 22, TPTF approved Real-Time AS Settlement Business Requirements by a ballot vote of 100% in favor, with abstentions by GEUS, CenterPoint Energy, Calpine, City of Dallas, Occidental, and Residential Consumers. All market segments were present.  Review of comments received on Commercial Operations RUC Settlement Business Requirements Document  On August 22, TPTF approved RUC Settlement Business Requirements by a ballot vote of 100% in favor, with one abstention by CenterPoint Energy. All market segments were present.  Review of comments received on Commercial Operations DAM Make Whole Settlement Business Requirements Document  On August 22, TPTF approved DAM Make Whole Settlement Business Requirements by a ballot vote of 100% in favor, with abstentions by CenterPoint Energy, Occidental, and Residential Consumers. All market segments, except cooperative, were present.

Lead from the front Texas Nodal 12 Meeting Summary – August 22 (continued)  On August 22, we discussed:  Draft NPRRs related to CRRS  Draft NPRR to address hourly granularity of bilateral trades  On August 22, TPTF approved a draft NPRR to limit CRR trading, registered through ERCOT’s CRR system, to time-of-use blocks for any number of days. The draft NPRR was approved by a ballot vote of 100% in favor, with abstentions by City of Garland and Calpine. All market segments, except cooperative, were present. This draft NPRR will be sent to PRS.  Draft NPRR to address ability to offer 24-hour blocks  On August 22, TPTF approved draft NPRR to specify that CRR awards and allocations of a one-month strip in a 7x24 block will be split into one-month strips of the three other blocks (5x16, 2x16, 7x8). Each of these three blocks may be offered into subsequent CRR Auctions as separate block offers but not as a single 7x24 block. The draft NPRR was approved by a ballot vote of 83.3% in favor, with one negative vote by TXU Energy and abstentions by NRG Texas, Calpine, City of Dallas, Residential Consumers, Stream Energy, StarTex Power, Strategic Energy, Accent Energy, Cirro Group, and Reliant. All market segments were present. This draft NPRR will be sent to PRS.

Lead from the front Texas Nodal 13 Meeting Summary – August 23  On August 23, we discussed:  Nodal Program Update  TXMAC Timeline  On August 23, TPTF approved TXMAC Timeline as being in compliance with the protocols by verbal affirmation, with no abstentions. All market segments were present.  Network Model Testing Clarification - Section  On August 23, TPTF approved Network Model Testing draft NPRR as modified by TPTF for Sections and by a unanimous ballot vote of 100% in favor with no abstentions. All market segments were present.  Review PRS Remand of NPRR018, Separate LaaR and Generator MCPCs for RRS, for completeness  Default QSE / LSE Scenarios and NPRR Draft for Synchronization of PRR624

Lead from the front Texas Nodal 14 Next Meetings  Next meetings  Tuesday, September 5 and Wednesday, September 6  Monday, September 11 and Tuesday, September 12  Wednesday, September 27 thru Friday, September 29  On September 5&6, will be discussing Program Timeline and Budget.  On September 11&12, will be discussing:  Draft NPRR on CRR Settlement without DAM  Draft NPRR for Synchronizing PRR624 (Clarification of MP Default Language)  Commercial Operations Business Requirements:  Initial Overview of RMR, Voltage Support, Black Start, Emergency Operations Settlement Commercial Operations Business Requirements Document  Review of comments received on Real-Time Energy Settlements and DAM/RUC Eligibility Commercial Operations Business Requirements Documents  EMS Business Requirements:  Initial Overview of second round of EMS Business Requirements Documents  Review of comments received on Forced Outage Detection, State Estimator, and Load Frequency Control EMS Business Requirements Documents

Lead from the front Texas Nodal 15 TAC Approval of Milestone  On August 22, TPTF approved Real-Time AS Settlement Business Requirements by a ballot vote of 100% in favor, with abstentions by GEUS, CenterPoint Energy, Calpine, City of Dallas, Occidental, and Residential Consumers. All market segments were present.  On August 22, TPTF approved RUC Settlement Business Requirements by a ballot vote of 100% in favor, with one abstention by CenterPoint Energy. All market segments were present.  On August 22, TPTF approved DAM Make Whole Settlement Business Requirements by a ballot vote of 100% in favor, with abstentions by CenterPoint Energy, Occidental, and Residential Consumers. All market segments, except cooperative, were present.  The Transition Plan says: “Any declaration of the accomplishment of a major milestone (business requirements, conceptual design, and successful completion of Market Participant testing) or a decision to proceed is contingent on the approval of both ERCOT and TAC.”  Request that TAC approve the milestones  Approval of Real-Time AS Settlement Business Requirements  Approval of RUC Settlement Business Requirements  Approval of DAM Make Whole Settlement Business Requirements

Lead from the front Texas Nodal 16 Questions