GF REPORTS AND RECORDS LT 7.8 Enabling Objectives Describe the purpose and function of: –Closed Compartment Opening Request –Hot Work Request –Navy Gas.

Slides:



Advertisements
Similar presentations
60% of deaths come about when someone tries to rescue someone else!
Advertisements

MDPI/GOODWILL OIL AND GAS TRAINING
Module 9 Confined Space.
Confined Space (Permit-required) Entry Supervisor.
PERMIT REQUIRED CONFINED SPACE ENTRY PERMIT REQUIRED CONFINED SPACE ENTRY.
Slide 1 (of 31) Confined Space Training Permit-Required Confined Spaces.
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
Welding, Cutting, and Brazing
29 CFR CONFINED SPACE ENTRY.
29 CFR CONFINED SPACE ENTRY.
Safe Working Procedure – Confined Spaces
7.12 VENTILATION PROCEDURES ENABLING OBJECTIVES DESCRIBE the objectives for ventilating a compartment for a GFE evolution DEFINE the terms.
Confined Spaces – Part 2 An Overview of the WISHA Confined Spaces Standard.
Confined Space (Permit-required) Attendants. Entry permits - components v Space to be entered v Purpose of the entry v Date and duration of the entry.
EVERY YEAR HUNDREDS OF WORKERS ARE INJURED OR KILLED IN CONFINED SPACES. IGNORANCE OR OVERCONFIDENCE IS USUALLY THE CAUSE OF SUCH ACCIDENTS. WORKERS WHO.
Confined Spaces in Construction: Applicable Standards Stan Liang, CIH, CSP, CET KTA-Tator, Inc.
Permit Required Confined Space Entry Permit Required Confined Space Entry.
PERMIT REQUIRED CONFINED SPACES PERMIT REQUIRED CONFINED SPACES.
Confined Space Ventilation Are We Really Moving Air, or Just Making Ourselves Feel Good?
Module 2: General Working Conditions 2.5 Confined Space Entry Susan Harwood Grant Number SH F-23.
Blabo® Automated Tank Cleaning ExxonMobil 2009 Article Electrical standards Designed for operation in hazardous areas. Constructed for zone 1, and some.
1.4 EMERGENCY RESCUE OPERATIONS. 2 INTRODUCTION As Gas Free Engineering Personnel you need to know the correct procedures for safe and effective Emergency.
CONFINED SPACE AWARENESS. DEFINITION OF CONFINED SPACE Is large enough and so configured that an employee can bodily enter and perform assigned work Has.
Lesson Topic 2.2 VENTILATION Introduction As Gas Free Engineer Personnel you will be required to know the various methods and equipment used for ventilation.
Confined Space Safety Training Presentations
CONFINED SPACE ENTRY SUPERVISOR COURSE (Please Sign in)
1 Lesson Topic 3.1 CLEANING AND GAS FREEING. 2 INTRODUCTION As Gas Free Engineering Personnel you will be expected to know the various methods available.
1 THE ROLE OF THE GAS FREE ENGINEER Lesson Topic 1.2.
CONFINED SPACE ENTRY 29 CFR
AJ Gajdosik, CSP, ARM-P St. Louis ASSE Chapter Meeting July 2015.
Provide a Safe Working and Living Environment for the Crew Provide Hazard Awareness Training of a General Nature for the Crew.
Survey Results from 2014 presentation: Maintenance of Conditions/Change in Conditions Robbie Walker.
Gas Free Engineering. Damage ICON’s: Damage Pictures: Select ICON and PICTURE Area secured Contractors Cold work Field activity Gas Free Engineering HAZMAT.
GF PROCEDURES FOR PAINTING OPERATIONS ENABLING OBJECTIVES DESCRIBE the Gas Free Engineering requirements for performing spray painting in confined.
Copyright  Progressive Business Publications Permit-Required Confined Space Safety Subpart J.
1a.  A confined space is:  Large enough to enter and perform work  Limited in the way of entry or exit  Not designed for continuous occupancy 1a.
Permit-Required Confined Spaces 29 CFR Why Comply???? Confined space entry is a leading cause of occupational fatalities in this country.
CERTIFICATE CRITIQUE EXERCISE MARINE CHEMIST ASSOCIATION SECTIONAL SEMINARS 2015 Norfolk, VA. 3/7/15 New Orleans, LA. 3/28/15 Seattle, WA. 3/29/15.
HOTWORK OPERATIONS 7.13 Enabling Objectives DESCRIBE: The Gas Free Engineering requirements for welding in or on containers, compartments and tanks under.
SCP’s Instructions The 2001 edition for the first time defined the well-established relationship between the Marine Chemist and the Shipyard Competent.
GAS FREE INSPECTION AND CERTIFICATION 3.4 Introduction As Gas Free Engineering Personnel you will be required to know the requirements for certifying.
Confined Space Entry. OBJECTIVES: Upon completion of this topic you will be able to: Describe what a confined space is. Identify confined space hazards.
1 Safe Shipyard Practices Program (S2P2) Repairing Ships Safely! An 8-Hour Port of San Diego Ship Repair Association Certification Course for Shipyard.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
GAS FREE INSPECTION 7.4. ENABLING OBJECTIVES DESCRIBE the pre-inspection procedures and safety precautions when conducting GFE operations DESCRIBE the.
Jim Smith CONFINED SPACE Understanding the Space Park Requirements.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
7.9 GFE LIABILITY. ENABLING OBJECTIVES DESCRIBE the qualifications and capabilities of civilian Gas Free personnel. DESCRIBE the qualifications and capabilities.
Confined Spaces – Part 2 An Overview of the Confined Spaces Issues.
GFE DUTIES AND RESPONSIBILITIES LT 7.2. REFERENCES / ENABLING OBJECTIVES 29 CFR , OSHA PEL NTTP SURFACE SHIP SURVIVABILITY OPNAVINST.
1 Welcome to CONFINED SPACE ENTRY. 2 INSTRUCTORS Brian Hitt.
Hot Work Permit Osan AB Fire Emergency Services.
Hazards of Confined Spaces. INSTRUCTIONAL GOAL The participant till understand the various hazards associated with confined space entries and the need.
GENERAL REQUIREMENTS CFR paragraphs (a) through (l) The Competent Person has responsibility to evaluate all hazards in the vicinity of the work.
Rev. 1 © Chevron 2009 Confined Space Entry Awareness Plus.
CONFINED SPACE ENTRY TRAINING PROGRAM
NSTM 074 VOL 3 (SERIES) FAMILIARIZATION
WISHA Confined Spaces Standard
Chapter 9 Safety Permit Systems
Definition A confined space is: Large enough to enter and perform work
29 CFR CONFINED SPACE ENTRY.
VISUAL MANAGEMENT TOOL
Confined Space (Permit-required)
Definition A confined space is: Large enough to enter and perform work
Understanding the Space Park Requirements
29 CFR CONFINED SPACE ENTRY.
29 CFR CONFINED SPACE ENTRY.
MACHINERY SPACE FIRE.
Presentation transcript:

