Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.

Slides:



Advertisements
Similar presentations
1 1 View from DOE LB DUSEL Meeting February 27, 2008 UC, Davis Jerry Blazey NIU/DOE.
Advertisements

Design Parameters.
B.Sadoulet Boulder Intro 1/5/05 1 Boulder DUSEL Study Workshop Introduction Apologies: a difficult date! The DUSEL Process The DUSEL (Solicitation 1) Study.
Dark Universe: Dark Matter, Dark Energy and the Fate of the Universe.
Geotechnical Investigation Step 1 - Gather Existing Information Structure Data Bridge, building, road, wall, etc. Type - stories, loads, materials, etc.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
Transparent Earth/Seismic Imaging Team Steven D. Glaser, working group herdsman Towards the full Homestake Transparent Earth Observatory – installation.
PD Connection with National Underground Lab R. Rameika Fermilab October 8, 2004.
Henderson DUSEL Physics & Geoscience Workshops Lee Petersen, CNA Consulting Engineers Greg Hulne, Miller Dunwiddie Dale Holland, Dunham Associates.
B.Sadoulet DUSEL Blacksburg Introduction 1 Blacksburg Workshop DUSEL process Solicitation 1 Workshops: Berkeley, Blacksburg, Boulder, Maryland(?) Goals.
CE 120 Introduction to Civil Engineering
SITE WORKS SITE INVESTIGATION AND SOIL INVESTIGATION
MINE RELATED ASPECTS REGARDING CONSTRUCTION OF A LARGE UNDERGROUND NEUTRINO DETECTOR CLOSE TO THE GARPENBERG MINE INITIAL STUDY BY LARS NORLING INDEPENDENT.
1 Asia Singapore Building and Construction Authority (Building Engineering Division) Managing Geotechnical Risks – are we learning from our failures 29.
Geosciences in an Underground Laboratory:
CSM/CNA UNO R&D Proposal Lee Petersen –CNA Consulting Engineers Mark Kuchta –Colorado School of Mines Requested budget: $200k/year for two years Cavern.
Welcome to SNOLAB David Sinclair. Welcome to our new Building Note – Building is still under construction Note – Building is still under construction.
SNOLAB – An International Facility for Underground Science Expand underground space to allow several experiments to operate simultaneously Provide a surface.
Homestake DUSEL Proposal Overview Management and Operations Kevin T. Lesko April 20, 2007.
November 11, 2004 Biogeohydrological Environment and Physical Aspects of the Henderson Mine Site Climax Molybdenum Company Henderson Operations.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
Andrew Hime Physics Division, LANL e-e- e-e- e SNOLAB Scientific Development Andrew Hime Physics Division, Los Alamos National Laboratory SNOLAB Workshop.
Recommendations for Science at SNOLAB Andrew Hime On behalf of the Experiment Advisory Committee Aug. 17, 2005 SNOLAB Surface Building.
Harry Nelson UCSB HUSEP Ft. Collins Nov. 19, 2005 Lower Campus.
Homestake Massive Detector & Long Range Neutrino Oscillation Program 1) Introduction – Ken Lande 2) Long Base Line Neutrino Oscillations – Milind Diwan.
DUSEL Experiment Development and Coordination (DEDC) Internal Design Review July 16-18, 2008 Steve Elliott, Derek Elsworth, Daniela Leitner, Larry Murdoch,
Physical Characteristics and Constructability Bill Roggenthen and Herb Wang Homestake DUSEL April 20, 2007.
Fraser Duncan Queen’s University Synergies in Low Background Techniques 26 July 2005 Underground Facilities at SNOLAB.
Andrew Hime Physics Division, Los Alamos National Laboratory Workshop on Low-Radioactivity Techniques Laurentian University, Sudbury, Ontario, Canada.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Logistics Workshop Summary Mike Headley August 19, 2015.
IR location for the shallow site near Dubna A. Dudarev JINR IWLC 2010, October 20.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
DESIGN AND CONSTRUCTION OF A MODULAR MASSIVE DETECTOR AT THE HOMESTAKE LAB Modular Mass – 100 Kilotons Modular Shape –Cylinder –50m dia x 50m high Depth.
Montana Resources Conceptual Plans for Permitting Continued Mining September 15, 2015.
No. 6 Winze Water Level 7100 Level - Existing Waste Pass Winze Bottom Water below 7400 L.
B.Sadoulet CDMS DUSEL The Deep Underground Science and Engineering Laboratory The process Themes DUSEL and CDMS Bernard Sadoulet Dept. of Physics.
Low Background Studies at the Soudan Underground Laboratory-9/20/ Low Background Studies at the Soudan Underground Laboratory The Soudan Underground.
SITE INVESTIGATION.
Homestake DUSEL Project Management and Systems Engineering Richard DiGennaro LBNL April 20, 2007.
DUSEL Development Process: The Roadmap from Science & Engineering Plan to the Facility Description Lee Petersen CNA Consulting Engineers.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
Conventional Facilities for the Far Detector Options Assumptions and Cost Estimates T. Lundin April 25, 2012 LBNE Reconfiguration Workshop - 25, 26 - April-2012.
The categories for ILC budget planning are: R&D – work done in laboratories to develop and verify subsystem components. This supports the cost reduction.
News from LBNF C. J. Mossey, LBNF Project Director DUNE Collaboration Meeting - South Dakota School of Mines and Technology 19 May 2016.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
GEOTECHNICAL & PILOT TESTING PROFESSIONAL SERVICES RECOMMENDATION Board of Directors – November 19, 2015.
 All civil engineering projects like dams, reservoirs etc. constructed on earth crust and constructed by material obtained from the crust.  So it is.
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
ANT11 Presentation, October, 10-13, 2011 David Vardiman Project Engineer Geotechnical Design and Excavation 1 Sanford Lab at Homestake, Lead, SD 4850L.
Long-Baseline Neutrino Facility LBNF LBNC: Far Site Update and Planning Mike Headley LBNF Far Site Facilities Project Manager January 11, 2016.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) ALAN AULD GROUP LTD The design of a pan-European.
“Megaton” Cerenkov Detector - Excavation Kenneth Lande, Univ. of Pennsylvania 4200 mwe Depth.
Introduction Engineering geology is the application of geology in design, construction and performance of civil engineering works.
Long-Baseline Neutrino Facility LBNF Elaine McCluskey, LBNF Project Manager Fermilab PAC Meeting 23 June 2015.
Geotechnical Engineering II
Experimental Hall in Mountain Regions
FCC Underground Infrastructure
Geotechnical Investigation
$150K Chicago/ANL seed funding for Braidwood site investigation
Engineering Geology William Shehata.
General Issues We will need to understand infrastructure requirements
Civil Engineering for FCC-eh IR
PAT GEOTECHNIC INTRODUCTION TO GEOTECHNICAL ENGINEERING.
CMB-S4 Detectors & Readout Task Force Update
Presentation transcript:

Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL Plans for Preliminary Geotechnical Studies

Level (+118) Conceptual Layout Neutrino Detectors Lab Modules Ross Shaft Yates Shaft Davis Cavern Existing Drifts New Drifts Scale: ~1 km (3000 ft.)

Deep Underground Science and Engineering Laboratory at Homestake3 Preliminary Feasibility Studies have been done for Excavation and Ground Support for Typical Lab Modules Lab Module Ramped Excavation Sequence Preliminary Geotechnical Analyses were done to support the site selection and identify preliminary requirements for excavation and ground support requirements. Detailed site investigation studies will evaluate specific conditions at proposed locations for development Level Map CDR

Deep Underground Science and Engineering Laboratory at Homestake4 Geotechnical Studies at Homestake Homestake DUSEL Geotechnical Advisory Committee Ziggy Hladysz, SDSMT ( Chair ) Chris Laughton, FNAL Bill Roggenthen, SDSMT Bill Pariseau, Univ. of Utah Steve Glaser, U.C. Berkeley Herb Wang, Univ. of Wisconsin Joe Wang, LBNL

Deep Underground Science and Engineering Laboratory at Homestake5 Request for Proposals for Geotechnical Engineering Services Proposal are DUE June 20, 2008 Anticipated Start Date for Underground Work ~ Sept Objectives for Preliminary Design of Lab Modules at 4850 Level and 300 Level 1)to provide a better understanding of the rock properties 2)to characterize the rock conditions in the areas of proposed future development 3)to establish parameters and recommendations for the rock excavation design work to follow in the next phase of work for DUSEL 4)to provide geotechnical data that can be used to evaluate potential impacts that phased construction will have on the adjacent rock. Scope of Work to be undertaken at the 4850 Level Core Drilling Laboratory Tests In-Situ Tests Site Mapping

Deep Underground Science and Engineering Laboratory at Homestake Level - Existing Infrastructure

Deep Underground Science and Engineering Laboratory at Homestake Level Geology

Deep Underground Science and Engineering Laboratory at Homestake Level Drilling Plan