University of Calgary Continuing Education Construction Contract Law and Documents Week 12 Changes Delays Claims Contract Documentation.

Slides:



Advertisements
Similar presentations
Construction Delays & CPM Schedules
Advertisements

Managing Construction Risks
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
ABC Change Orders College of Environmental Design
TOTAL QUALITY MANAGEMENT (TQM) Increasing Productivity.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Funds administration, also referred to as funds control, funds disbursement, funds management, and escrow, is a method that sureties use to offset the.
Skilled Trades 1201: Unit 2 Topic 1 Technology and the Workplace Part 4.
Time Is Money - Delay Claims in Construction June 18, 2012
4/13/2017 1:54 PM.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Project Cost Management Estimation Budget Cost Control
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
/1.401/ESD.018 Project Management Lecture 20 Project Reporting Project Close-out Samuel Labi and Fred Moavenzadeh Massachusetts Institute of Technology.
PROCEDURES FOR SELECTING THE CONTRACTOR
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Construction Engineering 221 Contracts & Contractor Procurement.
Construction Engineering 221 Cost Estimating and Bidding.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Implications of a contractor Failure. Implications of Contract Failure Costs –Lost Revenue –Poor Service Delivery –Cost and effort of ongoing risk mitigation.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Facilities Institute July , 2012 Houston, Texas CONSTRUCTION AND RENOVATION WARRANTY/GUARANTEE What Do You Get And When Does It.
On Target Group Coaching
March 27,2007CSMS - Savannah Negotiating a Fair Contract for Software and Services John Lateulere.
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
Chapter 16: Audit of Cash Balances
Press the F5 key to continue Project Manager is a web based Project Management Tool. All your work is done and information stored on the internet cloud.
Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
King Fahd University of Petroleum & Minerals
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CHANGE ORDER & BACKCHARGES PREPARED BY ABDULAZIZ M. AL-BESHR ID# PREPARED FOR Dr. ABDULAZIZ BUBSHAIT.
LECTURE 4 FORMULATION & PRESENTATION OF MONETARY CLAIMS  Recovery of Loss / Expenses / Damages  Notice of intention to claim  Particular and further.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Copyright © 2007 Pearson Education Canada 1 Chapter 21: Completing the Audit.
1 CONTRACT COSTING. 2 Method where each contract is treated as cost unit and Profit & Loss is ascertained separately. Contract Costing defined: Employed.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Introducing Project Management Update December 2011.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
 Section Where you go if you disagree on either three elements entitlement, impacts or costs  Begins with the contractors notice 5 working days.
Measurement and Payment
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Copyright © 2007 Pearson Education Canada 1 Chapter 15: Audit of Cash Balances.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Outsourcing of Census Operations United Nations Statistics Division Regional Workshop on the 2010 World Programme on Population and Housing Censuses: International.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
University of Calgary Continuing Education
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Engineering Project Tendering.
ARCH 435 PROJECT MANAGEMENT
Agenda FYE June 30, 2020 Operating Budget
Agenda FYE June 30, 2020 Operating Budget
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

University of Calgary Continuing Education Construction Contract Law and Documents Week 12 Changes Delays Claims Contract Documentation

Why do companies lose money? They do work for nothing Either they don’t insist on proper instructions, or They don’t keep proper records to prove their costs, or They don’t ask properly for more money

Changes to the Work No right unless stated Right necessary to prevent Owner being held “hostage” Safeguards Work must be consistent with base contract Contractor must do the work – no matter if there is an agreement with respect to price Owner must pay for work

Changes to the Work Both time and cost Time Failure to agree to reasonable extension is direction to accelerate Float owned by contractor Change in time is change to project overall time – non-critical activities my not effect end-date but simply increase risk

Changes to the Work Cost What is cost? What components are already in and which are extras?

Delays Work interruption caused by anyone Notice must be given Accurate records are key to claim Equally important to record what happened as well as what was delayed

Claims Request for compensation for work undertaken or delays encountered for which no compensation has been received. Typically as a result of work done under protest or pursuant to a change directive

Claims When to start the claim – the day of award Critical that a “base line” is defined Generally the original project schedule Provided at the outset to owner Don’t use up float – the long bar Make sure that all assumptions documented Treat Project Plan as insurance

Claims Project Plan – critical to recovery of additional monies Must be able to show how you were going to achieve the work Updating to account for progress allows you to take advantage of situations where you have improved the project schedule and incorporate situations where you have delayed yourself

Claims Must find your basis for claim in the contract Proper notice must have been given Isolate the claimed extra from the base contract Identify all delays – including those caused by you Ideally, each change must be isolated from all others to determine the “impact” of it

Claims Impact of change Each change will create consequential changes in all other surrounding activities Possibly change equipment utilization, resource profiles When evaluating – ensure all implications investigated

Claims Impact of change Change itself  Adding xxx m3 of material Material changes  Effect on material order – did you have sufficient in your original commitment to allow you to price this at same level.  Material price escalation  Site handling – does this overstress logistical abilities of jobsite – cranes, access, personnel

Claims Impact of change Installation of materials – impact on labour  Resource profile – using critical trades  Overtime loading – extensive overtime causes fatigue and loss of productivity  Crowding – loss of productivity  Move work to different season or time of day – productivity  Move to different season – wage escalation

Claims Impact of change Impact on site plant  Additional site equipment required  Site services – roads, power, heat, scaffold  Change in fuel rates due to shift in time

Claims Impact of change Site Supervision  Stress supervision – inefficiency sets in  Additional QC required  Review of documents more extensive  Other work suffers from lack of supervision

Claims Impact of change Office supervision  Engineering costs – estimates and revised schedules  Project Management Costs – more intensive work, review project planning Financial  Effect on cash flow

Claims Impact of change Measurement of impact  From base line – add change and determine change to overall end cost and time  As change proceeds – updates will show ongoing impact

Claims Impact of changes on each other Impact of number of changes – magic number (15-25%) When job changed more than xx% - revert to cost reimbursable Not materially the same job

Project Documentation Project budget Your cost – not revenue Enumerate all resource profiles Show all anticipated cost changes (ie: prices)

Project Documentation Project schedule Detailed so that changes in order of work can be identified Show resources on critical activities Show owner supplied deliveries or work Allowance for approvals shown explicitely

Project Documentation Updating Project Plan Critical to ensure credibility (we do this normally – not just to show the error of the other party) Must reflect true activity – don’t try to hide your own dirty laundry Should be accurate record of the plan revisions necessitated by changing conditions

Project Documentation Correspondence Must be formal and organized All formal documentation, initially, should be to the notice address Subsequent, project kickoff meetings would define operational changes to flow of documents – must be confirmed in writing to notice address Separate files for each claim – suggested

Project Documentation Review Contract Note all notice requirements Note notice address No matter what, unless you have a formal instruction, always send Notices to Notice Address Pay particular attention to notices regarding delays, unexpected work, changes to the work – these are the prime source of claims for extras.

Project Documentation Routine Each level of management should review reports from level below Each level of management should prepare material for level above Concept of overlapping and complementary information

Project Documentation Examples Superintendent daily diary (independent corroboration of all site activity – personnel changes, tardiness, everything) Weekly site report by superintendent  Perhaps prepared by site engineer by endorsed by site supervisor  Reviewed by Project Manager Monthly report by project manager  Reviewed by company management.