Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.

Slides:



Advertisements
Similar presentations
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Advertisements

Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
CLOUD Financial Review Committee meeting #3 1 October 2014 Financial plan for 2014 and beyond 1 Oct 2014, indico: rd FRC meeting, Antti Onnela,
RPC M&OB status Pigi Paolucci. Summary 2010 Cash Contributions foreseen CHF 2010 Expenditures (2009 carry over) CHF Present Income Balance.
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
Link Board Upscope Frascati group Napoli group Warsaw group.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
LV and HV status of the RPC system RPC detector and trigger group.
Financial Matters Ferdinand HAHN. Content Cost to completion (exceptional MOF 2014/15) MOF in 2013 (Budget – Contributions - Expenses) MOF in 2014 (Budget.
Run Coordination Report 4th RPC General Meeting (CMS week) Luigi BENUSSI, Hassan SHAHZAD, Nicolas ZAGANIDIS.
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Financial Matters Ferdinand HAHN. Content Short Reminder: Definition of Maintenance and Operation Fund (MOF) in the MoU MOF in 2011 (Budget – Contributions.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Outline Overview of Activities FY 09 Budget  Changes since baseline budget Fall ’08. FY 09 Budget Status Mid-year Review  FY 09 so far.  Projection.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
Scrutiny Group Meeting, May 30, 2006 A. Petrilli, 24 May 2006.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
RRB Scrutiny Group Meeting A. Charkiewicz, 11 June 2014 M&O-A and Upgrade Budget Issues.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.
Most Common Fund spending now goes on infrastructure. In the course of next year, essentially all the remaining funds will be spent on finishing the sub-detectors.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
CMS Muon detector from LHC to HL-LHC Pigi Paolucci INFN Napoli 1P. Paolucci (CMS group of Napoli) - Jan 2015.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
P. Paolucci G. Pugliese M.Tytgat
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Production ad Quality control of RPCs for the CMS muon barrel system
RPC Barrel HV & LV system Lappeenranta University
HCAL M&O-B Budget CMS Finance Board
for the transition region on behalf of the RPC upgrade group
Francesco Forti University and INFN, Pisa
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Pierluigi Paolucci - I.N.F.N. Naples
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
Resistive Plate Chambers performance with Cosmic Rays
RPC Detector Control System
Presentation transcript:

Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1

RPC detector and operation 2 Very low, stable dark current and noise rate: no detector performance deterioration Key of success: clear procedures for prompt intervention during all beam-off access time Double gap RPC chambers = 912 Barrel 480: 4 stations, 5 wheels, 12 sectors End-cap 432: 2 x 3 stations, 2 rings, 36 sectors) - RPC low eta upgrade in : 144 chambers 18 institutions in 2012 (97 RPC authors), 2 new institutions in 2013 Operating channel: about 98.2%, downtime was only 1.08% (stably in the years) More than 98% of the chambers with average efficiency > 95% and cluster size ~ 1.8. The RPC system was able to cope with the increased luminosity: average rate ~ 3-6 Hz/cm2 (barrel- endcap), the maximum rate reached in the end-cap was 35 Hz/cm2 RPC strips = HV LV channels During 2012 RPC system has been operating very smoothly with high performance 2

Pigi Paolucci & Anna Colaleo – RPC project Pigi Paolu cci & Anna Colal eo - RPC proje ct 3 Dott. Pigi Paolucci - I.N.F.N. of Napoli (ITALY) - Symposium on Collider Physics at Seoul (Korea) 3 Belgium CERN Bulgaria CHINA2 KOREA16 INDIA4 BELGIUM10 COLOMBIA2 N. Puebla3 PAKISTAN6 EGYPT3 CERN4 ITALY28 BULGARIA12 Georgia2 TOTAL97 RPC collaboration BarrelItalyBulgariaChinaColombia EndcapKoreaPakistanChinaBelgiumCERN Upgrade ItalyPakistanIndiaColombiaCERN KoreaChinaBelgiumFinlandEgypt N. PueblaGeorgia Uniandes Nueva Puebla Italy

Pigi Paolucci & Anna Colaleo – RPC project Hired manpower: RPC system was built about 7 years ago. After a so long period many experts left. A new generation of detector, electronic and software experts, was needed since the 2011 to run our system ( ), to upgrade it ( ) and restart it (2015) For this we planned to place side by side (at CERN) experts and newcomers in order to pass the baton to the future group of experts. During 2012 RRB SG meeting (see also RRB ) we presented the needs to increase the budget allocation for manpower (with a corresponding decreasing in material), required for continuous support during operation and as a trainer for new people. Since middle of 2011 decide to open a “project associate contract” for a “detector expert”. At same time we used subsistence to have post-doc at CERN with experts was very important to fine-tuning the RPC operations (stabilize the endcap detector and trigger) and study in real-time the performance of the system. Manpower was needed to upgrade all the online and offline tools (WBM, DCS, Background tool) and the offline analysis. M&OB were used for short periods (3-4 months) to give to them the opportunity to stay at CERN and analyze the data in real time. It was a success 4

