Engineer Training Drying System, IR and Temp Control.

Slides:



Advertisements
Similar presentations
Engineer Training XL1200 Drying System. Engineer Training XL1200 Drying System Confidential 2 XL1200 Drying System.
Advertisements

Training Guide. `
Engineer Training Machine Electrical Cabinet TJ8300 / TJ8500 Machine Electrical Cabinet (EC)
Engineer Training UV Lamp Head TJ8300 / TJ8500 UV Lamp Head.
Engineer Training XL1200 Safety System. Engineer Training XL1200 Safety System Confidential 2 Standard Requirements Both the machine and the Safety System.
Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Remote Control For Home Applications
Engineer Training Supply Unit TJ8300 / TJ8500 Supply Unit.
Engineer Training XL1200 Electronics. Engineer Training XL1200 Electronics Confidential 2 XL1200 Electronics The XL Jet Electronic System consists of.
Engineer Training Media Feeder TJ8300 / TJ8500 Media Feeder.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Air Condition Design Course 20 Minutes Test 10 Minutes.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Engineer Training Control Unit TJ8300 / TJ8500 Control Unit.
Engineer Training Machine Overview TJ8300 / TJ8500 Machine Overview.
Engineer Training Rear Operation Unit TJ8300 / TJ8500 Rear Operation Unit.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
Station 4 ?? Temperatures and Moisture Moisture Meters Pin Contact Data Loggers Spot Temperature Meter Thermal Imager Cautions and Safety.
© Emotron AB Protection against damage and downtime Emotron M20 Shaft Power Monitor.
Engineer Training XL1500 Safety System. Engineer Training XL1500 Safety System Confidential 2 Standard Requirements Both the machine and the Safety System.
Engineer Training Troubleshooting TJ8300 / TJ8500 Troubleshooting.
Engineer Training Electrical Cabinet (EC) TJ8300 / TJ8500 Electrical Cabinet (EC)
Engineer Training Electrical System Overview and Requirements.
CBC AUTOJH SYSTEM CONTROLS CHAPTER 10. CBC AUTOJH OBJECTIVES Discuss Operation and Function of controls for Manual and Automatic Climate Control System.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Engineer Training Drum Heating TJ8300 / TJ8500 Drum Heating.
3. Cooling a. Introduction 1) Definition reduce temperature of air entering greenhouse Why? –Reduce stress –Uniformity –Better growth.
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
Copyright © 2014 Delmar, Cengage Learning APAD/ACPU A/C Control Systems Instructor Name: (Your Name) 11 CHAPTER.
Project Goals And Objectives ____________________________________________________ Create a “smart”, customizable, all in one system Little to no learning.
JHCBC AUTO A/C PERFORMANCE TESTING CHAPTER 3 Page
Engineer Training Electronic System Overview. Engineer Training XL1500 Electronics Confidential 2 XLjet Electronics The XL1500 Electronic System consists.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
TRISHUL Winding Solutions Pvt Ltd
Engineer Training XL1200 Electric. Engineer Training XL1200 Electric Confidential 2 Block Diagram.
Engineer Training Motion Control TJ8300 / TJ8500 Motion Control.
Engineer Training Machine New Features TJ8300 / TJ8500 Machine New Features.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Observatory System Design Stewart Harris - UCB.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
1 Reading Electrical & Refrigerant Drawings. 2 General An electrical drawing shows the components of the circuit as simplified standard symbols, and the.
For Multiple refrigeration system
Engineer Training UV Electrical Cabinet (1-15) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 1-15)
Engineer Training Ink Insertion TJ8300 / TJ8500 Ink Insertion.
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman TEMPERATURE SENSORS 72.
Engineer Training Checking the Motor’s Rotation Direction TJ8300 / TJ8500 Checking the Motor’s Rotation Direction.
MICE Power Supply System John Joseph LBNL Spectrometer Solenoid Controls & Monitoring Review Dec 11 th 2012.
Service Section Technical Training December 2005.
The Cooling System.
LESSON 16 ENGINE OPERATION
the compact air control solution
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS Electric Cooling Fans.
KITCHEN EXHAUST FAN CONTROLLER ALI ALHERZ FLAVIO GOMES GIANCARLO GRAMAZIO 12/1/2014 Polytechnic School of Engineering.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. 5 August 2014.
AIR CONDITIONING (COOLING)
UTH-65A VER. CAUTIONS ! PLEASE USE THE OUTLET PREPARED BY A QUALIFIED SERVICEMAN AND MUST CONFIRM IT BEFORE APPLY[SING AN ELECTRIC CURRENT.
4-8  Turn in Project  Notes on Homeostasis and Human Body systems  Foldable on human body systems  Homefun: Finish the foldable at home.
Last updated: 6/28/2016www.alto-shaam.com Rotisserie Training Rotisserie.
Figure 28.1 A typical engine coolant temperature (ECT) sensor.
72 TEMPERATURE SENSORS TEMPERATURE SENSORS.
2016 RZR xp Turbo – COOLING Hood Scoop & Air Deflector
FCU Controller M/FCU
ProtoDUNE SP – Slow control Status
Remote Control For Home Appliance
Bridge Heating.
Is power available in wall outlet?
UV Startup Procedure.
Voyager II and III – Energy Recovery Modules
AC POWER REQUIREMENTS & AC TO AC CONVERTER
Error codes for split systems
Presentation transcript:

Engineer Training Drying System, IR and Temp Control

Engineer Training XL1500 Drying System Confidential 2 XL1500 Drying System

Engineer Training XL1500 Drying System Confidential 3 Components The drying system system includes the following parts:  IR lamps (400w)  Fans  230v contactor  Temperature controller  Temperature sensor  Thermo sensors

Engineer Training XL1500 Drying System Confidential 4 Process 1.The printed substrate moves under the drying system (IR). 2.When the printed substrate is exposed to the IR lamps, the drying process begins. 3.The fans work all the time (turned on/off by CB F8). The fans operate so that the warm air does not reach the print heads in order to avoid the heads from clogging. 4.The fans help to avoid damage to the substrate by cooling it down. 5.To provide the better drying, the exhaust pipes evacuate the warm air from the drying area (the exhaust system requirements are described in the XL1500 Site Preparation Guide).

Engineer Training XL1500 Drying System Confidential 5 System Requirements  The IR assy requires a 3-phase 230 VAC.  The IR is controlled by the temperature controller located in the PDU.  Fans are turned on/off via CB F8 located in the PDU.  The IR temperature controller receives 24 VDC from P5 in the PDU.  When the current temp. is higher then the temp. set point., 24 VDC is supplied to SSR 1,2,3 via fuse F16 that protects SSRs from overheating.  The signal to activate the IR comes via P4 (short between pin 1 and 5).

Engineer Training XL1500 Drying System Confidential 6  IR lamps work only if :  Fans are working  230 V hood contactor is activated.  All the thermo sensors are shorted and not indicating when the temperature exceeds 120°C.  3 SSR’s (90A) are located inside the PDU and responsible for the IR’s working. System Requirements (Cont.)

Engineer Training XL1500 Drying System Confidential 7 Examples 4 SSR’s inside the PDU Thermo sensor inside the IR assy