GF REPORTS AND RECORDS LT 7.8

Enabling Objectives Describe the purpose and function of: –Closed Compartment Opening Request –Hot Work Request –Navy Gas Free Certificate and Test Log –National Fire Protection Association (NFPA) Gas Free Certificate

Enabling Objectives cont’d Complete the following: –Closed Compartment Opening Request –Hot Work Request –Navy Gas Free Certificates and Test Log Describe: –What forms may be use by the NFPA Marine Chemists or Competent Person

Enabling Objectives cont’d Describe the criteria for assigning each of the following on a Gas Free Certificate: –Not Safe for Personnel/Not Safe for Hot Work –Not Safe for Personnel w/o PPE/Not Safe for Hot Work –Safe for Personnel/Safe for Hot Work –Not Safe for Personnel Inside/Safe for Hot Work Outside

Last Enabling Objective Describe: –Distribution requirements for completed Navy Gas Free Certificates

Please take out your NSTM 074 VOL 3 and find Appendix C

Gas Free Engineering Notebook Contains: –Ship’s Gas Free Inst. –Active Gas Free Chits –Inactive Gas Free Chits 1 year

Navy Reports and Records Navy: –Closed Compartment Opening Request –Hot Work Authorization –Navy Gas Free Certificate * Should be Included as Enclosures in a GFE Instruction, Available in Gas Free Log, Readily Available

Civilian Reports and Records Civilian: –NFPA Gas Free Certificate –OSHA - 74 Form –Gas Free Tags

Closed Compartment Opening Request Pg C-13 or C-29 Can be Locally Produced GFE Management Tool Initial Info and Planning for Gas Free Test Should be Submitted AT LEAST 24 HRS Prior to Evolution

Closed Compartment or Space Any Space not well Ventilated –Storerooms –Double Bottoms Spaces which Have Been… –Vacated –Closed –Sealed

