US CMS DOE/NSF Review, 19-21 May 2003 - Trigger Plenary - W. Smith1 WBS 3.1 - Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.

Slides:



Advertisements
Similar presentations
CMS Trigger System J. Varela LIP/IST-Lisbon & CERN
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Sector Processor – to – Muon Sorter tests M.Matveev Rice University January 8, 2004.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Jay Hauser, Fermilab Director’s Review, Apr. 30, CSC Muon Trigger Jay Hauser Director’s Review Fermilab, Apr 30, 2002 Outline The CSC muon trigger.
P. Chumney, U. Wisconsin, CHEP, March 2003 CMS Regional Calorimeter Trigger - 1 Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski,
CSC Muon Trigger September 21, 2004 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Paul Padley.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
CHEP March, B. Scurlock, University of Florida1 D. Acosta, V. Golovtsov, M. Kan, A. Madorsky, B. Scurlock, H. Stoeck, L. Uvarov, S.M. Wang University.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
DOE/NSF Review May 8-10, US CMS US CMS Detector Project Overview Dan Green US CMS Project Manager DOE/NSF Lehman Review, May 8-10, 2001.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
P. Klabbers, U. Wisconsin, LECC September 2006 CMS Regional Calorimeter Trigger - 1 Integration of the CMS Regional Calorimeter Trigger into the Level-1.
W. Smith, U. Wisconsin, IEEE, November 1, 2006 CMS Regional Calorimeter Trigger - 1 The CMS Regional Calorimeter Trigger Electronics Integration W. H.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
Muon Track-Finder Trigger
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
University of California Los Angeles
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review May 19, 2003 This talk is available on:

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith2 OutlineOutline Overview of Calorimeter Trigger Calorimeter Trigger Status & Plans Overview of Muon Trigger Muon Trigger Status & Plans Cost and Schedule Performance Transition to M&O Concerns Summary and Conclusions

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith3 Detector Frontend Computing Services Readout Systems Filter Systems Event Manager Builder Networks Level-1 Trigger Run Control Trigger & DAQ Systems Level-1 Trigger Requirements: Input: 10 9 events/sec at 40 MHz at full L = Output: 100 kHz (50 kHz for initial running) Latency: 3  sec for collection, decision, propagation

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith4 L1 Trigger Hardware Overview US CMS Trigger (this talk) US CMS fully responsible US CMS partially responsible

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith5 Calorimeter Trig.Overview (all located in underground counting room)

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith6 160 MHz point to point backplane (proto. tstd.) 18 Clock&Control (proto. tstd.), 126 Electron ID (proto. tstd.), 18 Jet/Summary Cards -- all cards 160 MHz Use 5 Custom Gate-Array 160 MHz GaAs Vitesse Digital ASICs Phase, Adder, Boundary Scan, Electron Isolation, Sort (manufactured) Calorimeter Trigger Crate Spares not included* Data from calorimeter FE on Cu 1.2 Gbaud Into 126* rear Receiver CardsInto 126* rear Receiver Cards Prototype tested w/ ASICsPrototype tested w/ ASICs

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith7 Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver Card accept 4 x 20 m 1.2-Gbaud copper pairs transmitting 2 cal. tower energies every 25 ns with low cost & power. Uses Vitesse Link Chips ( ). Full quantity of mezzanine link cards (1422) being manufactured. New Serial Link Test Card Status: tested and full production manufactured, New cables,cards, 48V PS, and support software, delivered to CERN in Feb ‘03, operating in ECAL electronics lab stably with no errors

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith8 Cal. Trig. Receiver & Electron Isolation Cards - U. Wisconsin DC-DC Adder mezz link cards BSCAN ASICs PHASE ASICs MLUs RC & EIC Pre-production Boards validated Production started 8 RC and EIC Boards being assembled for full crate test before rest of boards are assembled Production of 5 Custom ASICs complete -- all validated pending EISO full-crate patterns SORT ASICs EISO Receiver Card Electron Isolation Card SORT ASIC

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith9 Cal. Trig. Jet/Summary Card - U. Wisconsin Full function prototype manufactured and under test Uses SORT ASICs to find top four e/ , threshold for muon bits Absorbs HF functionality with Rec. Mezz. Card Receiver Mezz. Card BSCAN ASICs Sort ASICs BSCAN ASICs Phase ASIC

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith10 Testing Receiver, Clock, EISO, & Jet/Sum Cards, Crate & Backplane - U. Wisconsin  160 MHz TTL clock with data into 200 MHz Memories (2 ns scale) Rear: Rec. Card Loop- back Cables for testing Data Sharing Front: Clock, EISO, and Jet/Summary Cards showing original STC and cable to test HF data transfer to J/S at full speed

