Stave 4028 Thermal tests Electrical tests. 4028: THERMAL TESTS We have studied the effect of the liquid speed on the modules heating. Test 1: all 13 modules.

Slides:



Advertisements
Similar presentations
Daikin Altherma™ Troubling Shooting
Advertisements

Refrigerators.
Profitability and Risk Management 1 Theory of Constraints Let’s go back to the CVP model: What “constrains” your profit? If you can choose X to be arbitrarily.
1 Burn-in Viewer User’s Guide Version 2.0 February 17, 2005 LukasTomasek
QUAD MODULE TESTING 18 th January 2013 Kate Doonan University of Glasgow.
Thermal Enforcement Matt Reznicek Tim Croyle Scott Nedrow.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
Motherboard AKA mainboard, system board, planar board, or logic board. It is printed circuit board found in all modern computers which holds many of the.
By: Clara Miles and Jarrick Lumma.  The motherboard is the main circuit board of the system unit. It can also be called a system board.  It contains.
Comparison of cooling services at barrel end Description SCT Barrel Upgrade ID barrel one end one end Total number of staves/rows 176 Staves/rows serviced.
Cooling of power semiconductor devices
PAX DETECTOR THERMAL SIMULATION 1Vittore Carassiti - INFN FEFz-Juelich, 27/10/2008.
COMPUTER MAIN PARTS. softwared HARDWARE 8 COMPONENTS.
Disk testing - status. Disk Test Setup we use similar setup as the one used for sector tests, only simplified (no C6F14 cooling system, no source test,
Heat load study of cryomodule in STF
Electric Circuits For a continuous flow of electrons, there must be a complete circuit with no gaps. Electric Circuits.
University of Miskolc Department of Mechanical Engineering Modelling of Laser Surface Treatment Tutor: Dr. Mária Kocsis Báan Consultant: Mr. Reza Roshan.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
VTT ASSEMBLY 5 CHARACTERISATION KATE DOONAN & RICHARD BATES 2012.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / 2004 Module Loading TF - Genova Site G. Darbo - INFN / Genova November 25, 2004.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Cooling Systems. High temperatures can shorten the life expectancy of electronic components. High temperatures can shorten the life expectancy of electronic.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Genova Site - Report at SQTF G. Darbo - INFN / Genova SQTF, January 2005 Genova Site Report C.Gemme, G. Darbo, V.Kostyukhin INFN / Genova Copy of.
Loading stave 4000  Receiving test of modules : No problem despite some damages at one edge of few modules (AMS) One MCC failure in one module, reworked.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Estimated total mass of new Beam Pipe and IBL package Y. Gusakov 3/2/2010.
COOLING BY EVAPORATION OF PERFLUOROCARBONS Why evaporate? 1. To enhance the heat transfer per unit area The heat transfer coefficient increases significantly.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Electrical Measurements on stave S4028 Claudia, Fabrizio, Illona After loading, we have done a quick test (RECV) using a single module setup (MAC-based)
GTK Controls and Safety Thermal results with the ceramic heater Kaitlin Howell, Georg Nüßle, Paolo Petagna,
Conductors & Resistors
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
* Materials that allow heat, electricity, or sound waves to pass through them.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Liverpool March 09 Irradiation Meeting. Graham Beck (QMUL) 1 Dissipated Power: Sensor (at -10C, 200V bias, after protons/cm 2 ) ~ 1W (×3 for.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Rosario Turrisi INFN Padova
Module Loading Task Force Meeting October 21, 2004
Blower-/Fan Coil-Actuator
States of Matter Matter commonly occurs in one of three “states”
Draught Finder Trevor Clark 8. Thermal Infrared Inspections
DAQ for ATLAS SCT macro-assembly
Barrel TRT Module Cooling
Aachen Status Report: CO2 Cooling for the CMS Tracker
Happy Christmas! Tianqi Gao Supervisor, Prof Cinzia Da Via
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
From: Vapor Chamber Acting as a Heat Spreader for Power Module Cooling
Heating and Cooling, the art of Thermal Energy
The Stave Thermo-Conductivity QC Procedure Idea
MATHEMATICS Holiday Homework
Update of US Testing Status
US Module Production Quality
Resistance AIM: Understand resistance, calculate resistor values and know the characteristics of different types of resistors PRIOR KNOWLEDGE: Understand.
Module production in Italy
Aachen Status Report: CO2 Cooling for the CMS Tracker
GLAST Large Area Telescope:
US Module Testing Progress Report
Setup for testing LHCb Inner Tracker Modules
Tests of Endcap capillary & Heat exchangers at CERN
Objective of todays leacutre
Comparison of cytomegalovirus (CMV) load in urine samples of newborns with congenital CMV infection with respect to the changes in MRI findings. Comparison.
Presentation transcript:

Stave 4028 Thermal tests Electrical tests

4028: THERMAL TESTS We have studied the effect of the liquid speed on the modules heating. Test 1: all 13 modules are powered and configured (SURF and ROD): about 50 W Test 2: measure of (  T/power) for each module powered one at a time (only half stave - SURF). Is it possible to set a threshold for the variable  T/power as we have done until now indipendently of the cooling variables?

General conditions We are using 2 indendent circuits to cool down the stave and the box T_CoolingStave= -20C T_CoolingBox = -6C T_InsideBox = 3C Speed of the cooling inside the Al pipe set to 1 (slow), 4, 8 (fast).

Test 1: all modules powered Test 2: modules powered one at at time Example of monitoring on 4 modules…

Example of temperature monitoring on 4 central modules… Test 1: all modules powered Test 2: modules powered one at at time Speed 4 Speed 1 Speed 8 Speed 4 Speed 1 Speed 8

Results of Test 1 (all modules on) Cooling direction When speed is low 1 -4, there is a significant increase of temperature along the stave (Tmax –Tmin 10C!) A better uniformity is achieved incresing the cooling speed (Tmax –Tmin 4C)

How cooling speed change the  T/power?

4028 Electrical tests LOAD/STAVE tests are performed using 2 SURF boards. Comments: In the STAVE macro with respect to the list, it is not included DVDD scan as DVDD is not controlled by TDAQ anymore but by ambush. The scan can be done modyfing the ambush script but… Threshold scan with HV off with SURF is sometimes very different from scan HV off with MAC (due to my SURF or my script??)….see slides 10-11

Example of T monitoring during STAVE test: MODULES 7-13 TEMPERATURE 7 hours for half stave (source excluded) Cooling flow Test Test Test Module Test direction

HV off with SURF or with MAC Noise ~400e!

Then the analysis finds Unconnected bad pixels with this low rows peculiar pattern!

Electrical tests analysis STAVE\FLEX Comparison done using the “official” STAVE cuts without cut on HVoff data (as there is the source scan). LOAD\BURN comparison done with the official LOAD cuts (but some fake problems as HVoff is unusually good) The two modules with pre-existing large defects increase the number of bad pixels during loading and cycles. In 2 modules new small defects (about 20 pixels) are visible between chip 4 and 5 after loading.

Bad pixels New Defect between 4 and 5 Increasing in pre-existing defects

M2a and M4a There after loading: is there anything that can damage that point?

M5a Increasing both in loading and cycling

M6A Increasing mainly in loading