CLOSED COMPARTMENT OPENING REQUEST USS _____________________ (_______) ENDORSEMENT FROM: _______________ DIVISION OFFICER EXT._______ FROM: GAS FREE ENGINEER TO: GAS FREE ENGINEER TO: ___________ DIVISION OFFICER VIA: CHIEF ENGINEER 1. PERMISSION IS REQUESTED TO ENTER: ____________ 1. APPROVED/DISAPPROVED: ______________ _______________________________________________. ______________________________________. 2. REASON FOR ENTRY: _____________________________ 2. MISCELLANEOUS REQUIRMENTS: ________________________________________________. _____________________________________ _____________________________________ 3. TOXIC MATERIALS TO BE USED: ____________________ _____________________________________ ________________________________________________. _____________________________________ _____________________________________ 4. TIME/DATE TO BE OPENED: ________________________. _____________________________________. 5. TIME/DATE TO BE CLOSED: ________________________. 6. NAMES AND RATES OF PERSONNEL TO ENTER SPACE: 3. NOTES: ________________________________________________ (A) NO ENTRY OR HOT WORK IS ________________________________________________ AUTHORIZED UNTIL SPACE HAS BEEN INSPECTED AND CERTIFIED 7. SAFETY OBSERVER AT ACCESS: ____________________. BY GAS FREE ENGINEER OR A (NAME AND RATE) DESIGNATED ASSISTANT. 8. TAGOUTS REQUIRED TO SUPPORT WORK: ________________________________________________. ___________________ _______________________ DIVISION OFFICER GAS FREE ENGINEER

CLOSED COMPARTMENT OPENING REQUEST USS ______________________ (____________) ENDORSEMENT FROM: _______________ DIVISION OFFICER EXT._______FROM: GAS FREE ENGINEER TO: GAS FREE ENGINEERTO: ___________ DIVISION OFFICER VIA: CHIEF ENGINEER 1. PERMISSION IS REQUESTED TOENTER: ____________1. APPROVED/DISAPPROVED: ______________ _______________________________________________. ______________________________________. 2. REASON FOR ENTRY: _____________________________2. MISCELLANEOUS REQUIRMENTS: ________________________________________________. _____________________________________ _____________________________________ 3. TOXIC MATERIALS TO BE USED: ____________________ _____________________________________ ________________________________________________. _____________________________________ _____________________________________ 4. TIME/DATE TO BE OPENED: ________________________. _____________________________________. 5. TIME/DATE TO BE CLOSED: ________________________. 6. NAMES AND RATES OF PERSONNEL TO ENTER SPACE:3. NOTES: ________________________________________________(A) NO ENTRY OR HOT WORK IS ________________________________________________ AUTHORIZED UNTIL SPACE HAS BEEN INSPECTED AND CERTIFIED 7. SAFETY OBSERVER AT ACCESS: ____________________. BY GAS FREE ENGINEER OR A (NAME AND RATE) DESIGNATED ASSISTANT. 8. TAGOUTS REQUIRED TO SUPPORT WORK: ________________________________________________. __________________________________________ DIVISION OFFICER GAS FREE ENGINEER 200Deck

CLOSED COMPARTMENT OPENING REQUEST USS ______________________ (_________) SERIAL NUMBER: _____________ENDORSEMENT FROM: _______________ DIVISION OFFICER EXT._______FROM: GAS FREE ENGINEER TO: GAS FREE ENGINEERTO: ___________ DIVISION OFFICER VIA: CHIEF ENGINEER 1. PERMISSION IS REQUESTED TOENTER: ____________1. APPROVED/DISAPPROVED: ______________ _______________________________________________. ______________________________________. 2. REASON FOR ENTRY: _____________________________2. MISCELLANEOUS REQUIRMENTS: ________________________________________________. _____________________________________ _____________________________________ 3. TOXIC MATERIALS TO BE USED: ____________________ _____________________________________ ________________________________________________. _____________________________________ _____________________________________ 4. TIME/DATE TO BE OPENED: ________________________. _____________________________________. 5. TIME/DATE TO BE CLOSED: ________________________. 6. NAMES AND RATES OF PERSONNEL TO ENTER SPACE:3. NOTES: ________________________________________________(A) NO ENTRY OR HOT WORK IS ________________________________________________ AUTHORIZED UNTIL SPACE HAS BEEN INSPECTED AND CERTIFIED 7. SAFETY OBSERVER AT ACCESS: ____________________. BY GAS FREE ENGINEER OR A (NAME AND RATE) DESIGNATED ASSISTANT. 8. TAGOUTS REQUIRED TO SUPPORT WORK: ________________________________________________. __________________________________________ DIVISION OFFICER GAS FREE ENGINEER CHAIN LOCKER Deck

