1 LBT Q1 2007 Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Advertisements

LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
Quality Assurance Testing Tony Mack PlanetLab Developers Meeting.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Fall CS-EE 480 Lillevik 480f06-l5 University of Portland School of Engineering Senior Design Lecture 5 Prototype phase Evaluation phase Production.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
Team Name: Group C.  Zisimos  Team Leader, Software Engineer  Richard  Hardware Engineer  Michael  Hardware Engineer  Jason  Software Engineer.
LBT Q Software Review GCS – Guiding and Active Optics.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Engineering Review SAB Static Balancing.
Anjanae Brueland & Janet Wingard.  What is Network Design, Planning & Management?  System Development Life Cycle (SDLC)  The phases of an information.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
Sunnyside Elementary School Air Toxics Monitoring Program Southern Ute Indian Tribe Air Quality Program 2011 National Tribal Forum Spokane Washington.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
Ch7: Project Monitoring and Control  To reduce differences between plan and actual in the 3D space of T/C/P.  Best utilization of organization’s primary.
LBT Q Engineering/Software Review ROTRotators.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
PROGRAMMING. Computer Programs  A series of instructions to the computer  pre-written/packaged/off-the-shelf, or  custom made  There are 6 steps to.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
Temperature and humidity effect on the tracking accuracy.
Quicken technical support number SDFGFFGGDF. QUICKEN TECHNICAL SUPPORT NUMBER QUICKEN TECHNICAL SUPPORT NUMBER
This is not safety-critical, but it is financial-critical.
Rapid Automation Design
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Workshop 1: Processing Facility Configuration Information
Monitor Producer Consumer.
Presentation transcript:

1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance

2 Highlights (Q1/2007) Enclosure control system has been performing very well, very little observing time has been lost due to enclosure systems Enclosure control system has been performing very well, very little observing time has been lost due to enclosure systems Dewpoint monitoring in the enclosure Dewpoint monitoring in the enclosure Humidity or dewpoint monitoring of actuator compressed air Humidity or dewpoint monitoring of actuator compressed air Enclosure grounding progress Enclosure grounding progress Enclosure track performance Enclosure track performance

3 Open Issues Technical Technical Humidity vs dewpoint monitoring of compressed air Humidity vs dewpoint monitoring of compressed air Schedule Schedule Decide now and order the dewpoint sensor Decide now and order the dewpoint sensor Financial Financial Need to order dewpoint sensors for CA, return humidity sensors Need to order dewpoint sensors for CA, return humidity sensors Resource Resource None None

4 Progress (Q1/2007) ECS continues to operate well, few bugs and improvements fixed ECS continues to operate well, few bugs and improvements fixed Software needs to be written for dewpoint monitoring Software needs to be written for dewpoint monitoring Sensors were purchased, humidity for compressed air and dewpoint for the enclosure. Sensors were purchased, humidity for compressed air and dewpoint for the enclosure.

5 Planning (Q2/2007) Install sensors Install sensors Write software Write software Debug Debug