7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Status of the CSC Track-Finder Darin Acosta University of Florida.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
DCFEB Production for LS2
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
Regional Cal. Trigger Milestone: Major Production Complete
The Ohio State University
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
B904 Status Report by Fred B.
Fred’s Input to Rice Workshop
Configuring the Peripheral Crates
Sector Processor Status Report
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Plans for the 2004 CSC Beam Test
Prepared for CSC by Fred Borcherding FNAL
CSC Status Report Status reports;
CSC Electronics Installation and Commissioning CSCE I&C
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
CSC Electronics Problem Report CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
CSC Shift Training and Operation + B904 Status
Presentation transcript:

7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description: Plans for mitigation of detected issues. Plans for use of the CMS Electronics Integration Center in building 904 when CMS data taking starts (extremely limited debug possibility at Pt5) Prepared by Fred Borcherding for the CMS CSC group

7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 2 Plans for Mitigation of Detected Issues Work to present detector –Following Slides taken from Greg’s ‘CSC commissioning “To Do” list’ –Hardware –Control and Monitoring –Firmware –CSC TF

7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 3 Hardware High Voltage –Replace all resistors >January – April 2008 Big project – about 10,000 channels Replace resistors that have failed to maintain their specification Will require a ‘few’ technicians for a ‘few’ months Set up ‘production’ area at ISR former clean room area –‘Normal’ inventory of to-be-fixed is small because replacement and repair has quickly followed failure Electronics with problems > What boards have problems? –On-chamber FE Electronics Boards Inventory of to-be-fixed has built up because of very limited access to chambers We have access scheduled by TC as the disks are opened Special planning is underway to optimize and expedite the changes –Off-chamber FE Electronics Boards Inventory of to-be-fixed is small because replacement and repair has quickly followed failure –S1 Electronics Inventory of to-be-fixed is small because replacement and repair has quickly followed failure

7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 4 Control and Monitoring DCS –Move to XMAS monitoring High Priority—does not affect running –Make all HV (ME1/1), LV, and temperature values written to database High Priority—does not affect running –Make database reading work on above values –Move to Web-Based-Monitoring as the “friendly” way to monitor DCS –Establish procedure for bringing a Maraton online. Right now seems to need 1) ID written by RS-232, 2) power-cycling OPFC to re-establish communication with Maraton, 3) values written to Maraton “by hand” –Move to Windows on all machines –Move to PVSS starting as a service Simultaneous move away from VNC as a User Interface Verify Maraton mapping Augment robustness of CANbus communication with Maratons –Computer controlling Maraton is rebooted, causing the CANbus communication to fail. The only method CSC has to get out of this situation is to POWER CYCLE the OPFC’s. This is much too invasive. Add temperature monitoring to cavern CSC racks –Add temperature monitors to water manifold and internal spaces and connect to Rack DCS If-then action matrices Configuration from database –Needs to be tested and “perl script” functions implemented FED software –Exception Handling High Priority —may affect running… to be discussed…

7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 5 Firmware Firmware updates –TMB: ME1/1A readout but not trigger, QPLL “lock-loss” counter –MPC: LCT0/LCT1 correct ordering –ALCT: Force L1A receipt window to be an odd number –DMB: –TF Sector Processor: Reintroduce capability to delay CSC trigger stubs to send to DTTF Firmware loss from PROM’s –Needs to be characterized, as well as implement a short-term (and long-term) fix…  Partially done 4 October 2008

7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 6 CSC TF TF Hardware—power needed Fiber work [DW, GP] –Install new longer DDU-SP link fibers (stored in back of rack) –Re-routing of trigger fibers so that single SPs can be removed more easily –Increase in number of Velcro support points and attention to stress reduction for most loaded fibers in bundles (advice fiber guys) Synchronization of orbit counter (OC0) [DW, LU, GR] Fine delay scan of TTC-rx –Fine tuning of trigger links to be centered in phase CSC TF Firmware Tests and studies—power needed Test of firmware with halo muon trigger delay and CSC stub delay [DW, GP] Systematic accounting of link errors [DW, GP, LU] –Listing, frequency, improvement with cleaning? Improvement with re-sync?, and procedures to mitigate… Possibly caused by implementation of TTCrxFineDelay?  DONE: 21 October Appears to have been fixed with SP firmware update. See

7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 7 Plans for use of the CMS Electronics Integration Center in B904 Working Test Stand at B904 Cosmic Test Stand »twiki.cern.ch/twiki/bin/view/CMS/CSCCosmicSlice –2 racks occupied, plus computers in #30, & space down front –Chamber, Peripheral crate, FED crate - all installed –Computers & software - installed –TF and TTC crates + electronics + software – all installed –HV and Gas – last part need for full utilization - in process >> HIGH PRIORITY LV Test Stand –Now at ISR –Move to integration row -> 1 rack plus LV resistor cable layout HV Test Stand –Now at ISR –Move date and details TBD (2 racks)

7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 8 Plans for use of the CMS Electronics Integration Center in B904 (2) Storage of spare chambers – early ’09? –Present storage space in ISR will be lost – P5 may not have enough space Build ME4/2 CSC’s – spring/summer ‘09 –Parts kitted in US –Chambers assembled and tested at CERN Require large area > plan for B904? Modify ME1/1 chambers –Modify to remove wire ganging to regain finer segmentation –Work done at same area as 4/2’s?? Work done at Pt5? Surface? Build upgraded electronics for ME1/1 chambers Present on-chamber and off-chamber FE electronics moved to ME4/2 –New version of on-chamber CFEB boards New technology to put more channels on same footprint New readout to send increased data in same time footprint –New version of DMB, DAQ Mother Board, to receive and pass on additional data –New version of TMB, Trigger Mother Board, to receive and pass on additional data –Final pre-installation Board and System testing to be done at B904

7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 9 B904 Lab Have installed a board repair facility in the CSC lab in B904 –Soldering station –Parts … Have board test station –Has been in place Most spare boards and other electronics HW is stored at B904