Compartment to be Opened Allows GFE to Evaluate Whether Authority is Needed (IDLH) Allows GFE to Research Previous Inspections of that Compartment

CLOSED COMPARTMENT OPENING REQUEST USS ______________________ (_________) ENDORSEMENT FROM: _______________ DIVISION OFFICER EXT._______FROM: GAS FREE ENGINEER TO: GAS FREE ENGINEERTO: ___________ DIVISION OFFICER VIA: CHIEF ENGINEER 1. PERMISSION IS REQUESTED TOENTER: ____________1. APPROVED/DISAPPROVED: ______________ _______________________________________________. ______________________________________. 2. REASON FOR ENTRY: _____________________________2. MISCELLANEOUS REQUIRMENTS: ________________________________________________. _____________________________________ _____________________________________ 3. TOXIC MATERIALS TO BE USED: ____________________ _____________________________________ ________________________________________________. _____________________________________ _____________________________________ 4. TIME/DATE TO BE OPENED: ________________________. _____________________________________. 5. TIME/DATE TO BE CLOSED: ________________________. 6. NAMES AND RATES OF PERSONNEL TO ENTER SPACE:3. NOTES: ________________________________________________(A) NO ENTRY OR HOT WORK IS ________________________________________________ AUTHORIZED UNTIL SPACE HAS BEEN INSPECTED AND CERTIFIED 7. SAFETY OBSERVER AT ACCESS: ____________________. BY GAS FREE ENGINEER OR A (NAME AND RATE) DESIGNATED ASSISTANT. 8. TAGOUTS REQUIRED TO SUPPORT WORK: ________________________________________________. __________________________________________ DIVISION OFFICER GAS FREE ENGINEER 200 CHAIN LOCKER CLEAN/INSPECT Deck

Reason for Entry Allows GFE to Prioritize by Event Ensures GFE Knows Exactly what is Going to be Taking Place in Space –Events that can Change Atmospheric Conditions

CLOSED COMPARTMENT OPENING REQUEST USS ______________________ (___________) ENDORSEMENT FROM: _______________ DIVISION OFFICER EXT._______FROM: GAS FREE ENGINEER TO: GAS FREE ENGINEERTO: ___________ DIVISION OFFICER VIA: CHIEF ENGINEER 1. PERMISSION IS REQUESTED TOENTER: ____________1. APPROVED/DISAPPROVED: ______________ _______________________________________________. ______________________________________. 2. REASON FOR ENTRY: _____________________________2. MISCELLANEOUS REQUIRMENTS: ________________________________________________. _____________________________________ _____________________________________ 3. TOXIC MATERIALS TO BE USED: ____________________ _____________________________________ ________________________________________________. _____________________________________ _____________________________________ 4. TIME/DATE TO BE OPENED: ________________________. _____________________________________. 5. TIME/DATE TO BE CLOSED: ________________________. 6. NAMES AND RATES OF PERSONNEL TO ENTER SPACE:3. NOTES: ________________________________________________(A) NO ENTRY OR HOT WORK IS ________________________________________________ AUTHORIZED UNTIL SPACE HAS BEEN INSPECTED AND CERTIFIED 7. SAFETY OBSERVER AT ACCESS: ____________________. BY GAS FREE ENGINEER OR A (NAME AND RATE) DESIGNATED ASSISTANT. 8. TAGOUTS REQUIRED TO SUPPORT WORK: ________________________________________________. __________________________________________ DIVISION OFFICER GAS FREE ENGINEER 200 CHAIN LOCKER CLEAN/INSPECT Deck ETHYLENE GLYCOL

Toxic Materials to be Used Allows GFE to Determine Respirator and Ventilation RequirementsAllows GFE to Determine Respirator and Ventilation Requirements Allows GFE to Preplan for Re- testingAllows GFE to Preplan for Re- testing Assists in Determination of Re-test PeriodicityAssists in Determination of Re-test Periodicity GFE Screen Illegal MaterialsGFE Screen Illegal Materials