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith11 CSC Muon Trigger Overview CSC CFEB ALCT 1 of 24 CFEB 1 of 2 LVDB LV Distribution Board 1 of 5 Anode Front-end Board Cathode Front-end Board Anode Local Charged Track Board MPCMPC DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB CCBCCB CONTROLLERCONTROLLER Peripheral Crate on iron disk Slow Control Muon Track-Finder Crate in underground counting room: Sector Receiver/Processor + Muon Sorter + Clock & Control Board Trig Motherboard DAQ Mother- board Muon Port Card Clock Control Board Optical Link (red = trigger responsibility)   Start w/ wire & strip segment combinations: Wires:25ns bunch xing Strips: precision  Form “Trigger Primitives” Link into tracks Assign p T, , and  Send highest quality tracks to Global L1

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith12 Strip FE cards Wire FE cards Muon Port Card (Rice) MPC Sector Receiver/ Processor (U. Florida) OPTICAL SR/SP SP CSC Muon Sorter (Rice) Global  Trigger DTRPC FE Global L1 2  / chamber 3  / port card 3  / sector 44 44 44 44 LCT Trigger Motherboard (UCLA) Wire LCT* card In counting house TMB LCT RPC Interface Module RIM On-Chamber Trigger Primitives 3-D Track-Finding and Measurement Combination of all 3 Muon Systems CSC Muon Trigger Scheme EMUTrigger *Local Charged Track

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith13 CSC Trigger Muon Port Card - Rice Mezzanine card TLK2501 serializers Optomodules GTLP Receivers VME Interface (glue logic) 6 Boards fabricated and assembled. Passed stand-alone tests Passed communication tests with Trigger Mother Board Tests with Track-finder are underway Tests with time structured test beam on-going at CERN

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith14 CSC Trigger Sector Receiver/ Processor Under Test - U. Florida 3 SRs Optical Transceivers 15 x 1.6 Gbit/s Links Front FPGA TLK2501 Transceiver Phi Local LUT Eta Global LUT Phi Global LUT EEPROM VME/ CCB FPGA DC-DC Converter To/from custom GTLP back- plane Mezz. Card Xilinx Virtex ~800 I/O

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith15 VME/JTAG INTERFACE GTLP BACKPLANE INTERFACE MEZZANINE CARD (same as used by Sector Recv/Proc) Contains Sorter Logic LVDS DRIVERS AND SCSI-3 CONNECTORS CSC Trigger Muon Sorter - Rice SHIELDED TWISTED PAIR CABLES TO GMT CRATE 4 Boards in hand, one assembled & under test with dedicated crate, test w/track-finder next

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith16 US Trigger Status Pre-production prototypes completed & under test Production starting Contingency for production problems, testing difficulties or unanticipated integration tasks

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith17 Recent Trigger Milestone Performance (v33) Prototypes performed sufficiently to serve as pre- production Production will proceed on schedule

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith18 US Trigger Project Resources Engineering demand remains significant thru installation & commissioning start

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith19 Trigger Transition to M&O Installation in Underground Counting Room Expect access by March ‘05 Sufficient time for installation and some testing but not for completing commissioning with detectors Need to start commissioning earlier Slice Test (on surface) With Both HCAL and EMU Verify trigger functions and interfaces by testing with detectors on surface at CERN. Use as substitute for commissioning completion step. Will check as much on surface before gaining access to underground facilities. Milestone (HG1018) planned for completion November ‘04

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith20 US Trigger Transition to M&O Production ordering underway. M&O starts with slice test

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith21 US Trigger M&O Resources Testing & Operation of Trigger System Changing conditions  modifications

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith22 US Trigger FY03 Planning Largest costs: production parts orders Engineering costs for testing/final revisions

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith23 ConcernsConcerns Installation Schedule Time for installation & commissioning tight (sched. delay) Significant time needed for integration in a synchronous pipelined system Use slice test to advance installation & commissioning Base Program Manpower Major effort on trigger software required Tasks include board testing, monitoring/controls, diagnostics, configuration downloading and documentation, modeling, physics simulation, etc. Major effort on testing & installation Planned as activity of base program manpower New Major Effort on “Slice Test Also needs base program manpower Recent DOE University program augmentation is a big help

US CMS DOE/NSF Review, May Trigger Plenary - W. Smith24 Conclusions - Trigger Calorimeter Trigger All Preproduction Boards tested Production started Most parts ordered, ASIC production finished Integration tests: ECAL started, HCAL starts this Fall Muon Trigger All Pre-production boards built & under test Basic stand-alone tests complete Integration testing between boards has started Integration tests starting this month w/EMU Operation in 25 ns structured beam Project Completion Transition to M&O Slice Test