Purposes of Inventory 1. To maintain independence of operations. 2. To meet variation in product demand. 3. To allow flexibility in production scheduling.

Slides:



Advertisements
Similar presentations
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Advertisements

Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Inventory Control Chapter 17 2.
Chapter 17 Inventory Control 2.
DOM 511 Inventory Control 2.
1 Chapter 15 Inventory Control  Inventory System Defined  Inventory Costs  Independent vs. Dependent Demand  Basic Fixed-Order Quantity Models  Basic.
Chapter 13 Inventory Systems for Independent Demand
Inventory Management A Presentation by R.K.Agarwal, Manager (Finance), PFC.
Operations Management
Chapter 9: Lean Manufacturing © Holmes Miller 1999.
Chapter 12 Lean Manufacturing.
Just-in-Time. © The McGraw-Hill Companies, Inc., 2004 B Operations -- Prof. Juran2 Outline The Goal debrief JIT Defined The Toyota Production.
DOM 102: Principles of Operations Management Operations Scheduling
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
Operations Management Just-in-Time Systems Supplement 12
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: –what levels should be maintained.
Operations Scheduling. Scheduling in a Process-Focused Environment.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
1 Slides used in class may be different from slides in student pack Chapter 18 Synchronous Manufacturing and the Theory of Constraints  Goldratt’s Rules.
ISQA 459 Mellie Pullman 1.  JIT can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Lean Production - Objectives
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
CHAPTER 12 Inventory Control.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
1 Slides used in class may be different from slides in student pack Chapter 17 Inventory Control  Inventory System Defined  Inventory Costs  Independent.
Just-in-Time and Lean Systems
Chapter 12 Just-in-Time and Lean Manufacturing. What is JIT? (Just-in-Time) An operations philosophy involving many techniques for improving the effectiveness.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
Operations Management Operations Scheduling
Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
1 Inventory Control Operations Management For Competitive Advantage, 10 th edition C HASE, J ACOBS & A QUILANO Tenth edition Chapter 14.
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
1 Slides used in class may be different from slides in student pack Chapter 12 Lean/Just-in-Time (JIT) Production  JIT Defined  The Japanese Approach.
20-1 Inventory Management: Economic Order Quantity, JIT, and the Theory of Constraints 20.
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 12 Lean Manufacturing (Just-in-Time)
© The McGraw-Hill Companies, Inc., Chapter 14 Inventory Control.
MBA 8452 Systems and Operations Management
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Module 9: JIT & Lean Systems Operations Management as a Competitive Weapon.
© The McGraw-Hill Companies, Inc., Inventory Control.
Operations Fall 2015 Bruce Duggan Providence University College.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
Production and Operations Management: Manufacturing and Services
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Operations Fall 2015 Bruce Duggan Providence University College.
Chapter 17 Inventory Control
24-1 Inventory Management: Economic Order Quantity, JIT, and the Theory of Constraints Prepared by Douglas Cloud Pepperdine University Prepared by Douglas.
Manufacturing Planning and Control
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Synchronous Manufacturing and Theory of Constraints
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: what levels should be maintained when.
Synchronous Manufacturing
Chapter 12 Just-in-Time and Lean Systems
Chapter 12 Lean Production. Chapter 12 Lean Production.
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

Purposes of Inventory 1. To maintain independence of operations. 2. To meet variation in product demand. 3. To allow flexibility in production scheduling. 4. To provide a safeguard for variation in raw material delivery time. 5. To take advantage of economic purchase- order size.

Basic Fixed-Order Quantity Model and Reorder Point Behavior Exhibit 13.3 R = Reorder point Q = Economic order quantity L = Lead time L L QQQ R Time Number of units on hand

Inventory Costs Holding (or carrying) costs. –Costs for storage, handling, insurance, etc. Setup (or production change) costs. –Costs for arranging specific equipment setups, etc. Ordering costs. –Costs of someone placing an order, etc. Shortage costs. –Costs of canceling an order, etc.

Cost Minimization Goal Ordering Costs Holding Costs Q OPT Order Quantity (Q) COSTCOST Annual Cost of Items (DC) Total Cost By adding the item, holding, and ordering costs together, we determine the total cost curve, which in turn is used to find the Q opt inventory order point that minimizes total costs.

Basic Fixed-Order Quantity (EOQ) Model Formula Total Annual Cost = Annual Purchase Cost Annual Ordering Cost Annual Holding Cost ++ TC =Total annual cost D = Demand C = Cost per unit Q = Order quantity S = Cost of placing an order or setup cost R = Reorder point L = Lead time H = Annual holding and storage cost per unit of inventory

Fixed-Order Quantity Model with Safety Stock Formula R = Average demand during lead time + Safety stock

Determining the Value of  L The standard deviation of a sequence of random events equals the square root of the sum of the variances.

ABC Classification System Items kept in inventory are not of equal importance in terms of: – dollars invested – profit potential – sales or usage volume – stock-out penalties A B C % of $ Value % of Use So, identify inventory items based on percentage of total dollar value, where “A” items are roughly top 80 %, “B” items as next 15 %, and the lower 5% are the “C” items.