CLOSED COMPARTMENT OPENING REQUEST USS ______________________ (__________) ENDORSEMENT FROM: _______________ DIVISION OFFICER EXT._______FROM: GAS FREE ENGINEER TO: GAS FREE ENGINEERTO: ___________ DIVISION OFFICER VIA: CHIEF ENGINEER 1. PERMISSION IS REQUESTED TOENTER: ____________1. APPROVED/DISAPPROVED: ______________ _______________________________________________. ______________________________________. 2. REASON FOR ENTRY: _____________________________2. MISCELLANEOUS REQUIRMENTS: ________________________________________________. _____________________________________ _____________________________________ 3. TOXIC MATERIALS TO BE USED: ____________________ _____________________________________ ________________________________________________. _____________________________________ _____________________________________ 4. TIME/DATE TO BE OPENED: ________________________. _____________________________________. 5. TIME/DATE TO BE CLOSED: ________________________. 6. NAMES AND RATES OF PERSONNEL TO ENTER SPACE:3. NOTES: ________________________________________________(A) NO ENTRY OR HOT WORK IS ________________________________________________ AUTHORIZED UNTIL SPACE HAS BEEN INSPECTED AND CERTIFIED 7. SAFETY OBSERVER AT ACCESS: ____________________. BY GAS FREE ENGINEER OR A (NAME AND RATE) DESIGNATED ASSISTANT. 8. TAGOUTS REQUIRED TO SUPPORT WORK: ________________________________________________. __________________________________________ DIVISION OFFICER GAS FREE ENGINEER 200 CHAIN LOCKER CLEAN/INSPECT Deck ETHYLENE GLYCOL JAN JAN2004

Time and Date Opened/Closed Needed to Establish Retest Schedule (max 8 hours) Allows for Efficient Management of Time and Resources

CLOSED COMPARTMENT OPENING REQUEST USS ______________________ (________) ENDORSEMENT FROM: _______________ DIVISION OFFICER EXT._______FROM: GAS FREE ENGINEER TO: GAS FREE ENGINEERTO: ___________ DIVISION OFFICER VIA: CHIEF ENGINEER 1. PERMISSION IS REQUESTED TOENTER: ____________1. APPROVED/DISAPPROVED: ______________ _______________________________________________. ______________________________________. 2. REASON FOR ENTRY: _____________________________2. MISCELLANEOUS REQUIRMENTS: ________________________________________________. _____________________________________ _____________________________________ 3. TOXIC MATERIALS TO BE USED: ____________________ _____________________________________ ________________________________________________. _____________________________________ _____________________________________ 4. TIME/DATE TO BE OPENED: ________________________. _____________________________________. 5. TIME/DATE TO BE CLOSED: ________________________. 6. NAMES AND RATES OF PERSONNEL TO ENTER SPACE:3. NOTES: ________________________________________________(A) NO ENTRY OR HOT WORK IS ________________________________________________ AUTHORIZED UNTIL SPACE HAS BEEN INSPECTED AND CERTIFIED 7. SAFETY OBSERVER AT ACCESS: ____________________. BY GAS FREE ENGINEER OR A (NAME AND RATE) DESIGNATED ASSISTANT. 8. TAGOUTS REQUIRED TO SUPPORT WORK: ________________________________________________. __________________________________________ DIVISION OFFICER GAS FREE ENGINEER 200 CHAIN LOCKER CLEAN Deck ETHYLENE GLYCOL JAN JAN2004 BM3 DUGAN SN BLUTARSKI

Names and Rates of Personnel to Enter Allows GFE to Check Personnel on Equipment Knowledge (Respiratory and Ventilation) Ensure Responsible Person is in Charge

CLOSED COMPARTMENT OPENING REQUEST USS ______________________ (____________) ENDORSEMENT FROM: _______________ DIVISION OFFICER EXT._______FROM: GAS FREE ENGINEER TO: GAS FREE ENGINEERTO: ___________ DIVISION OFFICER VIA: CHIEF ENGINEER 1. PERMISSION IS REQUESTED TOENTER: ____________1. APPROVED/DISAPPROVED: ______________ _______________________________________________. ______________________________________. 2. REASON FOR ENTRY: _____________________________2. MISCELLANEOUS REQUIRMENTS: ________________________________________________. _____________________________________ _____________________________________ 3. TOXIC MATERIALS TO BE USED: ____________________ _____________________________________ ________________________________________________. _____________________________________ _____________________________________ 4. TIME/DATE TO BE OPENED: ________________________. _____________________________________. 5. TIME/DATE TO BE CLOSED: ________________________. 6. NAMES AND RATES OF PERSONNEL TO ENTER SPACE:3. NOTES: ________________________________________________(A) NO ENTRY OR HOT WORK IS ________________________________________________ AUTHORIZED UNTIL SPACE HAS BEEN INSPECTED AND CERTIFIED 7. SAFETY OBSERVER AT ACCESS: ____________________. BY GAS FREE ENGINEER OR A (NAME AND RATE) DESIGNATED ASSISTANT. 8. TAGOUTS REQUIRED TO SUPPORT WORK: ________________________________________________. __________________________________________ DIVISION OFFICER GAS FREE ENGINEER 200 CHAIN LOCKER CLEAN Deck ETHYLENE GLYCOL JAN JAN2004 BM3 DUGAN SN BLUTARSKI BM2 CISNEROS

