RPC Gas System Operation Report for October, 2013 - Changguo Lu, Hansheng Sun.

Slides:



Advertisements
Similar presentations
E E 2415 Lecture 16 2 nd Order High Pass, Low Pass and Band Reject Filters.
Advertisements

FUNCTIONAL ICT LEVEL 2 Advanced Excell. Data types.
Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
Hazmat Industry Technician. Types of Equipment Monitoring equipment Detection devices Air sampling systems.
Blackwood Fire Company Stihl Chainsaw Maintenance.
- Flexible Hoses- Ring Housing - Nitrogen Tank-Collection Cylinder - High Pressure Water Tank- Flow meter - Gas Regulator- Water Filter - Pressure.
1 Monitor of Isobutane Content in the RPC Gas Mixture Changguo Lu, Kirk McDonald Princeton University (10/22/2008)
© 2003 Swagelok Company Ultrahigh-Purity Gas Filters SCF Series.
Steve Hahn, CDF Meeting - October 7, CDF Operations Summary Shutdown progress  Work finishing up in west and east bores COT  Loose cables SVX 
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Mitsubishi RA90 4 axis Wire EDM
Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)
E.H. #1 RPC Gas System Commissioning  “Leaky” modules’ study 1 Changguo Lu, Princeton University Qingmin Zhang, IHEP Shih-Kai Lin, University of Houston.
Soil Expectation Value (SEV) Financial criteria used to make even-aged timber management decisions. Simply the year zero value of a perpetual series of.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Daya Bay RPC Gas System Installation at EH#1 Lu Changguo 1Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Our original gas system installation.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
The Water Cycle Step 1 - Moisture condenses in the sky to form clouds.
PH and ICP Techniques Clemson. pH quality control checks Scoop 2 checks One blank Double scoop 6 samples Tag set with lab number, check, and blank positions.
Arithmetic Sequences Explicit Formula.
C. Lu, K.T. McDonald RPC Flammable Gas Monitor April 15, RPC Flammable Gas Monitor Based on Gas Chromatography Changguo Lu, Kirk T. McDonald Princeton.
 P&I Diagram  Gas Room Controls  Gas Panels Controls in the Hall  GUI  Oxygen Sensor Cart.
EH#1 RPC Gas System Repair Report - Zhijian Zhang; Y. Lei; Qiang Xiao & Changguo Lu 11/5/2013.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Chap 1 Introduction. What is OS? OS is a program that interfaces users and computer hardware. Purpose: Provides an environment for users to execute programs.
Figure 6.19 Energy Flow in a Grassland Ecosystem (step 5) 4th trophic level Tertiary consumers 3rd trophic level Secondary consumers 2nd trophic.
The RPC Closed loop Gas System Slides from Bianco and Guida.
ISX12 G & ISL G Cold Weather Operation 1. ISX12 G and ISL G Cold Weather Operation  Cold weather affects CEGR SI natural gas engines differently compared.
1 Daya Bay RPC Gas Safety System - Gas Cabinet Test Report Changguo Lu, Kirk McDonald Princeton University (October 11, 2009)
RPC gas purity During 2/18 – 2/26/2013 EH#1 RPC gas flow rate showed anomaly, the total gas and branch #1 flow rate displayed a bump, but all four gases.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Lecture 17 Op Amp Filters Low Pass and High Pass
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
Beginners Rounding. A Poem to help you remember how to round… Find your place number. Look right next door. 4 or less just ignore. 5 or more, add 1 more.
RPC Operation Jilei, Qingmin, Changguo, Ningzhe 2013/4/3.
1DEN/CAD/DTN/DIR Genova 2010 April 22nd LEADER WP6 Task 6.3 Assessment, validation and adaptation of oxygen control and purification strategy (CEA-5, ENEA-1,
Solving Quadratics Review. We must solve to get x 2 by itself 1 st !
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Balances The balance is an instrument which measures the mass of a body or substance using the gravity force which acts on that body At present, there.
Meeting RPC Gas Task Force Meeting – 15 A. Sharma January 21st, 2009
st significant figure Significant figures Significant figures 1 st significant figure.
Boiler Energy Saver Advanced Boiler Controls. Most boiler controls at present consist of a switch!
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
Humidity Water Vapour in the Air. The more water vapour in the atmosphere A) the air becomes heavier. B) the air becomes lighter. C) the air stays the.
Liquid Dehydration System
Cost Curves & Competitive Markets Test
Learning the Multiplication Facts Part 1
M/Z Cal Issues at high mass loadings
Beginners Rounding.
وكيفية عمل التقدير النجمي
The Water Cycle.
4.2 Energy Flow in Ecosystems
Sales Had the 2nd Largest Drop in the Last 6 Months
1st Quarter Project Due: Friday, October 2.
Pressure drop in compressed air system
Switch Blocks check a value and choose a path based on that value
Power flow (BTRA) Park / Neutral Engine F2 (1-2) B2 (Lo-Re)
C9600/C9800 Auto Paper Thickness Detection
مديريت موثر جلسات Running a Meeting that Works
Problem Set #3 – Part 3 - Remediation
Date, location 1.
Comparability Report Access in WVEIS WOW
October 2014 Star Data Prior to the C.A.F.E. Reading Initiative these were the results attained.
Graphic Design Semester 1 Final Exam
1st Quarter Project Due: Friday, October 2.
1st System with 2 thermal links Earth/Ground at Sheath
Presentation transcript:

RPC Gas System Operation Report for October, Changguo Lu, Hansheng Sun

RPC gas system is running smoothly in October. We have preformed some system maintenance: Replaced saturated moisture filters for 3 Gas Chromatograph systems; Readjusted the zero point for all gas flow controllers; Adjusted the flammable gas sensor’s zero point.

1-st and 2-nd drops were due to power shutdown, manually restored the gas flow. The causes for following several drops are not known yet. Gas flow rate of EH#1:

Gas flow rate of EH#2: Two spike/drops were due to power shutdown.

Gas flow rate of EH#3: One drop was due to power shutdown.