17th July 2008#4-CTF3 Committee1 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG 0225CA.SNG.

Slides:



Advertisements
Similar presentations
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Advertisements

FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
General improvements Upgrades Loose collection of items Changed – being changed – to be changed CTF3 working meeting10/02/121.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
AWAKE electron source New Electron Source WP at CERN
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
1 1. Some recent views ( ) 2 Linac tunnel
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
CTF3-CLEX meeting June 12, 2006page 1 choice of architecture : 1 photo-injector 3 LIL sections: 1 for compression and 2 for acceleration 1 beamline with.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Current NML Layout.  Overall length of building is 72M 3 cryomodules with feed and end cans ~40M Not enough room for both photoinjector and downstream.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Ground motion studies at ATF2 June 11, 2014 Orbit jitter source identification via ground motion studies at ATF2 (Results of the June run) Marcin Patecki,
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
F. Peauger19th June #3-CTF3 Committee1 CALIFES STATUS CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
F. Peauger - CEA DSM IRFU SACM 18 May 2008 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
ELENA installation progress F. Butin / ELENA collaboration.
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Cavity BPM for CALIFES C. Simon, M. Luong, D. Bogard, W. Farabolini, J
High energy beam transport.
Phase Feed-Forward Piotr Skowroński (CERN)
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
Drive-Laser Commissioning Status and Plans
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
ELENA installation and commissioning status
CLEX* Status and Plans CTF3 complex CLEX
Have a chance to operate your own beam at CERN
The ELENA BPM System. Status and Plans.
9/10/2018 News on operation Second commissioning phase from 30th of March to 9th of April Aline Curtoni, Claire Simon, Franck Peauger, Wilfrid Farabolini.
Injector Performance Requirements Conventional Facilities Update
Parity Quality Beam (PQB)
LCLS Injector: Introduction D. H
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
LCLS Undulator System Production Management
Drive Laser Commissioning Status
Two-beam Test-stand Design and Construction Status
Isotope Readiness Review Run Plans
Presentation transcript:

17th July 2008#4-CTF3 Committee1 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG 0225CA.SNG 0230CA.SNG 0250 CA.BPM 0240CA.BPM 0260CA.BPM 0310CA.BPM 0380 CA.DHG/DVG 0245CA.DHG/DVG 0265CA.DHG/DVG 0320CA.DHG/DVG 0385CA.DHB/DVB 0270 CA.ICT 0210 CA.VVS 0300 CA.QFD 0350CA.QFD 0360CA.QDD 0355 CA.BPR 0370 CA.BPM 0410 CA.MTV 0390 CA.MTV 0420 CA.VVS 0500 CA.SDH 0340 CA.DHB/DVB 0230CA.DHB/DVB 0250 ACS 0230ACS 0250ACS 0270 DUMP 0450 TBTS ITL CA.MTV 0125 (virtual cathode) CA.FCU 0430 CALIFES STATUS

17th July 2008#4-CTF3 Committee2 CALIFES STATUS: Mechanics/installation Work done on week 27 Laser Beam Transportation: work completed ! - all the line is under 30 Torr (0.04 atm)  no leakage - change of the spring which held the lenses - completion of the protection caps on laser table Pumping ~ in the middle of the transport line Vacuum gauge near the PI table 1/3

17th July 2008#4-CTF3 Committee3 CALIFES STATUS: Mechanics/installation Work done on week 27 Observation: problem of quadrupoles positioning compared to the vacuum chamber center  the 3 quad. have been re-centered at ~±0.25mm compared to the vacuum chamber center (magnetic axis = mechanic axis) 2/3

17th July 2008#4-CTF3 Committee4 CALIFES STATUS: Mechanics/installation Remaining “mechanical” work for end of July-August VPM#2 – CA.MTV 0420:  recovery of the piece used for mirror introduction  important leakage detected  new installation foreseen on week 30 VPM#1/2/3 – CA.MTV :  protections necessary for superior part of VPMs chambers  Lead shielding necessary to protect cameras from radiations  General vacuum test for CALIFES foreseen from week 30 or beyond ? (CERN) Power Phase Shifter: in klystron gallery (CERN)  provide water arrival for the Power Phase Shifter 3/3

17th July 2008#4-CTF3 Committee5 CALIFES STATUS: Bake out temperature Following temperatures should not be exceeded during the bake out of the line between the injecting gun and the 1 rst LIL section Is a temperature monitoring foreseen during bake out ? ICT Bergoz will not be able to tolerate an higher temperature than 100°C