Safety Observer Not Optional Included in all Operational Briefs Will Maintain Comms between Scene and Rescue Control Point

CLOSED COMPARTMENT OPENING REQUEST USS ______________________ (__________) ENDORSEMENT FROM: _______________ DIVISION OFFICER EXT._______FROM: GAS FREE ENGINEER TO: GAS FREE ENGINEERTO: ___________ DIVISION OFFICER VIA: CHIEF ENGINEER 1. PERMISSION IS REQUESTED TOENTER: ____________1. APPROVED/DISAPPROVED: ______________ _______________________________________________. ______________________________________. 2. REASON FOR ENTRY: _____________________________2. MISCELLANEOUS REQUIRMENTS: ________________________________________________. _____________________________________ _____________________________________ 3. TOXIC MATERIALS TO BE USED: ____________________ _____________________________________ ________________________________________________. _____________________________________ _____________________________________ 4. TIME/DATE TO BE OPENED: ________________________. _____________________________________. 5. TIME/DATE TO BE CLOSED: ________________________. 6. NAMES AND RATES OF PERSONNEL TO ENTER SPACE:3. NOTES: ________________________________________________(A) NO ENTRY OR HOT WORK IS ________________________________________________ AUTHORIZED UNTIL SPACE HAS BEEN INSPECTED AND CERTIFIED 7. SAFETY OBSERVER AT ACCESS: ____________________. BY GAS FREE ENGINEER OR A (NAME AND RATE) DESIGNATED ASSISTANT. 8. TAGOUTS REQUIRED TO SUPPORT WORK: ________________________________________________. __________________________________________ DIVISION OFFICER GAS FREE ENGINEER 200 CHAIN LOCKER CLEAN Deck ETHYLENE GLYCOL JAN JAN2004 BM3 DUGAN SN BLUTARSKI BM2 CISNEROS ANCHOR WINDLASS

Tag outs Ensures Space is Safe and Prepared for Entry Allows GFE to Spot Check

CLOSED COMPARTMENT OPENING REQUEST USS ______________________ (___________) ENDORSEMENT FROM: _______________ DIVISION OFFICER EXT._______FROM: GAS FREE ENGINEER TO: GAS FREE ENGINEERTO: ___________ DIVISION OFFICER VIA: CHIEF ENGINEER 1. PERMISSION IS REQUESTED TOENTER: ____________1. APPROVED/DISAPPROVED: ______________ _______________________________________________. ______________________________________. 2. REASON FOR ENTRY: _____________________________2. MISCELLANEOUS REQUIRMENTS: ________________________________________________. _____________________________________ _____________________________________ 3. TOXIC MATERIALS TO BE USED: ____________________ _____________________________________ ________________________________________________. _____________________________________ _____________________________________ 4. TIME/DATE TO BE OPENED: ________________________. _____________________________________. 5. TIME/DATE TO BE CLOSED: ________________________. 6. NAMES AND RATES OF PERSONNEL TO ENTER SPACE:3. NOTES: ________________________________________________(A) NO ENTRY OR HOT WORK IS ________________________________________________ AUTHORIZED UNTIL SPACE HAS BEEN INSPECTED AND CERTIFIED 7. SAFETY OBSERVER AT ACCESS: ____________________. BY GAS FREE ENGINEER OR A (NAME AND RATE) DESIGNATED ASSISTANT. 8. TAGOUTS REQUIRED TO SUPPORT WORK: ________________________________________________. __________________________________________ DIVISION OFFICER GAS FREE ENGINEER 200 CHAIN LOCKER CLEAN/INSPECT Deck ETHYLENE GLYCOL JAN JAN2004 BM3 DUGAN SN BLUTARSKI BM2 CISNEROS ANCHOR WINDLASS Deck VENTILATE 24 HOURS PRIOR TO ENTRY

