Cooperation on Regional Siting: How Is It Working - A California Perspective Dian M. Grueneich, Commissioner California Public Utilities Commission National.

Slides:



Advertisements
Similar presentations
CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
Advertisements

1 Sunrise Powerlink and Southwest Powerlink Reliability Performance Evaluation Double Line Outage Probability Analysis March 6, 2008.
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
Energy Policy Act of 2005 Section 1221 & 368 Update Board Meeting – Los Cabos, Mexico December 7 & 8, 2006.
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
Page 1 PCC Meeting October 25, 2007 PCC and TEPPC Coordination of Roles and Responsibilities in Regional Planning Brian Silverstein and Robert Kondziolka.
WGA West-wide Renewable Energy Zone (WREZ) Project.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
C A L I F O R N I A E N E R G Y C O M M I S S I O N California Energy Commission Electric Vehicle Activities Pat Perez California Energy Commission Joint.
Department of Water and Power City of Los Angeles Renewables Portfolio Standard (RPS) Master Plan Building Out Opportunities October.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
CALIFORNIA’S PROGRESS IN RENEWABLE ENERGY November 2012 Michael Picker Senior Advisor to the Governor for Renewable Energy Facilities.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.
Binational Desalination: Past Studies and Present Opportunities Tom McCann Manager, Resource Planning & Analysis June 20, 2008.
1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.
ISO Grid Planning Presentation to CREPC October 1, 2002
Charles Hosken, General Manager Imperial Irrigation District
Transmission Expansion in the Western U.S. Transmission Policy, Incentives, and Expansions in the Western States Marcus Wood Stoel Rives LLP 900 SW Fifth.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
1 Clean Energy, A Strong Economy, and a Healthy Environment William J. Keese Western Governors’ Association June 1, 2007 European Insulation Manufacturers.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
Pat Wood III, Chairman Federal Energy Regulatory Commission Bringing Power to California Customers Silicon Valley Manufacturing Group May 27, 2004.
Southwest Renewable Energy Transmission Conference May 21, 2010 Jeff Mechenbier Director Transmission & Distribution Planning and Contracts.
California Public Utilities Commission Update to the Senate Energy, Utilities and Communications Committee Michael R. Peevey President CA Public Utilities.
California Energy Commission Strategic Transmission Planning and Corridors IEPR Commissioner Workshop on Landscape-Scale Environmental Evaluations for.
Department of Water and Power City of Los Angeles Planning to Meet the Challenge “Greening LA” February 2007.
R / I Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code :15pm.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM IEPR Workshop Southern California Reliability: Transmission System Additions.
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
City of Port Angeles Strategic Planning Workshop for Power Supply June 7, 2011 Scott Corwin Executive Director Public Power Council.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
California Energy Commission Transmission Interconnection and the California Energy Commission Generator Licensing Process PANC 2010 Annual Seminar San.
Renewable & Alternative Power Senate Energy, Utilities & Communications Committee Stuart R. Hemphill Director, Renewable and Alternative Power Southern.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
PRESENTATION TO THE SENATE ENERGY, UTILITIES AND COMMUNICATIONS COMMITTEE ON THE 2006 WORK PLAN AND SB 960 COMPLIANCE Michael R. Peevey President CA Public.
1 CREPC 101 September 19, 2005 San Diego. 2 CREPC 101 CREPC History – Doug Larson Operation of Committee – Marsha Smith Relationship with other Western.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
California Energy Commission An Overview of the Renewable Energy Transmission Initiative (RETI 1.0) Joint Agency Workshop to Introduce the Renewable Energy.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Imperial Valley Study Group Transmission Planning Collaborative 2005 California Geothermal Summit June 9, 2005 California Geothermal Energy Collaborative.
SDG&E Generation Additions Jim Avery Chief Development Officer.
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
California Energy Commission California’s Transmission Planning Experience for Renewable Energy Joint Agency Workshop to Introduce the Renewable Energy.
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
Flynn & Associates1 SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002.
SunZia Project Description
Nogales DC Tie Capacity
Presentation transcript:

Cooperation on Regional Siting: How Is It Working - A California Perspective Dian M. Grueneich, Commissioner California Public Utilities Commission National Electricity Delivery Forum February 15, 2006

Commissioner Dian M. Grueneich February 15, Overview California’s reliance on transmission imports Proposed California transmission projects Federal and regional transmission efforts California’s siting challenges Conclusions

Commissioner Dian M. Grueneich February 15, California’s Reliance on Imported Electricity

Commissioner Dian M. Grueneich February 15, Proposed California Transmission Projects SCE’s Devers-Palo Verde 2 Increases import capacity from Arizona in LA Basin by 1,200 MW; projected on-line date Summer 2009; estimated costs $600M SDG&E’s Sunrise Powerlink Increases import capacity into San Diego Region on Southwest Powerlink (SWPL) by 1,000 MW; projected on-line date 2010; estimated cost $1-1.4B SCE’s Tehachapi Region Projects Provides 700 MW of capacity from wind-rich resource area into LA Basin; initial phases projected on-line date 2009; estimated cost $225M Green Path (joint venture of LADWP, IID, & Citizens) Accesses renewables and increases transfer capacity into San Diego and LA regions; projected on-line date 2010; non-jurisdictional project

Commissioner Dian M. Grueneich February 15, Devers-Palo Verde 2 Vista Devers Hassayampa Existing DPV1 Valley Serrano Upgrade existing 230kV Transmission Lines and Substations Palo Verde Harquahala CaliforniaArizona Mexico Pacific Ocean San Diego Los Angeles Phoenix 500 kV New DPV2 Mountainview San Bernardino

Commissioner Dian M. Grueneich February 15, Sunrise Powerlink

Commissioner Dian M. Grueneich February 15, Tehachapi Region Projects

Commissioner Dian M. Grueneich February 15, Green Path LADWP Transmission Project IID/Citizens San Felipe Project IID Transmission Upgrades ARIZONACALIFORNIA

Commissioner Dian M. Grueneich February 15, Recent Challenges for California Project Siting Coordination with federal agencies (e.g., slow federal agency response) Ensure project proponents are ready (e.g., delay in receiving environmental work despite submitted applications) Statutory obligation for both California ISO and CPUC to determine project need Ensure necessary state-based ratemaking for transmission projects for renewables absent federal policy Renewables projects have different development pattern than traditional central station generation Renewables “trunklines” needed as alternate designation to network vs. gen-tie upgrade

Commissioner Dian M. Grueneich February 15, Regional Transmission Siting Efforts Regional planning efforts laudable but planning at this level holds more promise than siting due to individual state laws STEP transmission planning process resulted in both DPV2 & Sunrise projects, now under review in California WECC effort to look at regional planning for economic transmission lines welcome as added technical input In the west, do we have too many regional transmission planning entities? WECC, STEP, RMATS, NTAC, SWAP, SSG-WI, CREPC, WGA, WIEB… Regional efforts need to accommodate state objectives, including RPS requirements and goals

Commissioner Dian M. Grueneich February 15, How to Translate Good Regional Planning Efforts into Good Siting Processes? Good siting processes requires diligent project management at the state level Coordination, communication and cooperation among involved states & agencies Robust process makes the final determination legally sound, critical for large infrastructure investments Must coordinate with other state and federal agencies National Interest Corridors not enough as they will not cover all project possibilities and proposals California’s 12 month statutory timeline for project review presents no conflict with EPAct 2005 federal backstop siting authority

Commissioner Dian M. Grueneich February 15, Conclusions Regional planning efforts can identify needed projects Need coordination with federal agencies beyond National Interest Corridors Siting requires good project management and focused state permitting staff, not just good institutional relationships (those help too) Need federal ratemaking flexibility to accommodate state policy objectives, especially for renewables