17th July 2008#4-CTF3 Committee6 CALIFES STATUS: Laser system Work done on week 25 and 28: Main objective  Installation of the Pulse Picker and test it: with synchronisation coming from the Masterclock instead of the final fine synchronisation Good rise and fall time have been checked  OK “plateau”  OK, no discontinuity transmission measured = 81%  in agreement with measurements made in the lab in Saclay

17th July 2008#4-CTF3 Committee7 CALIFES STATUS: Laser system Work done on week 25 and 28: No measurements in CLEX with camera (Pulse Picker + transport), due to too low UV energy (0.3nJ)  tests are reported to beginning of September Checking of CLEX camera: signal doesn’t go up (even with a CERN camera)  this problem has been solved ? The lines for sensing UV beam at the output of the laser table have been installed The line sensing the profile at the output of BBO uses the same mounting and UV converter as the sensing in CLEX

17th July 2008#4-CTF3 Committee8 CALIFES STATUS: BPMs 1/2 Work done on week 26:  CA.BPM0220, CA.BPM0240, CA.BPM0260, CA.BPM0310, CA.BPM0380, CA.BPM0410 BPM Frequencies and the factors of quality of the monopole and dipolar modes were measured on the 6 BPMs Fréquence (MHz) Mode monopolaire Facteur qualité monopolaire Fréquence (MHz) mode dipolaire Facteur qualité dipolaire Cross-talk (dB) CA.BPM CA.BPM CA.BPM CA.BPM CA.BPM CA.BPM Example of transmission and reflexion of all modes on 1 BPM on 1 slot Similar results from one BPM to another, and in-situ results are comparable to Saclay in-lab measurements Cross-talk  26dB  OK

17th July 2008#4-CTF3 Committee9 CALIFES STATUS: BPMs 2/2 Work done on week 26: Electronics boxes were installed in the CLEX In the BPMs rack (CLEX-G), the various crates and cables were installed Work planed by the end of July (week 29 or 30): Replacement of the LEMO cables + flat cables in CLEX-G Problem discovered with one Acqiris board (1 channel is out of order)  board sent to Agilent company for repair (at least 4s-8s of delay min ?)  M. Draper try to provide us another board temporary during this period

17th July 2008#4-CTF3 Committee10 CALIFES STATUS: Control Command of BPMs Work done on week 26-28:  thanks to S. Deghaye’s, etc … 1/Readout of acqiris board signals on OASIS  OK 2/Signal processing  OK 3/Results sent on graphic windows under JAVA  ±OK The 6 BPMs are implemented (command of the BPMs switchs remotely from control room is not yet tested) Work planed to be completed by the end of August: BPMs Control Command: soft written but still some difficulties for communication with the database (not updated), transfer and tests of acqiris boards to their final rack BY064-XG have to be done, with help of CERN team ?  task on critical path

17th July 2008#4-CTF3 Committee11 CALIFES STATUS: Control Command and database CALIFES Missing components in Database (status on 11th July 08): CALIFES Components already in Database (status on 11th July 08): Working set  OK for: RF measured signals Solenoids (3) Quadrupoles (3) Dipole (1) Correctors (14 over 18) Working set  not implemented yet for: LLRF commands MKS30 commands RF Timing commands BPMs signals (CA.BPM0220,etc …) VPMs signals (CA.MTV0215, etc …) vacuum ?  We need also some help to transfer/install our software on a Control Room PC

17th July 2008#4-CTF3 Committee12 CALIFES STATUS: Conclusion End of “mechanical” tasks MTVs (Video Profile Monitors): electrical adaptation under progress and Control Command have to be done in Summer-September, with help of CERN team ?  task on critical path BPMs (Beam Position Monitors) Control Command: soft written but still some difficulties for communication with the database (not updated), transfer and tests of acqiris boards to their final rack BY064-XG have to be done, with help of CERN team ?  task on critical path Transport of the UV laser beam down to the photocathode, with Pulse Picker working in specifications  energy still too low, and have decrease last week … RF Power Phase Shifter: Specifications document re-defined and sent to the contractors for acceptation and signature (CEA would manage directly the brazing company for mode convertors  official separation of machining and brazing tasks). New order is under progress. We foresee an installation during the shutdown (beginning of 2009).