Hot Work Authorization Request Allows Divisions to Request Hot Work Services Management Tool to Optimize Use of Time, Personnel and Resources Hot Work Certificates: –Page C-16 –Gas Free Certificate –Locally Prepared

22 JAN 04 BUNKS L JAN JAN 04 FN TIMMY EN3 SHMUCKATELLI GSEFN ANDERSON HT2 WATTS Nathan W. Watts HT JAN JAN 04 FN Timmy EN3 Shmuckatelli GSEFN Anderson Russell S. King, HT1

Navy Gas Free Certification and Test Log Records the Conditions Existing within a Space at Time Test is Conducted Intended to Eliminate Need for Hot Work Request Form Available Through Stock System –OPNAV 5100/16(5-91) –Stock #: 0107-LF

USS NAVIN R. JOHNSON CHAIN LOCKER ( Q) CLEAN AND INSPECT JAN JAN 04 DILUTION - 1 RAMFAN EXHAUSTING FROM SPACE THROUGH WTD TO WEATHER. CONTINUOUS OPERATION WHILE PERSONNEL IN SPACE. ALL PERSONNEL USE RHINE AIR PUMP, AND COVER- ALLS. RE-INSPECT EVERY TWO HOURS. SAFETY OBSERVER MAINTAIN COMMS WITH WORKERS AND RESCUE CONTROL POINT (AT DC CENTRAL) USING WIFCOM. N/A

USS NAVIN R. JOHNSON CHAIN LOCKER ( Q) CLEAN AND INSPECT JAN JAN 98 DILUTION - 1 RAMFAN EXHAUSTING FROM SPACE THROUGH WTD TO WEATHER. CONTINUOUS OPERATION WHILE PERSONNEL IN SPACE. ALL PERSONNEL USE RHINE AIR PUMP, AND COVER- ALLS. RE-INSPECT EVERY TWO HOURS. SAFETY OBSERVER MAINTAIN COMMS WITH WORKERS AND RESCUE CONTROL POINT USING WIFCOM. N/A 3 Ventilation Options: Local Exhaust Ventilation: Ex.: Welding, Painting, Using Solvents Dilution Ventilation Ex.: Reducing Toxins, Controlling Flammable Vapors General Exhaust Ventilation Ex.: Providing Cool Comfort Air in a Hazard-Free Atmosphere

USS NAVIN R. JOHNSON CHAIN LOCKER ( Q) CLEAN AND INSPECT JAN JAN 98 DILUTION - 1 RAMFAN EXHAUSTING FROM SPACE THROUGH WTD TO WEATHER. CONTINUOUS OPERATION WHILE PERSONNEL IN SPACE. ALL PERSONNEL USE RHINE AIR PUMP, AND COVER- ALLS. RE-INSPECT EVERY TWO HOURS. SAFETY OBSERVER MAINTAIN COMMS WITH WORKERS AND RESCUE CONTROL POINT USING WIFCOM. N/A Observe “2 Person Rule” Personal Protective Equipment Respiratory Equipment Rescue Control Point Communications Requirements Continuous or Periodic Testing REQUIREMENTS/ CONCLUSIONS

20.8% 0 %LEL H2S CO 0 ppm X 19.5 <O 2 <22 LEL<10 PEL 10 IDLH 100 PEL 50 IDLH 1200 UNITY: 0

19 % 11 %LEL H2S CO 11 0 ppm 1300 ppm X 19.5 <O 2 <22 LEL<10 PEL 10 IDLH 100 PEL 50 IDLH 1200 Oxygen deficient or rich IDLH Atmosphere Danger of Fire or Explosion in Presence of Hotwork NOT SAFE FOR PERSONNEL/ NOT SAFE FOR HOT WORK

20 % 2 %LEL H2S CO 6 ppm 25 ppm X 19.5 <O 2 <22 LEL<10 PEL 10 IDLH 100 PEL 50 IDLH 1200 Provides provisional entry into space. Toxics exceed PEL or Unity, but less than IDLH Explosives less than 10% Hot work prohibited or not requested NOT SAFE FOR PERSONNEL W/O PROTECTION / NOT SAFE FOR HOT WORK UNITY: >1