Pigi Paolucci & Anna Colaleo – RPC project Hired manpower: Taking into account the experience and the manpower needed during LS1 we confirm an higher allocation of hired manpower in future years. We also realized that most of the components replacements foreseen can be avoided repairing them (more technicians and experts and less material). Many students coming from small Institutions have been supported for short period. This was very useful in order to let new people joining the project and give a chance to everybody. We are planning to continue on this way and keep part of the manpower budget for that in the next years. 5

Pigi Paolucci & Anna Colaleo – RPC project 2012 Budget status Carry over 2011 was due to the save money in 2010 and 2011 We decided in 2011 (presented at 2012 RRB SG): - to delay to 2012 the purchase of material (about 175 kCHF) which would required access to the cavern, in order to install it in keep about 40 kCHF as a contingency for In 2012 all contributions arrived on time. In order to help the small groups we allow them to paid a small part in kind 6

Pigi Paolucci & Anna Colaleo – RPC project 2012 budget/expenditure The expenditure for manpower was kCHF → about 33% more than requested. The expenditure for material was 60.7 kCHF → about 73% of the 2012 budget request for material. 7

Pigi Paolucci & Anna Colaleo – RPC project carry over was partially used for material. About 175 kCHF of material was foreseen in 2012 (using the saved " " budget). Not all material was purchased and the real cost in some cases did not correspond to the initial request. Carry over of 81 kCHF for the 2013 Equipment purchase: budget The expenditure foreseen in 2013 for the remaining items is 75 kCHF carry over in

Pigi Paolucci & Anna Colaleo – RPC project 2012 hired manpower: in-kind, contract and subsistence In-kind contribution in manpower: some countries provide manpower on specific items as requested by the RPC IB. Subsistance for technicians, engineers or physicists/students with technical skill, to cover extra cost of staying in the Geneva area (not same for all people). Project associate for people with experience in commissioning and operation (detector expert on call) and trainer for new people. In-kind contribution CHF Project associate (2 persons) CHF Subsistence CHF Total manpower expenditure = CHF Total manpower allocation= CHF In 2012 the expenditure was higher than expected due to extra needs. 9

Pigi Paolucci & Anna Colaleo – RPC project 2012 hired manpower expenditures Two not foreseen positions for post-doc were needed in the 2012 for a total of 83 kCHF on hired manpower: Project associate for “Trigger system expert on call”, RPC trigger expert. Activity shared with the trigger project. Subsistence for 4 month for the DPG coordinator. 10

Pigi Paolucci & Anna Colaleo – RPC project 2014 M&O-B requests For 2014 the budget request is same as for (as for 2013) will be shutdown period : the needs in term of manpower and material are due to detector/electronics reparation and recommissioning. kCHF 11

Pigi Paolucci & Anna Colaleo – RPC project Budget projection until 2017 Back to running operation from 2015 with less requests ( 30% less with respect to and 10% less with respect to 2012), due to long shutdown just finished. In next years we confirm an higher allocation for hired manpower with the reduction on budget for material. Hardware reparation and not its replacement. We want to keep the ability to renew our experts and have phd and post-doc at CERN Evolution of % of manpower allocation in the years. → % in running period aroun 70% 12

Pigi Paolucci & Anna Colaleo – RPC project Conclusions ➢ RPC project was formally built in the 2010 (barrel and endcap unification) and after 2 years we now know very well how to define our budget and use it to run our system during data taking and shut-down. ➢ Peculiarity to have 3 main contributors and many small institutions. ➢ We keep increasing the number of institutions participating to the RPC project. Two new institution in 2013 (total 20). This allows us to keep a low cost/authors. ➢ The financial support in 2012 allowed RPC system to operate efficiently during the data taking and study in details the detector and trigger performances. ➢ In 2012 the large carry-over from 2011 was re-allocated mostly for the material and a small part left as contingency. We accomplished about 50% of the foreseen material replenishment, which will be completed in ➢ The 2012 expenses were 15% higher with respect to expectation, due to extra needs on manpower. To cover that we use contingency from 2011 carry over. ➢ After the LS1 shutdown we will have 3 years of data taking and for this reason the estimated budget for the M&OB will be reduced of about 30%, with more request on manpower and less on material. 13

Pigi Paolucci & Anna Colaleo – RPC project BACKUP SLIDES 14

Pigi Paolucci & Anna Colaleo – RPC project 2012 budget: original request The budget allocation for 2012 was presented to SG referee in During last RRB meeting with referees in 2012 it was already approved an increase of budget for manpower and a corresponding decrease of budget for material. 15

Pigi Paolucci & Anna Colaleo – RPC project 2014 M&O-B details kCHF 16