Schedule Performance Measures Meeting due dates of customers or downstream operations. Minimizing the flow time (the time a job spends in the process). Minimizing work-in-process inventory. Minimizing idle time of machines or workers.

Principles of Work Center Scheduling 1. There is a direct equivalence between work flow and cash flow. 2. The effectiveness of any job shop should be measured by speed of flow through the shop. 3. Schedule jobs as a string, with process steps back-to-back. 4. A job once started should not be interrupted.

Principles of Job Shop Scheduling (Continued) 5. Speed of flow is most efficiently achieved by focusing on bottleneck work centers and jobs. 6. Reschedule every day. 7. Obtain feedback each day on jobs that are not completed at each work center. 8. Match work center input information to what the worker can actually do.

Principles of Job Shop Scheduling (Continued) 9. When seeking improvement in output, look for incompatibility between engineering design and process execution. 10. Certainty of standards, routings, and so forth is not possible in a job shop, but always work towards achieving it.

Just-In-Time (JIT) Defined JIT: an integrated set of activities designed to achieve high-volume production using minimal inventories (RM, WIP, FG). JIT involves: – the elimination of waste in production effort. –the timing of production resources (e.g., parts arrive at the next workstation “just in time”).

JIT Demand-Pull Logic Customers Vendor Sub Fab Final Assembly

Minimizing Waste: Inventory Hides Problems Work in process queues (banks) Change orders Engineering design redundancies Vendor delinquencies Scrap Design backlogs Machine downtime Decision backlogs Inspection backlogs Paperwork backlog Example: By identifying defective items from a vendor early in the production process the downstream work is saved. Example: By identifying defective work by employees upstream, the downstream work is saved.

Kanban Japanese word for card –Pronounced ‘kahn-bahn’ (not ‘can-ban’) Authorizes production from downstream operations –‘Pulls’ material through plant May be a card, flag, verbal signal etc. Used often with fixed-size containers –Add or remove containers to change production rate

Minimizing Waste: Kanban Production Control Systems Exhibit 10.6 Storage Part A Machine Center Assembly Line Material Flow Card (signal) Flow Withdrawal kanban Production kanban

Characteristics of JIT Vendor Partnerships Few, nearby suppliers Long-term contract agreements Steady supply rate Frequent deliveries in small lots Buyer helps suppliers meet quality Suppliers use process control charts Buyer schedules inbound freight

Respect for People Level payrolls Cooperative employee unions Subcontractor networks Bottom-round management style Quality circles (Small group involvement activities)

JIT Implementation Issues Level the Facility Load Eliminate Unnecessary Activities Reorganize Physical Configuration Introduce Demand-Pull Scheduling Develop Supplier Networks

Goldratt’s Rules of Production Scheduling Do not balance capacity balance the flow. The level utilization of a nonbottleneck resource is not determined by its own potential but by some other constraint in the system. Utilization and activation of a resource are not the same. An hour lost at a bottleneck is an hour lost for the entire system. An hour saved at a nonbottleneck is a mirage.

Goldratt’s Rules of Production Scheduling (Continued) Bottlenecks govern both throughput and inventory in the system. Transfer batch may not and many times should not be equal to the process batch. A process batch should be variable both along its route and in time. Priorities can be set only by examining the system’s constraints. Lead time is a derivative of the schedule.

Goldratt’s Theory of Constraints (TOC) Identify the system constraints. Decide how to exploit the system constraints. Subordinate everything else to that decision. Elevate the system constraints. If, in the previous steps, the constraints have been broken, go back to Step 1, but do not let inertia become the system constraint.

Saving Time Bottleneck Nonbottleneck What are the consequences of saving time at each process? Rule: Bottlenecks govern both throughput and inventory in the system. Rule: An hour lost at a bottleneck is an hour lost for the entire system. Rule: An hour saved at a nonbottleneck is a mirage.

Drum, Buffer, Rope ABCDEF Bottleneck (Drum) Inventory buffer (time buffer) Communication (rope) Market Exhibit 17.9

Quality Implications of synchronous manufacturing More tolerant than JIT systems – Excess capacity throughout system. Except for the bottleneck – Quality control needed before bottleneck.

Inventory Cost Measurement: Dollar Days Dollar Days is a measurement of the value of inventory and the time it stays within an area. Dollar Days = (value of inventory)(number of days within a department) Example

Benefits from Dollar Day Measurement Marketing – Discourages holding large amounts of finished goods inventory. Purchasing – Discourages placing large purchase orders that on the surface appear to take advantage of quantity discounts. Manufacturing – Discourage large work in process and producing earlier than needed.

Comparing Synchronous Manufacturing to MRP MRP uses backward scheduling. Synchronous manufacturing uses forward scheduling.

Comparing Synchronous Manufacturing to JIT JIT is limited to repetitive manufacturing JIT requires a stable production level JIT does not allow very much flexibility in the products produced

Comparing Synchronous Manufacturing to JIT (Continued) JIT still requires work in process when used with kanban so that there is "something to pull." Vendors need to be located nearby because the system depends on smaller, more frequent deliveries.