20 % 2 %LEL H2S CO 4 ppm 20 ppm X 19.5 <O 2 <22 LEL<10 PEL 10 IDLH 100 PEL 50 IDLH 1200 UNITY: <1 Toxics below PEL Sufficient oxygen Danger of explosion or excessive toxicants in presence of hot work or hot work not requested SAFE FOR PERSONNEL/ NOT SAFE FOR HOTWORK

20 % 0 %LEL H2S CO 1 ppm 10 ppm X 19.5 <O 2 <22 LEL<10 PEL 10 IDLH 100 PEL 50 IDLH 1200 UNITY: <1 Oxygen between 19.5% And 22% Toxics below PEL All flammables removed Boundary spaces protected SAFE FOR PERSONNEL/ SAFE FOR HOTWORK

X Pressed up or Inerted JTHIS IS AN EMERGENCY PROCEDURE AND NOT ONE USED ROUTINELY NOT SAFE FOR PERSONNEL INSIDE/ SAFE FOR HOTWORK OUTSIDE Pressed up w/ WATER OR Inerted w/ Nitrogen, Carbon Dioxide, etc.

C FN TIMMY QEN3 SMITH EGSEFN JACK J Oband o I.B.Timmy D. Smith J Jack 1718 J Phillips W Curry

When is CO’s Signature Required? Gas Freeing an IDLH Space Gas Freeing for Civilian Contractors Gas Freeing for Foreigner Overseas Hot Work within 5 ft of a Magazine

Distribution All Accesses to the Space GFE Files (original) Division Requesting Services DC Central Officer of the Deck (Inport or Underway) * Must be Kept for 1 yr Minimum

CIVILIAN CONTRACTOR FORMS –Used to record Gas Free results –NOT valid for your ships personnel –ONLY if it is for QA GAS DETECTION TAGS/ NFPA GAS FREE CERTIFICATE

DCAMS GFE/FM MODULE

PINK – JP-5 TANKS NOT REQUIRED TO BE BALLASTED PINK /BLUE – JP-5 TO BE BALLASTED PINK STRIPES – JP-5 SERVICE TANKS YELLOW STRIPES– FUEL OIL SERVICE TANKS AND SETTLING TANKS YELLOW – FUEL OIL TANKS NOT REQUIRED TO BE BALLASTED YELLOW/GREEN – FUEL OIL TANKS TO BE BALLASTED BLUE – FRESH WATER TANKS YELLOW/PINK – GASOLINE TANKS BLUE STRIPES – RESERVE FEED WATER TANKS GREEN – DAMAGE CONTROL VOIDS TBD VOIDS OR OTHER SPACES (OVERLAY TO BE DETERMINED) KEY LIQUID LOAD COLOR CODE FOR eDCAMS OVERLAYS “TANKS”

Fresh Water FO Tanks required to be Ballasted Gasoline Tanks JP-5 Tanks to be Ballasted JP-5 Tanks not required to be ballasted Damage Control Voids

TANK & VOID COMPARTMENT INFO TAB 1 0f 5

TANK & VOID COMPARTMENT INFO TAB 2 0f 5

TANK & VOID COMPARTMENT INFO TAB 3 0f 5

TANK & VOID COMPARTMENT INFO TAB 4 0f 5

TANK & VOID COMPARTMENT INFO TAB 5 0f 5

COLD WORK IDLH PAINTING VENTILATION HAZMAT IN USE FIELD ACTIVITY CONTRACTORS HOT WORK WARNING AREA SECURE STOP SAFETY / FIRE MARSHALL ICONS GAS FREE ENGINEERING SHIPS FORCE

GAS FREE ENGINEERING

HOT WORK

IDLH

COLD WORK

PAINTING

VENTILATION

HAZMAT IN USE

WARNING

FIELD ACTIVITY

AREA SECURE

SHIP’S FORCE

CONTRACTORS

Questions…? Summary! We discussed Forms, Records, Logs, Certificate Categories and Distribution

Review Questions... What are the Requirements for a Space to be Considered “Safe for Personnel/Safe for Hot Work”? ~ 19.5% < O2 < 22% ~ Toxics < PEL ~ All Flammables Removed ~ Boundary Spaces Protected

Question # 2... When is the CO’s Signature Required on a Gas Free Certificate? ~ Gas Freeing for a Civilian ~ Gas Freeing an IDLH Space ~ Hot Work within 5 feet of a magazine

Question # 3 What is the Distribution for GFE Certificates? ~ Gas Free Log ~ DC Central ~ All Accesses to the Space ~ Division Requesting Work ~ OOD