COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 1 - PLANS FOR FUTURE Institute of Meteorology and Water.

Slides:



Advertisements
Similar presentations
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
Advertisements

C ontacts: Marit Helene Jensen, Norwegian Meteorological Institute, P.O.Box 43 Blindern, N-0313 OSLO, NORWAY. HIRLAM at met.no.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss The Latent Heat Nudging Scheme of COSMO EWGLAM/SRNWP Meeting,
Where Do the 7 layers “fit”? Or, where is the dividing line between hdw & s/w? ? ?
Verification of DWD Ulrich Damrath & Ulrich Pflüger.
Gillian Baxter University of Reading Departments of Mathematics and Meteorology Supervisors: N. K. Nichols, S. L. Dance, A. S. Lawless, S. P. Ballard Sponsored.
International Workshop APAN 24, Current State of Grid Computing Researches and Applications in Vietnam Nguyen Thanh Thuy 1, Nguyen Kim Khanh 1,
Meteo-GRID: Performing Local Weather Forecast Using GRID Computing C.-J. Lenz, D. Majewski Deutscher Wetterdienst (DWD)
Lecture 3: Computer Performance
Slide 1 EUMETNET SRNWP Interoperability Workshop 2008 Slide 1 Interoperability with regard to Boundary Conditions Alfred Hofstadler Meteorological Applications.
Jenny Stocker, Christina Hood, David Carruthers, Martin Seaton, Kate Johnson, Jimmy Fung The Development and Evaluation of an Automated System for Nesting.
Institute of Meteorology and Water Management – NRI Extensive tests of lower-boundary-variation-based COSMO EPS COTEKINO Priority Project -
COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 1 - Verification of the LM at IMGW Katarzyna Starosta,
ScotGrid: a Prototype Tier-2 Centre – Steve Thorn, Edinburgh University SCOTGRID: A PROTOTYPE TIER-2 CENTRE Steve Thorn Authors: A. Earl, P. Clark, S.
Gary MarsdenSlide 1University of Cape Town Computer Architecture – Introduction Andrew Hutchinson & Gary Marsden (me) ( ) 2005.
Numerical Weather Prediction at DWD COSMO-EU Grid spacing: 7 km Layers: 40 Forecast range: 78 h at 00 and 12 UTC 48 h at 06 and 18 UTC 1 grid element:
Internet Information Services 7.0 Infrastructure Planning and Design Series.
+ Best Practices in Regional Climate Modeling Dr. Michel d. S. Mesquita Bjerknes Centre for Climate Research, Uni Research
Introducing the Lokal-Modell LME at the German Weather Service Jan-Peter Schulz Deutscher Wetterdienst 27 th EWGLAM and 12 th SRNWP Meeting 2005.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Operational COSMO Demonstrator OPCODE André Walser and.
Meteorological Service of Canada Environment Canada Cloud Cover Changes and Their Impacts on Solar Energy Production in North America PERD Climate Change.
Non-hydrostatic Numerical Model Study on Tropical Mesoscale System During SCOUT DARWIN Campaign Wuhu Feng 1 and M.P. Chipperfield 1 IAS, School of Earth.
Latest results in verification over Poland Katarzyna Starosta, Joanna Linkowska Institute of Meteorology and Water Management, Warsaw 9th COSMO General.
The latest results of verification over Poland Katarzyna Starosta Joanna Linkowska COSMO General Meeting, Cracow September 2008 Institute of Meteorology.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE : IMPLEMENTATION OF MOSAIC APPROACH IN COSMO AT IMWM AUTHORS:
Course Evaluation Closes June 8th.
Easy Deployment of the WRF Model on Heterogeneous PC Systems Braden Ward and Shing Yoh Union, New Jersey.
Ocean Modelling System at Noumea : status
A real-time forecast system for air pollution concentrations - Contribution to subproject GLOREAM - GLO-6 Hermann J. Jakobs, Elmar Friese, Michael Memmesheimer,
Simulation of heavy precipitation events in Madeira Island using resolution of 1 km Simulation de précipitations orographiques intenses sur Madère (résolution.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of MeteoSwiss 18 September 2008 COSMO GM 2008.
COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.
Introduction Application of parallel programming to the KAMM model
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of the COSMO-1 configuration at MeteoSwiss Guy.
Computer Organization Instruction Set Architecture (ISA) Instruction Set Architecture (ISA), or simply Architecture, of a computer is the.
1 Operational Scheme and Schedule: Basics §Basic scheme (analysis + forecast) l Global-Modell (GME, global and synoptic-scale) l Lokal Modell (LM, highly.
5 th COPS Workshop, Hohenheim, March 2007 Real-time assimilation efforts during COPS Hans-Stefan Bauer, Matthias Grzeschik, Florian Zus, Volker Wulfmeyer,
INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT Hydrological applications of COSMO model Andrzej Mazur Institute of Meteorology and Water Management Centre.
NCAS Unified Model Introduction Part 4b: UM Limited Area Models University of Reading, 3-5 December 2014.
CM-SAF Board Meeting, Offenbach, April 2006 CM-SAF TOA radiation status report D. Caprion Royal Meteorological Institute of Belgium.
COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 1 - Simple Kalman filter – a “smoking gun” of shortages.
Joint SRNWP/COST-717 WG-3 session, Lisbon Stefan Klink Data Assimilation Section Early results with rainfall assimilation.
Power Guru: Implementing Smart Power Management on the Android Platform Written by Raef Mchaymech.
COSMO - ROmania Liliana VELEA National Meteorological Administration, Bucharest, Romania.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of the COSMO-1 configuration at MeteoSwiss Guy.
COSMO General Meeting Zürich, Sept Christoph Schraff Revision of Quality.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE: IMGW in COSMO AUTHOR: Michał Ziemiański DATA:
Actions & Activities Report PP8 – Potsdam Institute for Climate Impact Research, Germany 2.1Compilation of Meteorological Observations, 2.2Analysis of.
Exploring and Validating LM Performances at Very High Resolution M. Didone, D. Lüthi, H.C Davies Institute for Atmospheric and Climate Science, ETH Zürich.
Introducing the Lokal-Modell LME at the German Weather Service
Michael Naughton, Wenming Lu
Copernicus Atmosphere Monitoring Service
Overview of the COSMO NWP model
COSMO CONSORTIUM OF SMALL-SCALE MODELLING
5 MAJOR BENEFITS OF CLOUD TESTING. Cloud testing is a mode of testing web applications which use cloud computing and infrastructure. It includes both.
TITLE Authors Institution RESULTS INTRODUCTION CONCLUSION AIMS METHODS
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT
HELLENIC NATIONAL METEOROLOGICAL SERVICE
COSMO GENERAL MEETING HELLENIC NATIONAL METEOROLOGICAL SERVICE (HNMS)
NWP Strategy of DWD after 2006 GF XY DWD Feb-19.
Огторгуй ба амидрал Cosmos and life
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ
SRNWP-PEPS COSMO General Meeting September 2005
INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT
Support Activities and WG 6 Overview Status Report
NWP Test Suite: some updates
Presentation transcript:

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 1 - PLANS FOR FUTURE Institute of Meteorology and Water Management

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 2 - Contents: Introduction - current status Plans - hardware and software Plans - model Plans - models PLANS FOR FUTURE Conclusions

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 3 - Hardware and software - key parts Platform: SGI CPU (100GFlops) SGI CPU OS + environment Model: COSMO-LM Input/OutputModel results Introduction - current status

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 4 - COSMO-LM - (operational mode) in IMWM since Twice-a-day - for 00 and 12 UTC input data (from GME). Configuration domain: 2702 km x 2254 km grid size: 193x161x35 grid resolution: 14 km time step: 80 s forecast: 78 hours Introduction - current status

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 5 - Introduction - current status

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 6 - Introduction - current status

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 7 - Global Model GME Local Model (COSMO-LM) Introduction - current status

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 8 - Plans - hardware and software...upgrade processors (500MHz  ???)...and / or increase number of processors (up to 124)...(routine) upgrade of operational system (IRIX)...(routine) upgrade/intro of managing tools (e.g. LSF queuing system) We plan to...

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland start analysis cycle (very shortly)......as a basis for operational data assimilation...increase grid resolution to 7x7 km...start nested models in smaller domains We plan to... Plans - model

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland Plans - models...set up quasi-operational run(s) of alternative model (MM5)......(just) in case of malfunction or problem with LM We plan to......and to compare results for scientific purposes

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland Conclusions Some goals are aimed to “stay in business” Others, to forecast needs we shall face sooner or later Some actions would be carried out in next few weeks (months) Other, unfortunately, in months/year(s) - especially hardware ones

COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland THANK YOU FOR YOUR ATTENTION